词条 | Hawarden Bridge |
释义 |
|bridge_name = Hawarden Bridge |image = Hawarden Bridge over the River Dee - geograph.org.uk - 405378.jpg |caption = |official_name = Hawarden Bridge |carries = Borderlands Line |crosses = River Dee |locale = Deeside |maint = Network Rail |id = |designer = Mr C A Hobson |design = Swing bridge |material = |spans = 3 |pierswater = |mainspan = 85 m (278 ft) |length = |width = |height = |load = |clearance = |below = |traffic = |begin = 16 August 1887 |complete = |open = 3 August 1889 |heritage = |collapsed = |preceded = |followed = |closed = |toll = |map_cue = |map_image = |map_text = |map_width = |coordinates = {{coord|53.2172|-3.0332|display=inline,title}} |extra = }} Hawarden Bridge ({{IPAc-en|ˈ|h|ɑr|d|ən}}; {{lang-cy|Pont Penarlâg}}) crosses the River Dee, near Shotton, Flintshire, Wales. The railway bridge was built by the Manchester, Sheffield and Lincolnshire Railway (later the Great Central Railway), on the Chester & Connah's Quay Railway. It opened on 3 August 1889. Hawarden Bridge is on the Borderlands Line between Wrexham to Bidston. Hawarden Bridge railway station is on the north side of the bridge and Shotton station is on the south side. National Cycle Route 5 crosses the Dee on the bridge on the path adjacent to the railway line. On opening, Hawarden Bridge was largest swing bridge in the United Kingdom.[1] The highest temperature recorded in Wales – 35.2°C, was recorded at the bridge in August 1990.[1] In the 2010s, the bridge was restored enabling speed and axel load limitations to be raised. It is a Grade II listed structure.[1] HistoryIn the 1880s, the Manchester, Sheffield and Lincolnshire Railway built a line between Chester Northgate and Hawarden Bridge Junction.[1] It crossed the River Dee on a 165 metre-long bridge. The Board of Trade, advised by Sire George Nares, decreed that the bridge needed an opening of at least 140 feet to allow ships to pass through. In 1886, an Act of Parliament was obtained for the construction of a bridge.[5] The civil engineer C.A. Hobson designed a steel bridge. It was constructed by John Cochrane & Sons.[2] Construction took about two years and cost around £70,000. To overcome challenging conditions of the estuary, its foundations were built in brick-lined wells as directed by the project's chief engineer, Frances Fox.[7] The bridge was opened to traffic on 3 August 1889 by Catherine Gladstone, the wife of Prime Minister William Ewart Gladstone.[1][9] Reportedly, Gladstone laid the first cylinder in the river in an earlier ceremony to mark the commencement of construction.[3] Hawarden Bridge's central section, Span 10, contained the swing bridge. As built, it rotated through 90-degrees to enable the passage of tall ships. The 85-metre section weighed 764 metric tonnes and took 40 seconds to move between its closed and open positions.[1] The moving span was controlled from a manned tower next to the bridge; this bridge was demolished in 1976.[4] When built, it was the largest opening span of any swing bridge in the United Kingdom.[5] The bridge no longer opens, the span was welded shut decades ago. The last time it opened was in 1960. It was made redundant by the absence of tall ships.[1] The remains of the rotating mechanism – hydraulic cylinders attached to a drive chain and sprocket – are visible beneath the bridge but the pumping stations and the steam engines used for powering it have been demolished.[6] River traffic travels underneath the bridge from the Airbus factory at Broughton; the wings of the Airbus A380 are transported on barges along the Dee three times per week. They pass under the bridge before reaching the port of Mostyn where they are loaded onto larger sea-faring vessels.[6] Pedestrians and cyclists can cross the bridge via a walkway that connects the Wales Coast Path and the Chester Greenway Railway Path section of National Cycle Route 5. It is the responsibility of Sustrans Cymru.[7] In late 2003, improvements to the walkway were completed; it was widened so that mounted cyclists could pass pedestrians and cycle ramps were installed at both ends.[8] Exposure to the harsh conditions on the Dee Estuary for over one hundred years, degraded the condition of the bridge.[6] Erosion, caused by saltwater and weather, was attributed for its gradual degradation. Restrictions were imposed on rail traffic, axle load was limited to RA7, a maximum speed of 20mph was imposed and only the one track could loaded. Network Rail stated that a RA10 rating for the bridge imposing fewer restrictions was required.[6] In 2009, councillors became concerned about cracks in the bridge's supporting brickwork. An inspection by Network Rail determined it was safe and the damage was largely aesthetic.[9] In the 2010s, a major strengthening and restoration programme was started.[10][11] The work was carried out in two phases, strengthening was carried out before the erection of the soffit scaffolding, followed by abrasive blasting and repainting. Aluminium scaffolding was used because the bridge was not strong enough to support heavier steel scaffolding. The bridge remained open to river and rail traffic throughout. A 5mph speed limit was imposed on the bridge due to the tight clearances involved.[6] Restoration, completed on 12 November 2014, cost of £8 million and involved installing 130 tonnes of steel, 12,000 tension control bolts, and in excess of 85,000 man hours. An RA10 rating was instated and all operational restrictions were removed.[6][12] See also
ReferencesCitations1. ^Edben, Philip. “Weather in Wales – The Welsh Climate.” ‘’The Daily Telegraph’’, 29 May 1999. 2. ^{{Cite web |url=http://www.disused-stations.org.uk/features/hawarden_loop/hawarden_bridge/index.shtml |title=Disused Stations:Hawarden Bridge |website=www.disused-stations.org.uk |access-date=10 July 2018}} 3. ^1 “Hawarden Bridge.” ‘’shotton-tc.co.uk’’, Retrieved: 30 July 2018. 4. ^“A History of Sealand — the community that rose from the sea.” ‘’sealandcommunitycouncil.gov.uk’’, Retrieved: 30 July 2018. 5. ^1 Fox, Francis. [https://www.icevirtuallibrary.com/doi/abs/10.1680/imotp.1892.20200 “The Hawarden Bridge.”] ‘’Institute of Civil Engineers (ICE)’’, Volume 108, Issue 1892, 1892. pp. 304-317. PART 2. E-ISSN 1753-7843. 6. ^1 2 3 4 5 6 7 8 9 10 11 Johnson, Marc. [https://www.railengineer.uk/2015/02/16/hawarden-swing-bridge/ “Hawarden Swing Bridge.”] ‘’Rail Engineer’’, 16 February 2015. 7. ^“Hawarden Bridge is closed today to cyclists and walkers on for essential maintenance.” ‘’deeside.com’’, 13 December 2016. 8. ^1 [https://www.dailypost.co.uk/news/local-news/dee-light-at-crossing-revamp-2938027 “Dee-light at crossing revamp.”] ‘’dailypost.co.uk’’, 24 October 2003. 9. ^[https://www.chesterchronicle.co.uk/news/local-news/rail-bosses-reassure-hawarden-bridge-5218499 “Rail bosses reassure Hawarden bridge is safe.”] ‘’The Chester Chronicle’’, 23 July 2013. 10. ^[https://www.networkrailmediacentre.co.uk/news/major-work-to-strengthen-hawarden-railway-bridge-completed# “Major work to strengthen Hawarden railway bridge completed.”] ‘’Network Rail Media Centre’’, 14 November 2014. 11. ^Doman, Robert. “£8m scheme restores Hawarden bridge to former glory.” ‘’leaderlive.co.uk’’, 13 November 2014. 12. ^“Hawarden Swing Bridge.” ‘’AMCO’’, Retrieved: 30 July 2018. External links
|structure = Crossings |place = River Dee |bridge = Hawarden Bridge |bridge signs = |upstream = Jubilee Bridge |upstream signs = |downstream = Flintshire Bridge |downstream signs = }} 8 : Railway bridges in Wales|Swing bridges in Wales|Bridges in Flintshire|Great Central Railway|Bridges completed in 1889|Bridges across the River Dee, Wales|Grade II listed buildings in Flintshire|Grade II listed bridges in Wales |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。