请输入您要查询的百科知识:

 

词条 Hokkaido Electric Power Company
释义

  1. Facilities

  2. Generating capacity by source

  3. References

  4. External links

{{Infobox company
| name = Hokkaido Electric Power Company
| logo =
| caption =
| type = Public KK {{tyo|9509}}
| predecessor =
| foundation =
| location_city = Sapporo, Ishikari Subprefecture, Hokkaido
| location_country = Japan
| locations =
| area_served = Hokkaido
| industry = Energy
| revenue = ¥603,032 million (FY2014, consolidated)
| operating_income =
| net_income = ¥(64,207) million (FY2014, consolidated, loss)
| assets = ¥1,782,776 million (FY2014, consolidated)
| equity =
| num_employees = 6,711 (FY2011, consolidated)
| homepage = {{URL|www.hepco.co.jp/english/index.html}}
| footnotes =
}}

The {{nihongo|Hokkaido Electric Power Company|北海道電力株式会社|Hokkaidō Denryoku Kabushiki-gaisha}} ({{tyo|9509}}), or {{nihongo|Hokuden|ほくでん}} for short, is the monopoly electric company of Hokkaidō, Japan. It is also known as Dōden and HEPCO. The company is traded on the Tokyo Stock Exchange (first section), Osaka Securities Exchange (first section), and Sapporo Securities Exchange.

According to the company profile, during fiscal 2011 (i.e. 1 April 2010 to 31 March 2011), 26% of the electricity generated was from nuclear, 31% from coal, 15% from hydro, 8% from oil and 2% from 'new energy' sources.[1]

Hokkaido only has one nuclear power station, the Tomari Nuclear Power Plant.

Facilities

  • Nuclear
    • Tomari (ja:泊発電所)(2,070 MW)
  • Coal
    • Tomato-atsuma Thermal Power Station (ja:苫東厚真発電所)(1,650 MW)
    • Naie (奈井江発電所)(350 MW)
    • Sunagawa (砂川発電所)(250 MW)
  • Geothermal energy
    • Mori (ja:森発電所)(2.5 MW)
  • Hydro electric – 53 dams including the following:[2]
    • Hoheikyo, Ishikari River (50 MW)
    • Kamiiwamatsu, Tokachi River (30.4 MW)
    • Niikappu, Niikappu River(200 MW)
    • Nokanan, Ishikari River (30 MW)
    • Okuniikappu, Niikappu River (44 MW)
    • Shizunai, Shizunai River (48 MW)
    • Takami, Shizunai River(200 MW)
    • Takisato, Ishikari River (57 MW)
    • Tokachi, Tokachi River (40 MW)
    • Tomura, Tokachi River (40 MW)
    • Uryu, Ishikari River (51 MW)
  • Oil
    • Date (伊達発電所)(700 MW)
    • Shiriuchi (知内発電所)(700 MW)
    • Tomakomai (苫小牧発電所)(250 MW)
  • Diesel
    • Onbetsu (音別発電所)(280 MW)

Others;

  • Wind farms – 3 facilities(1.58 MW)
  • Solar (photovoltaic) energy – 9 facilities(146 kW)

Generating capacity by source

Electricity producing capacity by source[3]
Source Megawatts Percentage Number of units
Coal 2,250 30 3
Nuclear 2,070 27.5 3
Oil 1,650 22 3
Hydro 1,231 16 53
Diesel 280 4 1
Geo-thermal 50 0.5 1
Other 2 -
Total 7,533100 62?
{{Clear}}

References

Notes
1. ^Corporate profile page of Hokkaido Electric Power Company, accessed 10 September 2011
2. ^Kyogoku pumped storage project is under construction and due for completion in 2015. It will provide 600 MW.
3. ^*HEPCO Sustainability Report 2008 {{webarchive|url=https://web.archive.org/web/20111002033303/http://www.hepco.co.jp/english/environment/pdf/report2008.pdf |date=2011-10-02 }}
Sources
  • This article incorporates material from 北海道電力 ("Hokkaido Electric Power") in the Japanese Wikipedia, retrieved on September 29, 2007.

External links

{{Commons category|Hokkaido Electric Power Company}}
  • Hokkaido Electric Power Co., Inc. (in English)
  • [https://web.archive.org/web/20111002033303/http://www.hepco.co.jp/english/environment/pdf/report2008.pdf HEPCO Sustainability Report 2008] (in English)
{{Utilities of Japan}}

3 : Nuclear power companies of Japan|Power companies of Japan|Companies based in Sapporo

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/22 19:23:58