请输入您要查询的百科知识:

 

词条 Hyderabad Metro
释义

  1. History

     Initial bidding  Re-bidding    Mascot   Awards and nominations   Construction history 

  2. Construction phases

     Phase I  Construction schedule  Phase II 

  3. Current status

  4. Lines

     Red Line: Miyapur – L.B. Nagar   Green Line: JBS – Falaknuma   Blue Line: Nagole - Raidurg  

  5. Depots

      Phase 1  

  6. Reception

  7. Cost

  8. Infrastructure

     CBTC Technology  Rolling stock  Ticketing   Stations  

  9. See also

  10. References

  11. External links

{{Use Indian English|date=November 2014}}{{Use dmy dates|date=September 2017}}{{Infobox public transit
| box_width = 3
| name = Hyderabad Metro
| image = Hyderabad Metro Rail Logo.svg
| imagesize = 80px
| alt = Hyderabad Metro Logo
| caption =
| image2 =
| imagesize2 = 300px
| alt2 = Hyderabad Metro Rail
| caption2 = Hyderabad Metro Rail
| image3 =
| imagesize3 =
| alt3 =
| caption3 =
| owner = Government of Telangana (10%)
Larsen & Toubro (90%)
| area served =
| locale = Hyderabad, Telangana, India
| transit_type = Rapid Transit
| lines = 2
| line_number =
| start =
| end =
| stations = 61
| daily_ridership = 220,000 [1]
| weekly_ridership =
| annual_ridership =
| chief_executive = N. V. S. Reddy[2]
| headquarters = Metro Bhawan, Rasoolpura,Begumpet, Hyderabad
| website = {{url|http://www.ltmetro.in/|L&T Metro}}
{{url|http://hmrl.telangana.gov.in|HMRL}}
| began_operation = 29 November 2017[3]
| ended_operation =
| operator = Hyderabad Metro Rail Ltd. (HMRL)
| marks =
| host =
| character =
| vehicles =
| train_length =
| headway = 3.5 - 8 minutes
| system_length = {{cvt|72|km}}
{{cvt|56.5|km}} (Operational)
| notrack = 2
| track_gauge = {{RailGauge|sg|allk=on}}
| ogauge =
| minimum_radius_of_curvature =
| el = 25 kV, AC Overhead catenary
| average_speed = {{convert|35|km/h|abbr=on}}
| top_speed = {{convert|80|km/h|abbr=on}}
| map =
| map_state =
| map_name = Hyderabad Metro Rail
}}

The Hyderabad Metro is a rapid transit system, serving the city of Hyderabad, Telangana, India.[4] It is in Secant Operational model. It is being implemented entirely on Public Private Partnership (PPP)) basis,[5] with the state government holding a minority equity stake.[6] A 30 km stretch from Miyapur to Nagole, having 24 stations was inaugurated on 28 November 2017 by Prime Minister Narendra Modi.[7][8] No other rapid transit metro service in India opened for public operations on such a long stretch of 30 km.[9][10] As of April 2019, Hyderabad Metro is the Second longest operational metro network in India after Delhi Metro [11] It is estimated to cost {{INRConvert|18800|c}}. As of April 2019, about 220,000 people use the Metro per day.[12] Trains are crowded during the morning and evening hours, when employees travel to and from work.[13] A ladies only coach was introduced on all the trains from 7 May 2018.[14]

History

To respond the rising public transport needs and mitigate escalating vehicular traffic in the twin-cities of Hyderabad and Secunderabad, the State Government and the South Central Railway jointly launched the Multi Modal Transport System (MMTS) in [August] 2003.[15] The increase in population of Hyderabad made MMTS alone insufficient for public transport, which led to Union Ministry of Urban Development giving the nod for the Hyderabad Metro Rail Project and directed the DMRC to conduct a survey on the project.[16] this project was seen necessary in view that the population of Hyderabad was forecasted to reach 13.6 million by the year 2021.[16] According to the initial plan, the metro was to be connected with the already existing MMTS to provide commuters with alternate modes of transport. Simultaneously, the proposals for taking up the construction of MMTS Phase-II were also taken forward.[17]

On March 26, 2018, Telangana Govt announced that it would set up a SPV "Hyderabad Airport Metro Limited (HAML)", jointly promoted by HMRL and HMDA, to extend the Blue line from Raidurg to Rajiv Gandhi International Airport, Shamshabad.

Initial bidding

The bidding process was completed by July 2008 and awarded to Maytas which failed to achieve financial closure for the project as per schedule By March 2009. In July 2009, the State Government cancelled the contract and called for fresh bids for the project.

Re-bidding

In the July-2010 rebidding process, Larsen & Toubro (L&T) emerged as the lowest bidder for the {{INRConvert|121.32|b}} project. L&T came forward to take up the work for about {{INRConvert|14.58|b}} as viability gap funding as against the sanctioned {{INRConvert|48.53|b}}.

Mascot

The mascot of Hyderabad Metro Rail is Niz. It was derived from the word Nizam, who ruled the princely state of Hyderabad.[18]

Awards and nominations

HMR project was showcased as one of the top 100 strategic global infrastructure projects at the Global Infrastructure Leadership Forum held in New York during February–March 2013.[19]

[20]

L&T Metro Rail Hyderabad Limited (LTMRHL) has been conferred the SAP ACE Award 2015 in the 'Strategic HR and Talent Management[21]' category.

In 2018, Rasoolpura, Paradise and Prakash Nagar metro stations were awarded Indian Green Building Council's (IGBC) Green MRTS Platinum Award.[22]

Hyderabad Metro was adjudged as the Best Urban Mass Transit Project by the Government of India, in November 2018.[23]

Construction history

Groundbreaking (Bhoomi Puja) for the project was conducted on 26 April 2012[24] the concessionaire started the pillar erection on the same day for Stage-I and on 6 June 2012 for Stage-II.[25] The work for Corridor 2 has been delayed due to traders in Koti and Sultan Bazar demanding realignment of the route to safeguard traders and old age heritage markets.[26] If the recent bill proposed in Parliament which allows construction within a 100 metre radius of heritage structures and sites of historical or archaeological importance is passed, Metro might receive a chance as it helps to connect the Old city with IT corridor.[27]

The construction of the entire 71.16 km has been split into 6 stages with the first stage originally scheduled to be completed by March 2015[28][29]

In November 2013, L&T Hyderabad Metro started laying of rails on the metro viaduct between Nagole and Mettuguda, a stretch of 8 km.[30]

The first highly sophisticated train of the Hyderabad Metro Rail (HMR) came from Korea during the third week of May 2014. Stringent trial runs commenced from June 2014 till February 2015.[31] The trial runs started on the Miyapur to Sanjeeva Reddy Nagar stretch in October 2015.

CMRS inspection for Stage-II (Miyapur and S.R.Nagar Section) was done on 9, 10 August 2016.[32]

Three interchanges are planned at Mahatma Gandhi Bus Terminus, Parade Grounds and Ameerpet.[33]

The steel bridge of the HMR was successfully placed over the Oliphant bridge in August 2017.[34][35]

In November 2017, Commissioner of Railway Safety (CMRS) granted safety approval for 12 km stretch from Miyapur to SR Nagar, 10 km stretch from SR Nagar to Mettuguda and 8 km stretch from Nagole to Mettuguda.[36]

16-km Ameerpet-LB Nagar Metro stretch was opened for commercial operations from 24 September 2018.[37]

Construction phases

The construction work was undertaken in two phases. There are six stages of completion in Phase I.[38]

Phase I

The Phase I of the project includes 3 lines covering a distance of around 72 km. The metro rail stretches between Nagole and Secunderabad  km originally scheduled to be operational by December 2015, is now partially operational since 29 November 2017. The entire 72 km 57-station first phase is due to be completed by December 2019 with Hitec City - Raidurg line and MGBS - Falaknuma line is scheduled to be completed by December 2019.[39]

  • Line 1 - Red Line - Miyapur – LB Nagar - {{cvt|29.2|km}} 27 stations
  • Line 2 - Green Line - JBS - Falaknuma {{cvt|15|km}} 15 stations
  • Line 3 - Blue Line - Nagole – Raidurg - {{cvt|28|km}} 24 stations

Construction schedule

Stage Target Section Distance Line Line ColourStatus
Stage 1NagoleAmeerpet17.01|km}}Line IIIBlueOperational
Stage 2MiyapurLB Nagar29.2|km}} Line IRedOperational
Stage 3/1AmeerpetHitec City10|km}} Line IIIBlueOperational
Stage 3/2Hitec CityRaidurg1.47|km}} Line IIIBlueUnder construction
Stage 4/1JBSMGBS9.68|km}}Line IIGreenUnder Construction
Stage 4/2MGBSFalaknuma5.36|km}}Line IIGreenUnder Construction
Total72|km}}

Note: Stage 4/2 MGBS - Falaknuma section (5.36 km) is also part of the initial phase - I, but has been rumored that the state government might take up this section instead of L&T, but will be completed along with the phase - I work. The Stage 3/2 Hitec City - Raidurg section (1.3 km) of Corridor III was not initial part of phase - I, it was later on added by the newly elected state government. This section is scheduled to open by end of 2019.

Phase II

The Government is planning second phase of metro rail extending further.[40] The construction of Phase II will be taken up solely by the state government, instead of Public Private Partnership (PPP) mode in Phase I.[41] Delhi Metro Rail Corporation (DMRC) was entrusted to give a detailed project report (DPR) for Phase II.[42] Metro Rail Phase II expansion plan is for about 60 km, which includes providing link to Shamshabad RGI Airport.[43] The proposed routes are as following:

Target Section Distance (in km) Line
RaidurgGachibowli Shamshabad RGI Airport30|km}} Line IV
NagoleLB NagarFalaknumaShamshabad RGI Airport28|km}} Line III extension
MiyapurGachibowliTolichowkiLakdi ka pul20|km}}Line V
MiyapurBHEL-Patancheru15|km}} Line I extension
LB NagarHayath Nagar7|km}} Line I extension
JBSAlwal8|km}} Line II extension
TarnakaECIL 'X' Roads7|km}} Line VI

Current status

{{Main|List of Hyderabad Metro stations}}
LineFirst operationalLast extensionStationsLengthTerminalsRolling stockTrack gauge
(mm)
PowerAverage Frequency (Minutes)
Red 29 November 2017 24 September 20182729.2|km|}}MiyapurLB Nagar143525 kV OHE6.5
Blue 29 November 2017 20 March 20192125.3|km|}}HITEC City Nagole 143525 kV OHE6.5
48{{cvt>54.5|km|}}

Lines

{{Phase I, Hyderabad Metro}}

Since the first version of the plans, the three corridors mostly remained the same, but minor changes were introduced. These include the lack of stop at Lalaguda, or a stop at Lakdikapul instead of Secretariat. Also, the lines have been marked with several different combination of color.[44] Ameerpet- LB Nagar metro stretch opened on 24 September 2018.[45] HiTec City to Raidurg, 1.5-kilometre stretch on Corridor Three - Nagole to Raidurg, is scheduled to be completed in November 2019, as it involves construction of 49 pillars and the Raidurg terminal station.[46] Efforts are being made to complete the 8.5-km stretch from Ameerpet to HiTec City by December 2018.[47]

Red Line: Miyapur – L.B. Nagar

Route Length — {{cvt|29.21|km}}
Number of Stations (All elevated) — 27
Link to other Corridors
  • At Ameerpet – Connecting Corridors 1 and 3
  • At Mahatma Gandhi Bus Station – Connecting Corridors 1 and 2
# Station NameConnections
1MiyapurNone
2J.N.T.U College None
3K.P.H.B. ColonyNone
4KukatpallyNone
5BalanagarNone
6MoosapetNone
7BharatnagarNone
8ErragaddaNone
9ESI HospitalNone
10S.R NagarNone
11AmeerpetBlue Line
12PunjaguttaNone
13Erra ManzilNone
14KhairatabadNone
15Lakdi-ka-pulNone
16AssemblyNone
17NampallyNone
18Gandhi BhavanNone
19Osmania Medical CollegeNone
20MG Bus StationGreen Line
21MalakpetNone
22New MarketNone
23MusarambaghNone
24DilsukhnagarNone
25ChaitanyapuriNone
26Victoria MemorialNone
27L.B. NagarNone

Green Line: JBS – Falaknuma

Route Length — {{cvt|15|km}}
Number of Stations (All elevated) — 14
Link to other Corridors
  • At Parade Ground – Connecting Corridors 2 and 3
  • At Mahatma Gandhi Bus Station – Connecting Corridors 2 and 1
# Station Name Connections
1Parade GroundBlue Line
2Secunderabad WestNone
3Gandhi HospitalNone
4MusheerabadNone
5R.T.C. Cross RoadsNone
6ChikkadpallyNone
7NarayangudaNone
8Sultan BazaarNone
9M.G. Bus StationRed Line
10Salarjung MuseumNone
11CharminarNone
12ShalibandaNone
13ShamsherganjNone
14FalaknumaNone

Blue Line: Nagole - Raidurg

Route Length — {{cvt|27|km}}
Number of Stations (All elevated) — 23
Link to other Corridors
  • At Ameerpet – Connecting Corridors 3 and 1
  • At Parade Ground – Connecting Corridors 3 and 2
# Station Name Connections
1NagoleNone
2UppalNone
3StadiumNone
4NGRINone
5HabsigudaNone
6TarnakaNone
7MettugudaNone
8Secunderabad EastNone
9Parade GroundGreen Line
10ParadiseNone
11RasoolpuraNone
12Prakash NagarNone
13BegumpetNone
14AmeerpetRed Line
15Madhura NagarNone
16YousufgudaNone
17Jubilee Hills Road No. 5None
18Jubilee Hills CheckpostNone
19Peddamma TempleNone
20MadhapurNone
21Durgam CheruvuNone
22Hitec CityNone
23RaidurgNone

Depots

Phase 1

===Red Line Miyapur

===Blue Line Nagole

===Green Line Falaknuma

Reception

The Metro has opened to overwhelming response, with over 200,000 people using it on Day 1.[48] On the first Sunday of operations, the Metro was used by 240,000 people.[49] As of September 2018, the daily ridership was about 162,000.[50]

Trains are initially being operated at a frequency of 3.5 minutes in very peak hours and every 6.5 minutes in peak hours (between Miyapur-LB Nagar) and 6.5 minutes in peak hours (between Ameerpet-Nagole),[51] though maximum achievable frequency is every 90 seconds. Similarly, three-car trains are being used currently, though it is planned to use six-car trains in the future.[52]

In December 2017, Hyderabad Metro Rail launched its mobile app, TSavaari.[53][54] Hyderabad Metro timings are available on T-Savari app.[55] Ola Cabs and Uber tied up its services with app.[56]

Hyderabad Metro Rail crossed 30 million cumulative ridership milestone on 15 November 2018.[57]

Cost

The initial official estimated cost of the 72 km long Metro project stood at {{INRConvert|14132|c}}. The Central Government decided to bear 10% of it, while L&T was to bear the remaining 90% of the cost.[58][59] The construction work which was supposed to commence on 3 March 2011 commenced in 2012. In March 2012, the cost of the project was revised upwards to {{INRConvert|15957|c}}.[60] This has been further revised upwards to {{INRConvert|18800|c}} (as of November 2017).[61]

Infrastructure

The 71.3 km standard-gauge network will feature ballastless track throughout and will be electrified at 25 kV AC 50 Hz. An operations control centre and depot are constructed at Uppal. At some places, a flyover, underpass and metro has been constructed at the same place, as part of Strategic road development plan (SRDP).[62]

CBTC Technology

At the end of 2012, L&T Metro Rail awarded Thales a Rs 7.4bn ($US 134m) contract to provide CBTC and integrated telecommunications and supervision systems on all three lines. Thales will supply its SelTrac CBTC technology, and trains will initially run in automatic train operation mode with minimum headways of 90 seconds, although the system will support eventual migration to unattended train operation (UTO).[63]

Rolling stock

On 12 September 2012, Larsen and Toubro Metro Rail Hyderabad Ltd (LTMRHL) announced that it has awarded tender for supply of rolling stock to Hyundai Rotem.[64][65] The {{INRConvert|18|b}} tender is for 57 trains consisting of 171 cars which will be delivered in phases at least 9 months before the commencement of each stage.[66][67] On 2 October 2013, LTMRHL unveiled its train car for Hyderabad Metro. A model coach which is half the size of the actual coach, was on public display at Necklace Road on the banks of Hussain Sagar in the heart of Hyderabad.[68] The trains will be 3.2m wide and 4m high.[69] There will be 4 doors on each side of each coach.[69]

On 10 April 2014, the first metro train for HMR rolled out of Hyundai Rotem factory at Changwon in South Korea and reached Hyderabad in May 2014.[70] On 31 December 2014, Hyderabad Metro Rail successfully conducted a training run in Automatic Train Operation (ATO) mode for the first time between Nagole and Mettuguda.[71]

Ticketing

The L&T Hyderabad project will have an automated ticketing system with features such as contactless smart card based ticketing, slim automatic gates, payment by cash and credit/debit card, passenger operated ticket vending machine and provision of common ticketing system. It will also have a provision of NFC-based technology to enable usage of mobile phones as fare media and high performance machine to avoid long queues.[72]

Samsung Data Systems India, a subsidiary of South Korean firm Samsung, has been awarded the automatic fare collection system package for the L&T metro rail project. The package involves design, manufacture, supply, installation, testing and commissioning of the system.[72][73]

Official Ticket prices were announced on 25 November 2017. The base fare is {{INR}}10 for up to 2 km.

Slab Distance (km) Metro Fare ({{INR)
1 0 - 210
2 2 - 415
3 4 - 625
4 6 - 830
5 8 - 1035
6 10 - 1440
7 14 - 1845
8 18 - 2250
9 22 - 2655
10 > 2660

Stations

Hyderabad metro will have 64 stations in phase I. They will be provided with amenities such as escalators and elevators to reach the stations, announcement boards, electronic display systems among others for passengers. Commercial will also be provided on stations. Hyderabad metro stations will also have service roads underneath them to provide last mile connectivity by allowing other public transportation systems use it for dropping/picking passengers right in front of the stations and ensure uninterrupted traffic. Currently the service lane works are currently on at Nagole and Uppal stations.[74] The signboards of Hyderabad Metro are displayed in Telugu, English, Hindi and Urdu at metro stations.[75]

Otis Elevator Company of United States won the contract to supply and maintain 670 elevators.[76]

In May 2018, L&T Metro Rail announced that it had signed a contract with Powergrid Corporation of India to install electric vehicle charging facilities at all metro stations beginning with Miyapur and Dr. B R Ambedkar Balanagar stations.[77][78] L&THMRL has setup free wifi access units for commuters at Miyapur, Ameerpet and Nagole metro stations, in association with ACT Fibernet, as part of a pilot project.[79]

.[80]

See also

{{Portal|Railways in India}}
  • Hyderabad MMTS
  • Rapid transit in India
  • Secunderabad Railway Station
  • South Central Railway

References

1. ^{{cite web|url=https://www.thehindu.com/news/cities/Hyderabad/hmr-sets-another-record/article25052100.ece|title=Hyderabad metro footfalls}}
2. ^{{cite web|url=http://www.ltmetro.in/about-us/leadership/n-v-s-reddy/|title=N. V. S. REDDY}}
3. ^{{cite web|title=Hyderabad Metro rail flagged off today: See fares, timings, routes and other features|url=http://indianexpress.com/article/cities/hyderabad/hyderabad-metro-rail-to-be-flagged-off-by-pm-modi-today-see-timings-fares-routes-and-features-4958126|website=The Indian Express|accessdate=28 November 2017|language=en|date=28 November 2017}}
4. ^{{cite web|url=http://hyderabadmetrorail.in/html/project-discription.htm |accessdate=19 June 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20120611054305/http://www.hyderabadmetrorail.in/html/project-discription.htm |archivedate=11 June 2012 |title = Project Description }}
5. ^{{cite web|url=http://www.livemint.com/Politics/ylEObaYWxcC7lGO2E2e4wJ/The-rise-of-metro-rail-network-in-India.html|title=How metro rail networks are spreading across India}}
6. ^{{cite web |url=http://www.projectsmonitor.com/detailnews.asp?newsid=14944 |title=EPC vs PPP in metro rail |publisher=Projectsmonitor.com |date=2 December 2007 |accessdate=18 April 2013 |deadurl=yes |archiveurl=https://web.archive.org/web/20071202082910/http://www.projectsmonitor.com/detailnews.asp?newsid=14944 |archivedate=2 December 2007 |df=dmy-all }}
7. ^{{cite web|url=https://timesofindia.indiatimes.com/city/hyderabad/pm-modi-inaugurates-hyderabad-metro-rail/articleshow/61833627.cms|title=PM Modi inaugurates Hyderabad Metro Rail}}
8. ^{{cite web|url=http://www.express.com/article/india/pm-narendra-modi-flags-off-hyderabad-metro-4959534/|title=PM Narendra Modi flags off Hyderabad Metro}}
9. ^{{cite web|url=https://timesofindia.indiatimes.com/city/hyderabad/sr-nagar-mettuguda-was-missing-link-in-30-km-metro-rail-corridor/articleshow/61733237.cms|title=SR Nagar-Mettuguda was missing link in 30-km Metro rail corridor}}
10. ^{{cite web|url=http://timesofindia.indiatimes.com/city/hyderabad/metro-rail-to-get-lease-of-life-in-november/articleshow/60068066.cms|title=Metro Rail to get lease of life in November}}
11. ^{{cite web|url=https://timesofindia.indiatimes.com/city/hyderabad/tryst-with-metro-history-as-2nd-longest-corridor-opens/articleshow/65942656.cms|title=Tryst with Metro history as 2nd longest corridor opens}}
12. ^{{Cite news|url=https://www.deccanchronicle.com/nation/current-affairs/180818/hyderabad-metro-touches1-lakh-ridership.html|title=Hyderabad Metro touches1 lakh ridership|last=|first=|date=2018-08-18|work=Deccan Chronicle|access-date=2018-08-21|language=en-US}}
13. ^{{cite news| url=http://indiatoday.intoday.in/story/hyderabad-metro-project-delay-by-l-and-t-pushes-up-cost-by-over-30-per-cent/1/1097753.html | work=India Today | title=Hyderabad Metro project delay by L&T pushes up cost by over 30 per cent | date=26 November 2017}}
14. ^{{Cite news|url=https://www.deccanchronicle.com/nation/current-affairs/060518/ladies-only-coach-in-hyderabad-metro-rail.html|title=“Ladies only” coach in Hyderabad metro rail|date=2018-05-06|work=Deccan Chronicle|access-date=2018-06-10|language=en-US}}
15. ^{{cite news |author= |title= Advani flags off first MMTS train |url=http://www.thehindu.com/thehindu/2003/08/10/stories/2003081004290600.htm |newspaper=The Hindu |location=Hyderabad |date= 10 August 2003 |accessdate= 18 April 2015}}
16. ^{{cite news|url=http://www.thehindu.com/2003/10/27/stories/2003102707360600.htm|title=Nod for metro rail project|author=|date=27 October 2003|newspaper=The Hindu|accessdate=18 May 2015|location=Hyderabad}}
17. ^{{cite news|url=http://www.business-standard.com/article/economy-policy/rs-4-500-crore-mmts-project-report-under-way-104021601086_1.html|title=Rs 4,500-crore MMTS project report under way|author=|date=15 February 2004|newspaper=Business Standard|accessdate=18 May 2015|location=Hyderabad}}
18. ^{{cite news|url=http://www.thehindu.com/todays-paper/tp-national/tp-andhrapradesh/niz-is-hyderabad-metro-rails-mascot/article6403356.ece|title=Niz is Hyderabad Metro Rail's mascot|date=12 September 2014|work=The Hindu|accessdate=3 October 2016|language=en-IN}}
19. ^{{cite news|url=http://www.thehindubusinessline.com/industry-and-economy/economy/hyderabad-metro-gift-city-in-strategic-100-infra-projects/article4178523.ece|title=TheHindu.com Metro in best 100 global projects|publisher=www.thehindubusinessline.com}}
20. ^{{cite news|url=http://www.deccanchronicle.com/121209/news-current-affairs/article/metro-among-100-global-projects|title=DeccanChronicle.com metro-among-100-global-projects|archiveurl=https://web.archive.org/web/20121217221315/http://deccanchronicle.com/121209/news-current-affairs/article/metro-among-100-global-projects|archivedate=17 December 2012|deadurl=yes|publisher=metro-among-100-global-projects|df=dmy-all}}
21. ^{{cite web|url=http://www.thehindu.com/news/cities/Hyderabad/lt-metro-rail-hyd-bags-sap-award/article7968483.ece|title=L&T Metro Rail Hyd bags SAP award|date=10 December 2015|publisher=|via=www.thehindu.com|accessdate=29 November 2017}}
22. ^{{cite web|url=https://www.thehindu.com/news/cities/Hyderabad/metro-stations-get-green-platinum-award/article25394961.ece|title=Indian Green Building Council’s (IGBC) Green MRTS Platinum Award}}
23. ^{{Cite news|url=http://www.uniindia.com/hyderabad-metro-rail-gets-best-urban-mass-transit-project-award/south/news/1398327.html|title=Hyderabad Metro Rail gets 'Best Urban Mass Transit Project' award|last=|first=|date=5 November 2018|work=United News of India|access-date=11 January 2019}}
24. ^{{cite news|url=http://www.thehindubusinessline.com/companies/article3356327.ece|title=L&T performs Bhoomi Puja for Hyderabad metro|date=26 April 2012|work=The Hindu}}
25. ^{{cite news|url=http://www.thehindu.com/news/cities/Hyderabad/article3500043.ece|title=L&T metro rail schedule on track|date=7 June 2012|work=The Hindu|location=Chennai, India}}
26. ^{{cite web|url=http://www.deccanchronicle.com/channels/cities/hyderabad/metro-rail-works-picking-speed-601|title=Metro Rail works picking up speed|date=31 August 2011|publisher=The Deccan Chronicle|archiveurl=https://web.archive.org/web/20121012013835/http://www.deccanchronicle.com/channels/cities/hyderabad/metro-rail-works-picking-speed-601|archivedate=12 October 2012|deadurl=yes|accessdate=31 August 2011|df=dmy-all}}
27. ^{{cite web|url=https://timesofindia.indiatimes.com/city/hyderabad/monument-law-amendment-buoys-metro-dream-in-old-city-but-political-will-needed/articleshow/62376255.cms|title=Monument law amendment buoys Metro dream in Old City, but political will needed}}
28. ^{{cite web|url=http://www.ndtv.com/article/cities/hyderabad-metro-rail-phase-i-to-be-completed-by-2014-320266 |title=Hyderabad Metro Rail phase-I to be completed by 2014 |publisher=NDTV.com |date=21 January 2013 |accessdate=18 April 2013}}
29. ^{{cite web|author=Our Bureau |url=http://www.thehindubusinessline.com/industry-and-economy/logistics/hyderabad-metro-rail-stage-i-to-be-flagged-off-by-june-2014/article4133624.ece |title=Hyderabad Metro rail stage I to be flagged off by June 2014 - Business Line |publisher=Thehindubusinessline.com |date= |accessdate=18 April 2013}}
30. ^{{cite web|url=http://www.thehindubusinessline.com/industry-and-economy/logistics/lt-hyderabad-metro-begins-laying-of-rails/article5370871.ece|title=L&T Hyderabad Metro begins laying of rails|first=V. Rishi|last=Kumar|date=20 November 2013|publisher=|accessdate=29 November 2017}}
31. ^{{cite web|url=http://www.thehindubusinessline.com/companies/lt-hyderabad-metro-phase-i-to-be-ready-by-march-2015/article5325458.ece|title=L&T Hyderabad Metro phase I to be ready by March 2015|first=V.Rishi|last=Kumar|date=7 November 2013|publisher=|accessdate=29 November 2017}}
32. ^{{cite web|url=http://metrorailnews.info/news/cmrs-completes-1-day-inspection-for-hyderabad-metro-stage-ii-miyapur-to-s-r-nagar/|title=CMRS completes 1 day inspection for Hyderabad Metro Stage-II, Miyapur to S.R. Nagar|website=metrorailnews.info|deadurl=yes|archiveurl=https://web.archive.org/web/20160915164446/http://metrorailnews.info/news/cmrs-completes-1-day-inspection-for-hyderabad-metro-stage-ii-miyapur-to-s-r-nagar/|archivedate=15 September 2016|df=dmy-all}}
33. ^{{cite news| url=http://www.thehindu.com/news/cities/Hyderabad/mgbs-land-sought-for-metro-rail-interchange-station/article5654079.ece | location=Chennai, India | work=The Hindu | first=S. Sandeep | last=Kumar | title=MGBS land sought for Metro Rail interchange station | date=5 February 2014}}
34. ^{{cite news|url=https://telanganatoday.com/hyderabad-metro-rob-placed-at-oliphant-bridge|title=Hyderabad Metro ROB placed at Oliphant Bridge|website=telanganatoday.com}}
35. ^{{cite news|url=http://www.thehindu.com/news/cities/Hyderabad/metro-steel-bridge-crosses-oliphenta-railway-bridge/article19520150.ece|title=Metro steel bridge crosses Oliphenta railway bridge|website=thehindu.com}}
36. ^{{cite web|url=http://www.thehindubusinessline.com/economy/logistics/lt-hyderabad-metro-rail-gets-safety-approval/article9967217.ece|title=L&T Hyderabad Metro Rail gets safety approval}}
37. ^{{cite web|url=https://timesofindia.indiatimes.com/city/hyderabad/hyderabad-metro-chugs-on-ameerpet-lb-nagar-route/articleshow/65935513.cms|title=Hyderabad Metro chugs on Ameerpet-LB Nagar route}}
38. ^http://hmrl.telangana.gov.in/project-description.html
39. ^{{cite web|url=http://www.thehindu.com/news/cities/Hyderabad/metro-rail-line-to-raidurg-another-two-years-away/article21292572.ece|title=Metro rail line to Raidurg another two years away|website=The Hindu|accessdate=29 November 2017}}
40. ^{{cite web|url=http://www.newindianexpress.com/cities/hyderabad/2017/aug/09/state-to-seek-japanese-help-for-phase-ii-works-of-metro-rail-project-1640503.html|title=State to seek Japanese help for Phase II works of Metro Rail Project |date= 9 August 2017 |accessdate=9 August 2017}}
41. ^{{cite web|url=https://timesofindia.indiatimes.com/city/hyderabad/metro-corridors-to-crisscross-city-for-airport-link/articleshow/64549811.cms|title=Metro corridors to crisscross Hyderabad for airport link}}
42. ^{{cite web|url=https://timesofindia.indiatimes.com/city/hyderabad/spv-formed-to-extend-metro-from-raidurg-to-hyderabad-airport/articleshow/63459447.cms|title=SPV formed to extend Metro from Raidurg to Hyderabad airport}}
43. ^{{cite web|url=https://www.thehindu.com/news/cities/Hyderabad/metro-line-to-rgia-under-study/article22531377.ece|title=Metro line to RGIA under study}}
44. ^{{cite web |url=http://www.hyderabadmetrorail.com/images/Metro%20Route%20Map.jpg |title=Archived copy |accessdate=2013-08-18 |deadurl=yes |archiveurl=https://web.archive.org/web/20140111134701/http://hyderabadmetrorail.com/images/Metro%20Route%20Map.jpg |archivedate=11 January 2014 |df=dmy-all }}
45. ^{{cite web|url=https://www.ndtv.com/telangana-news/hyderabad-governor-esl-narasimhan-to-flag-off-new-ameerpet-lb-nagar-metro-line-on-september-24-1919196|title=Telangana Governor To Flag Off New Metro Line On September 24}}
46. ^{{cite web|url=https://www.thehindu.com/news/cities/Hyderabad/metro-may-go-the-extra-mile-soon/article25364363.ece|title=Metro may go the extra mile soon}}
47. ^{{cite web|url=https://timesofindia.indiatimes.com/city/hyderabad/wheres-my-metro-to-cyber-city-ask-techies/articleshow/61899062.cms|title=Where's my Metro to cyber city, ask techies}}
48. ^{{cite news |last= |first= |date= 30 October 2017 |title=Over 2 lakh passengers travel by Hyderabad metro rail on day 1 |url=http://indianexpress.com/article/india/over-2-lakh-passengers-travel-by-hyderabad-metro-rail-on-day-1-4961714/ |work=The Indian Express |location= |access-date=30 November 2017 }}
49. ^http://www.zeebiz.com/india/news-record-24-lakh-commuters-travel-by-hyderabad-metro-on-sunday-32847
50. ^{{Cite news|url=https://www.siasat.com/news/lb-nagar-ameerpet-metro-august-nvs-reddy-1367002/|title=LB Nagar- Ameerpet Metro in August: NVS Reddy|date=2018-06-09|work=Siasat Daily|access-date=2018-06-10|language=en-US}}
51. ^https://timesofindia.indiatimes.com/city/hyderabad/mania-peaks-2-1-lakh-riders-send-metro-in-tizzy/articleshow/61898886.cms
52. ^http://www.thehindu.com/news/cities/Hyderabad/full-metro-service-from-launch-day/article19652407.ece
53. ^{{cite web|url=http://www.thehindu.com/news/cities/Hyderabad/tsavaari-app-for-hyderabad-metro-rail-passengers/article20848220.ece|title=‘TSavaari’ app for Hyderabad metro rail passengers}}
54. ^{{cite web|url=https://deccanchronicle.com/technology/in-other-news/290918/hyderabad-metro-rail-app-update-includes-latest-timings.html|title=Hyderabad Metro Rail app update includes latest timings}}
55. ^{{cite web|url=https://www.deccanchronicle.com/nation/current-affairs/150118/hyderabad-metro-timings-available-on-t-savari-app-lt-website.html|title=Hyderabad Metro timings available on T-Savari app, L&T website}}
56. ^{{cite web|url=https://economictimes.indiatimes.com/small-biz/startups/newsbuzz/ola-integrates-services-with-hyderabad-metro-rails-tsavaari-app/articleshow/62051894.cms|title=Ola integrates services with Hyderabad Metro Rail's TSavaari app}}
57. ^{{cite news|url=https://m.timesofindia.com/city/hyderabad/hyderabad-metro-reaches-30-million-ridership/amp_articleshow/66649469.cms|title=Hyderabad Metro reaches 30-million ridership}}
58. ^{{cite web|url=http://www.ndtv.com/article/cities/hyderabad-metro-rail-project-will-be-completed-by-2017-andhra-pradesh-government-252808|title=Hyderabad Metro Rail Project will be completed by 2017: Andhra Pradesh government|date=8 August 2012|publisher=NDTV.com|accessdate=18 April 2013}}
59. ^{{cite web|url=http://ibnlive.in.com/generalnewsfeed/news/hyd-metro-rail-project-will-be-completed-on-schedule-ap-govt/1038418.html |title=Hyd Metro Rail Project will be completed on schedule: AP govt, IBN Live News |publisher=Ibnlive.in.com |date=8 August 2012 |accessdate=18 April 2013}}
60. ^{{cite news| url=http://articles.timesofindia.indiatimes.com/2012-03-08/hyderabad/31135640_1_hyderabad-metro-rail-project-hmrl-nagole-and-mettuguda | work=The Times Of India | title=Metro rail cost overshoots estimates | date=8 March 2012}}
61. ^{{cite news| url=http://indiatoday.intoday.in/story/hyderabad-metro-project-delay-by-l-and-t-pushes-up-cost-by-over-30-per-cent/1/1097753.html | work=India Today | title=Hyderabad Metro project delay by L&T pushes up cost by over 30 per cent | date=26 November 2017}}
62. ^{{cite web|url=https://www.deccanchronicle.com/nation/current-affairs/121018/hyderabad-women-safety-is-key-objective-for-metro.html|title=Hyderabad: Women safety is key objective for metro}}
63. ^{{cite web|url=http://www.thehindubusinessline.com/economy/logistics/lt-hyderabad-metro-awards-contracts-to-thales/article4101209.ece |title=L&T Hyderabad Metro awards contracts to Thales |publisher=thehindubusinessline.com |date=16 November 2012 |accessdate=28 November 2017}}
64. ^{{cite web|url=http://zeenews.india.com/business/realestate/latest-news/landt-metro-rail-grants-rs-1-800-cr-contract-to-hyundai-rotem_60097.html |title=L&T Metro Rail grants Rs 1,800 cr contract to Hyundai Rotem |publisher=Zeenews.india.com |date= |accessdate=18 April 2013}}
65. ^[https://web.archive.org/web/20120911213536/http://www.deccanchronicle.com/node/156378]
66. ^{{cite news|url=http://timesofindia.indiatimes.com/business/india-business/Hyundai-Rotem-cars-to-run-on-metro-tracks/articleshow/16358437.cms |title=Hyundai Rotem cars to run on metro tracks |date=12 September 2012 |accessdate=15 September 2012 |work=The Times Of India}}
67. ^{{cite web|url=http://ibnlive.in.com/news/lt-awards-rolling-stock-contract-to-hyundai-rotem/290716-60-121.html |title=L&T awards rolling stock contract to Hyundai Rotem |publisher=Ibnlive.in.com |date=14 September 2012 |accessdate=18 April 2013}}
68. ^{{cite web|url=http://newindianexpress.com/cities/hyderabad/Larsen-and-Tourbo-Hyderabad-Metro-unveils-train-car/2013/10/02/article1815113.ece|title=Larsen and Tourbo Hyderabad Metro unveils train car|publisher=|accessdate=29 November 2017}}
69. ^{{cite web |url=http://hmr.gov.in/tech.html |title=Archived copy |accessdate=2013-10-23 |deadurl=yes |archiveurl=https://web.archive.org/web/20130820055049/http://www.hmr.gov.in/tech.html |archivedate=20 August 2013 |df=dmy-all }}
70. ^{{cite web|title=First train for Hyderabad Metro rolls out of Korean factory |url=http://news.biharprabha.com/2014/04/first-train-for-hyderabad-metro-rolls-out-of-korean-factory/|work=IANS|publisher=news.biharprabha.com|accessdate=10 April 2014}}
71. ^{{cite web|url=http://www.thehindu.com/news/cities/Hyderabad/metro-rail-goes-on-first-automatic-trial-run/article6742659.ece|title=Metro rail goes on first automatic trial run|date=31 December 2014|publisher=|accessdate=29 November 2017|via=www.thehindu.com}}
72. ^{{cite web|author=Our Bureau |url=http://www.thehindubusinessline.com/industry-and-economy/logistics/samsung-bags-fare-collection-system-contract-for-hyderabad-metro/article4428680.ece |title=Samsung bags fare collection system contract for Hyderabad Metro | Business Line |publisher=Thehindubusinessline.com |date=18 February 2013 |accessdate=28 September 2013}}
73. ^{{cite web|last=Udgirkar |first=Trushna |url=http://www.mydigitalfc.com/news/hyderabad-metro-ticketing-deal-samsung-904 |title=Hyderabad Metro in ticketing deal with Samsung |publisher=mydigitalfc.com |date= |accessdate=28 September 2013}}
74. ^{{cite web|url=http://www.deccanchronicle.com/150522/nation-current-affairs/article/hyderabad-metro-get-service-lanes|title=Hyderabad Metro to get service lanes|date=22 May 2015|publisher=|accessdate=29 November 2017}}
75. ^{{cite web|url=http://www.news18.com/news/india/no-language-wars-here-hyderabad-metro-to-use-4-languages-1458925.html|title=No Language Wars Here, Hyderabad Metro to Use 4 Languages}}
76. ^{{cite web|url=http://www.thehindubusinessline.com/industry-and-economy/logistics/fare-structure-for-hyderabad-metro-notified/article1696928.ece|title=Fare structure for Hyderabad metro notified|first=Our|last=Bureau|date=14 April 2011|publisher=|accessdate=29 November 2017}}
77. ^{{cite web|title=Hyderabad Metro stations to have electric vehicle charging points|url=https://economictimes.indiatimes.com/industry/transportation/railways/hyderabad-metro-stations-to-have-electric-vehicle-charging-points/articleshow/64232001.cms|website=The Economic Times|accessdate=20 May 2018|date=19 May 2018}}
78. ^{{cite web|url=https://www.deccanchronicle.com/nation/current-affairs/251018/hyderabad-metro-stations-do-not-reflect-exact-locations.html|title=Hyderabad Metro stations do not reflect exact locations}}
79. ^{{cite web|url=https://www.deccanchronicle.com/nation/current-affairs/111018/watch-videos-with-free-wifi-at-hyderabad-metro.html|title=Watch videos with free Wi-Fi at Hyderabad metro}}
80. ^{{cite web|url=https://www.hydtraffic.com/hyderabad-metro-rail-celebrates-its-first-anniversary/|title=Hyderabad metro rail celebrates its first anniversary}}
  •   The Hindu Business Line, Hyderabad January 23, 2018

External links

{{commons category|Hyderabad Metro}}
  • Hyderabad Metro Rail Ltd
  • {{Twitter|hmrgov}}
{{Hyderabad Metro}}{{Rapid transit in India}}{{Keolis}}

5 : Keolis|Transport in Hyderabad, India|Rail transport in Telangana|Hyderabad Metro|Standard gauge railways in India

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/24 4:28:31