  1. History

  2. Rolling stock

  3. Network

     Milan to Salerno Corridor    Turin to Trieste Corridor    Ports and Trans European Connections  

  4. Future lines

  5. See also

  6. Further reading

  7. External links

  8. References

{{multiple image
| width1 = 174
| width2 = 196
| image1 = ETR 500 Frecciarossa.jpg
| caption1 = ETR 500 Frecciarossa (Trenitalia)
| image2 = Elettrotreno ETR.400.jpg
| caption2 = ETR 1000 Frecciarossa 1000 (Trenitalia){{multiple image
| width1 = 200
| width2 = 200
| align =
| direction =
| width =
| image1 = Italo NTV Class ETR 575 No 575-154.jpg
| caption1 = AGV 575 Italo (NTV)
| image2 = Frecciaargento 600 112.jpg
| caption2 = ETR 600 Frecciargento (Trenitalia)
}}High-speed rail in Italy consists of two lines connecting most of the country's major cities. The first line connects Turin to Salerno via Milan, Bologna, Florence, Rome and Naples, the second runs from Turin to Venice via Milan, and is under construction in parts.[1]

Trains are operated with a top speed of {{convert|300|km/h|abbr=on}}.

Passenger service is provided by Trenitalia and, since April 2012, by NTV-Italo, the world's first private open-access operator of high-speed rail to compete with a state-owned monopoly.

25 million passengers traveled on the network in 2011.[2]

In 2015, ridership increased to 55 million for Trenitalia[3] and 9.1 million for NTV,[4] for a combined 64 million passengers.

History

{{image frame
|width=320
|content=
{{ #invoke:Chart | bar chart
| height = 200
| width = 300
| stack = 1
| group 1 = 0 : 0 : 0 : 0.9 : 2.6 : 2.8 : 4.0 : 4.8
| group 2 = 13.5: 13.6 : 14.1 : 14 : 14.6: 15.1: 15.9 : 15.2
| colors = red : green
| group names = NTV : Trenitalia
| units suffix = _billion passenger km
| x legends = 2009 : : : 2012 : : : : 2016

}}


|caption=Passenger km transported on the Italian high speed rail network[5]
}}

The first high-speed rail route in Italy, the Direttissima, opened in 1977, connecting Rome with Florence. The top speed on the line was {{convert|250|km/h|abbr=on}}, giving an end-to-end journey time of about 90 minutes with an average speed of {{convert|200|km/h|abbr=on}}. This line used a 3 kV DC supply.

High-speed service was introduced on the Rome-Milan line in 1988-89 with the ETR 450 Pendolino train, with a top speed of 250 km/h and cutting travel times from about 5 hours to 4.[6]

The prototype train ETR X 500 was the first Italian train to reach {{convert|300|km/h|abbr=on}} on the Direttissima on 25 May 1989.[6]

The Italian high-speed rail projects suffered from a number of cost overruns and delays. Corruption and unethical behaviour played a key role. [7]

Rolling stock

{{See also|ElettroTreno}}

Service on the high speed lines is provided by Trenitalia and privately owned NTV. Several types of high-speed trains carry out the service:

  • ETR 500: non-tilting, speeds up to {{convert|300|km/h|abbr=on}}, operated by Trenitalia as the Frecciarossa;
  • ETR 600, tilting, speeds up to {{convert|250|km/h|abbr=on}}, operated by Trenitalia as the Frecciargento. It operates mainly on traditional lines;
  • ETR 610: tilting, speeds up to {{convert|250|km/h|abbr=on}}, operated by Trenitalia on services between Italy and Switzerland.
  • AGV575: non tilting, speeds up to {{convert|360|km/h|abbr=on}}, operated by NTV as Italo;
  • ETR 1000: non tilting, operated by Trenitalia, it can reach {{convert|400|km/h|abbr=on}} and has operational speed of {{convert|360|km/h|abbr=on}}.[8] Maximum speed of these trainsets is currently limited at {{convert|300|km/h|abbr=on}} after plans for {{convert|360|km/h|abbr=on}} operations were cancelled.[9]

Current limitations on the tracks set at {{convert|300|km/h|abbr=on}} the maximum operating speed of the trains. Along with the development of ETR 1000 by AnsaldoBreda and Bombardier Transportation (which is designed to operate commercially at {{convert|360|km/h|abbr=on}}, with a technical top speed of over {{convert|400|km/h|abbr=on}}), with Rete Ferroviaria Italiana working on the necessary updates to allow trains to speed up to {{convert|360|km/h|abbr=on}}. On May 28th, 2018, the Ministry for Infrastructures and Transportation and the National Association for Railway Safety decided not to run the 385 km/h tests required to allow commercial operation at 350 km/h, thus limiting the maximum commercial speed on the existing Italian high-speed lines to 300 km/h and cancelling the project.[10][11]

TGV trains also run on the Paris-Turin-Milan service, but do not use any high-speed line in Italy.[12]

Network

The following high-speed rail lines are in use.

Line Length
km
Opening Travel time Top speed
km/h
Voltage
Florence–Rome "Direttissima" 254 1978-02-24 / 1992-05-26 1:18 250[14] 3 kV DC
Rome–Naples 205 2005-12-19 / 2009-12-13 1:08 300[14] 25 kV 50 Hz
Turin–Milan 125 2006-02-10 (Turin-Novara)
2009-12-13 (Novara-Milan)
0:44 300[14] 25 kV 50 Hz
Padua–Venice (Mestre)
Part of the future Milan–Venice high-speed line
25 2007-03-01 0:14 240[14] 3 kV DC
Milan–Brescia
Part of the future Milan–Venice high-speed line
67[1] 2007-06-10 (Milano-Treviglio)
2016-12-11 (Treviglio-Brescia)
0:36 180 (Milano-Treviglio) [13]
300 (Treviglio-Brescia)
25 kV 50 Hz
Naples-Salerno "via Linea Monte Vesuvio" (L.M.V.) 29 2008-06 0:30 250[13] 3 kV DC
Milan–Bologna 215 2008-12-13[14] 0:53 300[13] 25 kV 50 Hz
Bologna–Florence 79 2009-12-05 0:35 300[13] 25 kV 50 Hz
Total 974

The table shows minimum and maximum (depending on stops) travel times.[15]

BolognaFlorenceMilanNaplesRomeTurin
Bologna-0:350:533:15 (3:35)1:54 (2:03)2:02
Florence0:35-1:312:31 (2:51)1:18 (1:45)2:38
Milan0:531:31-3:50 (4:18)2:40 (3:08)0:44 (1:00)
Naples3:15 (3:35)2:31 (2:51)3:50 (4:18)-1:085:00 (5:25)
Rome1:54 (2:35)1:18 (1:45)2:40 (3:08)1:08-3:48
Turin2:022:380:44 (1:00)5:00 (5:25)3:48-

Milan to Salerno Corridor

The Milan to Salerno is the major north-south corridor of the high-speed network.

The Milan–Bologna segment opened on 13 December 2008. Its construction cost was about 6.9 billion euro. The {{convert|182|km|mi|abbr=on}} line runs parallel to the Autostrada del Sole, crossing seven provinces and 32 municipalities. There are eight connections with historic lines. At the Reggio Emilia interconnection a new station designed by the Valencian architect Santiago Calatrava was opened in June 2013. Calatrava has also designed a signature bridge where the line crosses the A1 motorway. The line travels through a new multi-level station at Bologna (Italy's principal railway junction) designed by Japanese architect Arata Isozaki.

The Bologna–Florence segment opened on 12 December 2009, allowing a 37-minute journey between the two cities. The Bologna-Florence high-speed section was particularly complex to build mainly because about 93% of its {{convert|78.5|km|abbr=on}} runs through tunnels under the Apennines range. The line has nine tunnels, from 600 meters to {{convert|18.5|km|abbr=on}} long, separated by short surface stretches (less than 5 km in total). Florence will have a major new multi-level high speed station at Belfiore designed by British architect Norman Foster.

The Florence–Rome segment consists of the older "Direttissima" (literally: most direct) line between the two cities, with a length of {{convert|240|km|abbr=on}}. The first high-speed line in Europe, the "Direttissima" was completed in between 1977 and 1986. This segment is being upgraded by Treno Alta Velocità. Entering Rome, high-speed trains have the option of stopping at either the new intermodal station at Tiburtina, developed by architects ABD Associate led by Paolo Desideri, or Termini station.

The Rome-Naples segment heads south from the Italian capital. Service on the first new high speed segment of the project started in December 2005. This line runs through 61 municipalities in two regions (Latium and Campania) and connects with the existing national rail network at Frosinone Nord, Cassino Sud and Caserta Nord. On 13 December 2009 Work was completed on the last 18 km of the line between Gricignano and Napoli Centrale. In the Campania region the line passes through Afragola where a major new transfer station will be developed, designed by Iraqi-born architect Zaha Hadid.

Turin to Trieste Corridor

The Turin to Novara segment of the Turin to Trieste corridor runs for 85 km and opened in February 2006. The Novara to Milan segment opened on 12 December 2009, allowing a 59-minute journey between Milan Centrale and Turin Porta Nuova (45 minutes from Milan Porta Garibaldi to Turin Porta Susa). The two segments combine for a total of 125 km, 80% (98 km) of which are in the region of Piemonte (provinces of Turin, Vercelli and Novara) and 20% (27 km) in the region of Lombardy (province of Milan). To minimize its impact on the area, the Turin to Milan segment runs inside the existing infrastructure corridor, next to the A4 Turin-Milan motorway.

The Milan to Venice segment includes stretches from Padova to Mestre (for Venice) and Milan to Treviglio now in service. Priority sections of track are under construction: tracks from Treviglio to Brescia were opened in 2016.[17]

Ports and Trans European Connections

A new line connecting Milan to the port of Genoa is now in development and further expansion of the trans-Alpine lines will integrate the Italian network into the European networks planned by the EU and the large intermodal pan-European transport corridors.

The objective of the new Alpine rail links is to increase rail transport, aimed mainly at supporting the forecast development of freight transport on international lines, complete interoperability between European High Speed networks, the shift from road to rail of a large percentage of freight for modal rebalancing, higher safety levels in tunnels as specified in the new European technology and construction standards.

Planned engineering works include the construction of new international lines and the upgrading of existing Italian track on the following lines:

  • Frejus (Turin-Lyons)
  • Gotthard (Chiasso-Monza and Gallarate-Bellinzona)
  • Simplon (Domodossola-Novara)
  • Brenner (Fortezza-Innsbruck)
  • Tarvisio - Semmering (Udine-Tarvisio)
  • Eastern Pass Valico Orientale (Venice-Trieste-Ronchi dei Legionari)

Future lines

  • Milan-Venice
  • Milan-Genoa: the project was approved in 2006; construction work started in 2011.[18]
  • Turin-Lyon: the Turin-Lyon line should connect Turin, Lyon and Chambéry, and join the Italian TAV and the French TGV networks. It would take over the role of the current Fréjus railway.
  • Milan-Chiasso: a route connecting the Italian high-speed rail network to Switzerland and Germany is conceived through a Swiss project NRLA, which includes the Gotthard Base Tunnel and the Lötschberg Base Tunnel.
  • Brenner Base Tunnel: the Brenner Base Tunnel will link Verona, Innsbruck, and Munich, and thus connect the Italian, Austrian and German railways. The Brenner tunnel is the most important link in a series of projects that will create a single connection from Berlin in Germany to Palermo in Sicily as part of the Trans-European Transport Networks. In December 2008, Antonio Tajani, the European commissioner for transport, approved funds totalling €1.7 billion to finance 11 railway projects that together should establish two major north-south routes across the European continent.
  • Trieste-Slovenian border-Ljubljana: a connection with Ljubljana would encourage rail development into Eastern Europe and link the Slovenian Pendolino and Italian TAV networks.{{according to whom|date=February 2014}}
  • Naples-Bari: the construction has begun[19] and the route will cut Rome-Bari journeys from 3h59m to 3h00m.[20]

See also

{{Portal|Trains}}
  • Ferrovie dello Stato
  • Nuovo Trasporto Viaggiatori
  • Railway stations in Italy
  • Rete Ferroviaria Italiana
  • Trenitalia
  • Treno Alta Velocità

Further reading

  • Binari dal Tevere all'Arno. La nuova linea direttissima Roma-Firenze, Roma, Ufficio relazioni aziendali delle Ferrovie dello Stato, 1974
  • La Direttissima Roma-Firenze, in Ingegneria ferroviaria, gennaio 1978
  • Azienda autonoma Ferrovie dello Stato, Direttissima Roma-Firenze, Roma, Ufficio relazioni aziendali delle Ferrovie dello Stato, 1978
  • La Direttissima Roma-Firenze, in Ingegneria ferroviaria, marzo 1991
  • Giampaolo Mancini, Donato Carillo, Mauro Papi, Prove a 320 km/h dell'ETR 500 Politensione, in Ingegneria ferroviaria, 56 (2001), n. 8, pp. 513–519
  • Bruno Cirillo, Paolo Comastri, Pier Luigi Guida, Antonio Ventimiglia, L'Alta Velocità ferroviaria, Roma, Collegio Ingegneri Ferroviari Italiani, 2009, {{ISBN|978-88-95634-05-0}},

External links

  • [https://web.archive.org/web/20090616071330/http://www.rfi.it/cms/v/index.jsp?vgnextoid=4c5890e4d9aba110VgnVCM1000003f16f90aRCRD rfi.it] - Rete Ferroviaria Italiana (RFI), infrastructure manager
  • Railway Technology.com article on Italian High Speed Rail, including NTV
  • trenitalia.com - Trenitalia official website and online booking
  • italotreno.it - Nuovo Trasporto Viaggiatori (NTV) Italo online booking

References

1. ^{{cite news|title=Brescia high speed line construction begins|url=http://www.railwaygazette.com/nc/news/single-view/view/brescia-high-speed-line-construction-begins.html|accessdate=14 July 2012|newspaper=Railway Gazette|date=11 May 2012}}
2. ^{{cite web|title=Alta velocità e concorrenza: parte la sfida|url=http://www.ilsole24ore.com/art/impresa-e-territori/2012-04-24/alta-velocita-concorrenza-parte-160359.shtml?uuid=AbHufzSF|publisher=il Sole 24 Ore|accessdate=28 April 2012}}
3. ^{{cite news|title=Alta velocità, in dieci anni 300 milioni di passeggeri|url=http://www.ilsole24ore.com/art/impresa-e-territori/2016-06-07/alta-velocita-dieci-anni-300-milioni-passeggeri-135709.shtml?uuid=ADRy3fX&refresh_ce=1|accessdate=4 July 2017|work=Il Sole 24 ORE|language=it}}
4. ^{{cite web|url=http://www.italiaoggi.it/news/dettaglio_news.asp?id=201603111236498612&chkAgenzie=ITALIAOGGI&titolo=Ntv,%20nel%202015%20arriva%20il%20primo%20utile:%201,8%20milioni|title=Articolo su Italiaoggi.it}}
5. ^{{cite web|title=Il mercato del Trasporto Ferroviario A/V - NTV, Nuovo Trasporto Viaggiatori|url=https://www.ntvspa.it/investor-relations/il-mercato-del-trasporto-ferroviario-a-v.html|website=www.ntvspa.it|accessdate=13 October 2017|language=it}}
6. ^{{cite web|title=Alta velocità. Una storia di successi tutti italiani|url=http://www.fsitaliane.it/cms-file/allegati/ferrovie/Una_storia_di_successi.pdf|publisher=Trenitalia|accessdate=16 December 2011}}
7. ^{{Cite journal|last=Locatelli|first=Giorgio|last2=Mariani|first2=Giacomo|last3=Sainati|first3=Tristano|last4=Greco|first4=Marco|date=2017-04-01|title=Corruption in public projects and megaprojects: There is an elephant in the room!|url=http://www.sciencedirect.com/science/article/pii/S0263786316301090|journal=International Journal of Project Management|volume=35|issue=3|pages=252–268|doi=10.1016/j.ijproman.2016.09.010}}
8. ^Marco Morino: All'Expo con il Frecciarossa 1000 Il Sole 24 Ore, 7 August 2014
9. ^{{Cite web|url=https://www.railjournal.com/passenger/high-speed/italy-rejects-plans-to-increase-speed-to-350km-h/|title=Italy rejects plans to increase speed to 350km/h|date=2018-05-31|website=International Railway Journal|language=en|access-date=2019-03-15}}
10. ^{{Cite web|url=https://www.railjournal.com/passenger/high-speed/rfi-fined-for-discrimination-in-planning-for-360km-h-operation/|title=RFI fined for discrimination in planning for 360km/h operation|date=2018-08-08|website=International Railway Journal|language=en|access-date=2019-03-15}}
11. ^Lucio Cillis:   Repubblica Affari e Finanza, 2018-05-28
12. ^Substantial travel time differences between the French TGV (around 80 minutes) and Italian high speed trains (around 50 minutes) (Both non-stop times). This time difference of 30 minutes can only be caused by the TGV taking the slower classic route. The fast regional trains who do not take the high speed take only slightly a bit longer, but they have more stops. There is one TGV that stops in Novara with only marginal extra time. It is not possible to stop in Novara without using the Novara - Milan old classic line. Consulted 2017 and 2016 timetables.
13. ^see Fascicoli Circolazione Linee links in [https://normativaesercizio.rfi.it/Default.aspx] for technical data of RFI (Rete Ferroviaria Italiana) lines
14. ^Reuters [https://www.reuters.com/article/technologyNews/idUSTRE4BC1F320081213 Italy launches Milan-Bologna high speed train link] December 13, 2008
15. ^The table is based on Trenitalia timetables (2011)
16. ^{{cite web |url=http://www.corriere.it/cronache/09_febbraio_04/treno_record_galleria_8806fdfa-f2ce-11dd-8878-00144f02aabc.shtml |title=Due record in prova per il Frecciarossa |date=2009-02-04 |publisher=Repubblica |language=Italian |accessdate=2009-02-05}}
17. ^http://www.railwaygazette.com/news/news/europe/single-view/view/high-speed-network-grows-as-brescia-treviglio-route-opens.html?sword_list[]=brescia&no_cache=1
18. ^{{cite web |url=http://www.rfi.it/cms/v/index.jsp?vgnextoid=fa5db4050e64c110VgnVCM1000003f16f90aRCRD |title=Archived copy |accessdate=2015-03-28 |deadurl=yes |archiveurl=https://web.archive.org/web/20150402151554/http://www.rfi.it/cms/v/index.jsp?vgnextoid=fa5db4050e64c110VgnVCM1000003f16f90aRCRD |archivedate=2015-04-02 |df= }}
19. ^{{cite web|url=http://www.railjournal.com/index.php/policy/fs-to-invest-E94bn-and-double-turnover-by-2026.html|title=FS to invest €94bn and double turnover by 2026|first=David|last=Briginshaw}}
20. ^{{cite web|url=http://www.railjournal.com/index.php/high-speed/tendering-begins-for-naples-bari-high-speed-line.html|title=Tendering begins for Naples - Bari high-speed line|first=Marco|last=Chiandoni}}
{{High-speed rail}}

1 : High-speed rail in Italy

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/11 15:02:14