词条 | Isabella Dam |
释义 |
| name = Isabella Dam | image = | image_caption = Isabella Dam under construction | dam_crosses = Lower Kern River | res_name = Lake Isabella | res_capacity_total = {{convert|568000|acre feet|km3|abbr=on}} | res_catchment = {{convert|2074|mi2|km2|abbr=on}} | res_surface = {{convert|11000|acre|ha|abbr=on}} | location = Kern County, California | operator = U.S. Army Corps of Engineers, Sacramento District | dam_length = {{convert|1695|ft|m|abbr=on}} | dam_height = {{convert|185|ft|m|abbr=on}} | construction_began = 1948 | opening = 1953 | spillway_count = Ungated concrete overflow | spillway_capacity = {{convert|49000|cuft/s|m3/s|abbr=on}} | coordinates = {{coord|35|38|46|N|118|28|56|W|type:landmark|display=inline,title}} | plant_capacity = 12 MW | plant_annual_gen =22,610,000 KWh (2001–2012)[1] }} Isabella Dam is an embankment dam located in the Kern River Valley, about halfway down the Kern River course, between the towns of Kernville and Lake Isabella in Kern County, California. Isabella Dam serves agricultural, hydroelectric, and flood control uses.[2] Lake Isabella (reservoir created by dam) also serves as a recreational and tourist attraction. Water sports, fishing, boating, camping, and hiking are common throughout the area, as well as the Sequoia National Forest. BackgroundThe town of Isabella was founded in 1893, during the 1893 Columbian Expedition, by Steven Barton in honor of Queen Isabella of Spain. In 1948, Congress appropriated funds to build a dam to prevent flooding of Bakersfield. The city had been flooded in 1867 and 1893. In 1950, while the dam was under construction, they experienced flooding measuring {{convert|30000|cuft|m3}} of water per second.[3] The dam was completed in March 1953.[2][3] The U.S. Corps of Engineers built earthen dams across two forks of the Kern River to create the Isabella reservoir, Kern County's largest body of water year round with a surface area of 11,200 acres. During the construction of the dam and reservoir the towns of Lake Isabella and Kernville both had to be moved to higher ground. Most of the original town of Kernville had been razed in 1948, in preparation for the construction of the dam. Below Isabella Dam, the Kern River flows southwest through approximately 30 miles of a canyon, locally known as the Kern Canyon, with many steep cliffs and turns along the southern edge of the Greenhorn Mountains, roughly 15 miles east of Bakersfield. Once it reaches Bakersfield, the river loses most of its remaining flow; much of it is diverted and channelized before reaching the city center. Bakersfield and about 350,000 acres of farm land and oil fields in the Kern River region are protected by the project. As a partner to dams on the Kings, Kaweah and Tule Rivers, the Isabella dam helps curb flood losses to cropland in the Tulare Lake Basin as well. Construction and operationBakersfield sustained extensive damage by being seventeen feet below the flood crest of the 1937 flood of the San Joaquin River Basin.[4] During 1943, some $10 million ($137 million today) worth of flood damage was done to agriculture alone in the Tulare Lake Basin; the Kern River contributed almost half of the flow that caused the damage. The Sacramento District, under the direction of the district engineer, Lt. Col. Chambers, and by the authority of the 1936 Act, conducted a study of the area in 1937. Their study, completed in 1940, disclosed that roughly $750,000 (over $12 million today) in flood control benefits would be realized with the completion of regulatory works on the Kern River. Their study also showed that an average benefit to irrigation and existing power facilities of $185,000 ($2.5 million today) could be gained as well.[5] After the District filed its report, Congress authorized the Isabella Project in the 1944 Flood Control Act. Construction began in 1948, under contract with Rand Construction Company, and completed in 1953; the federal government spent $22 million ($305 million today) for the project. Isabella Dam consists of two dams, a "main dam", and an "auxiliary dam". The main dam is of earthen build, {{convert|1695|ft|m}} long and {{convert|98|ft|m}} tall, and owned and maintained by the U.S. Army Corps of Engineers.[2] The main reservoir, Lake Isabella, can hold up 570,000 acre feet of water. Normal release from the main dam is 3,000 cubic feet per second (80 m³/s),[3] maximum historical releases were 7,200 ft³/s (200 m³/s) in 1983.[6] The reservoir that Isabella Dam creates is called Lake Isabella. Water from Lake Isabella can be used in any of three ways. It is released into the Lower Kern River from the main dam, through the hydroelectric project in the main dam, or through the hydroelectric project in the auxiliary dam. The design capacity of the release channel (the Lower Kern River) is over 8,000 ft³/s (230 m³/s). If Lake Isabella is above {{convert|110000|acre.ft}}, the water can also be diverted into the Borel project at the main dam.[11] Borel Hydroelectric ProjectHydroelectric development on the Kern River in central California began in 1894 when the Power, Transit and Light Company started construction of a small plant at the mouth of Kern Canyon. The following year, the Kern River and Los Angeles Electric Power Company obtained water rights on the river and planned construction of a power plant. This project, Borel Hydroelectric Project, was built to provide power for the growing Red Electric Streetcar (also known as Red Car) transportation system in Los Angeles.[7] Because construction of Isabella Dam would bisect the Borel canal, the Corps entered into an agreement with SCE such that the dam would be built in a manner to "afford operation conditions at least equal to that existing in the Borel Canal under pre-project [pre-Isabella Dam] conditions." That 1950 Contract for Relocation, Rearrangement, and Alteration of Borel Facilities requires that the Corps make available to the Borel project the full flow of the Kern River and all releases from storage in Isabella Reservoir. In addition, the Corps must operate and maintain Isabella Dam and reservoir in a manner that will not interfere with or otherwise reduce the efficiency or capacity of the operation of the Borel project. The auxiliary dam is part of the Borel Hydroelectric Project. The canal for the Borel project diverts water from {{convert|5.5|mi|km}} upstream of Isabella Dam.[8] Lake Isabella Dam Restoration ProjectWith more than 300,000 people living and working below the dams, primarily in the town of Lake Isabella and the city of Bakersfield, the U.S. Army Corps of Engineers (USACE) began a dam safety modification study (DSMS) in 2006 to address seismic, hydrologic (potential overtopping during an extreme flood event) and seepage issues at the dams. On April 28, 2006, a seepage problem was found in the Isabella Auxiliary Dam. Officials determined that it would be necessary to restrict the maximum reservoir elevation to {{convert|20|ft|m}} below the spillway, or normal "full" pool. The dam's releases through the outlet were increased, allowing the water to flow at 4,500 ft³/s (130 m³/s).[6] In May 2006, due to more than average rainfall and snowpack in the mountains,[9] and warmer than average temperatures in the area, the Upper Kern River was filling Lake Isabella faster than officials could lower it. The Lower Kern River was also running higher than normal, and flowing at up to {{convert|20|mph|km/h}} in some parts. State Route 178, which travels through the canyon between Bakersfield and Lake Isabella, became unstable, and one lane was closed due to the high water levels.[10] Some flooding was reported by property owners along the river. Emergency management officials warned that if Isabella Dam were to fail when the reservoir was full, a large part of Bakersfield would be inundated within 2 to 4 hours. After the news of the seepage, the dam came under further attention due to being situated on a fault line. The fault line was thought to be inactive, but in February 2007, a study by the U.S. Army Corps of Engineers found evidence of at least one earthquake in the last 5,000 years, and therefore judged the fault line as active. With the new information about the fault line, the study said the dam was not likely to be in danger.[11] On November 9, 2007, the Corps of Engineers released the Isabella Dam Consensus Report, that confirmed the high-risk classification of the dam, ranking Isabella Dam among the 6 highest risk and highest priority dams in America,[12] and later elevated it to the highest priority. On March 12, 2008, local officials brought in a team of emergency response experts, and began work on an evacuation plan in case Isabella Dam were to fail.[13] The Corps released a Final Environmental Impact Statement (FEIS) on March 23, 2012, reporting their plans for the future of the dam. The plans included structural improvements in order to reduce the risk to the public and property from floods, earthquakes, and seepage. Part of the plan included raising both dams approximately {{conv|16|ft}}, a new {{conv|900|ft}} emergency spillway, and moving State Route 155 and State Route 178 above the new crest line. Changes made to the original plan also reduced impacts on recreation, biological resources, and water quality. The planners consulted with the Fish and Wildlife Service to ensure negligible impacts on fish and wildlife or environmental loss. Existing downstream water would also be maintained in cooperation with power generators and irrigators, as is required in the initial relocation agreement in 1950.[14] In January 2014, the Corps had an "Agency Technical Review" for the first 35 percent of the planning of the project. The Corps began testing water flow of a model of the project that was built and was studied at Utah State University. John Prettyman of the USACE in Sacramento said the model is approximately one-third the size of a football field. In 2013, following the signing of the Record of Decision in December 2012, the Corps entered the Pre-Construction Engineering and Design phase of the project. A number of procedural tasks must still be completed in preparation of physical construction, which is scheduled to begin in 2017.[15] The project will not increase the current storage level or capacity of the dam. The Corps explained that would require an additional study and authorization. However, during the construction, the water level will be intentionally lowered, if need be. The Corps added that it will take measures to decrease effects to recreation. An operating restriction is currently in place, limiting the lake's normal storage capacity, to reduce the risk of the seepage and seismic concerns while a permanent solution is investigated. USACE has implemented increased surveillance and monitoring; stockpiling of emergency materials; warning sirens in the town of Lake Isabella; installation of additional instrumentation for monitoring; and continued public outreach with Kern County and the local public.[16] In September 2017, The Corp awarded a $204 million contract to Flatiron/Dragados/Sukut Joint Venture of Benicia to construct modifications to the Isabella Lake Dam in Lake Isabella. The contract includes addressing the identified overtopping, seismic, and seepage concerns. Construction at the main dam will include excavation of a new emergency spillway, modifications to the existing service spillway, a 16-foot raise of the main dam, modifications to California State Route 155 at the main dam's right abutment, and modifications at several recreation facilities north of the auxiliary dam. Construction is expected to begin in early 2018 and is expected to be complete in 2022.[17] RecreationThe area hosts over 30 designated campgrounds surrounding the reservoir, many within the Sequoia National Forest. The National Forest contains over 2,500 miles (4,000 km) of road and 850 miles (1,370 km) of trails, and hosts a number of camping and recreational facilities. The forest is adjacent to Sequoia and Kings Canyon National Parks. Sport fishing is available year-round in the reservoir. The reservoir is stocked with trout, bass, bluegill, crappie, and catfish. Water sports allowed on the lake also include boating, sailing, jet skiing, water skiing, and wind surfing. Boating and fishing permits are available at any marina and at several convenience stores in the Lake Isabella area. Whitewater rafting, kayaking, and fishing are also permitted along the Kern River.[18] See also{{stack|{{Portal|California|Water|Renewable energy}}}}
References1. ^{{cite web|url=http://www.energy.ca.gov/almanac/renewables_data/hydro/index.php|title=California Hydroelectric Statistics & Data|publisher=California Energy Commission|date=|accessdate=2018-04-26}} {{commons category}}2. ^1 2 Lakes Online – Lake Isabella Dam Information 3. ^1 2 Maturango Museum – Some History of the Indian Wells Valley and surrounding areas in Kern, Inyo, and Mono Counties 4. ^{{Cite web|url=http://pubs.usgs.gov/wsp/0843/report.pdf|title=FLOODS OF DECEMBER 1937 IN NORTHERN CALIFORNIA|last=Ickes|first=Harold|date=1939|website=USGS|publisher=US Department of the Interior|access-date=}} 5. ^{{Cite journal|last=Collins|first=Willie|date=2006|title=Sacramento District History: 1929–2004|url=http://www.spk.usace.army.mil/Library.aspx|journal=US Army Corps of Engineers: Sacramento District|doi=|pmid=|access-date=}} {{PD-notice}} 6. ^1 Kern Valley Sun, Perspective: Lower Kern River not yet as high as in 1983, May 10, 2006 7. ^{{Cite web|url=http://wikimapia.org/6293074/Borel-Powerhouse|title=Borel Power House|last=|first=|date=|website=Wikimapia|publisher=|access-date=}} 8. ^1 USGS, 1996 California Hydrologic Data Report, Borel Canal, 1996 {{webarchive |url=https://web.archive.org/web/20080917071522/http://ca.water.usgs.gov/archive/waterdata/96/11187500.html |date=September 17, 2008 }} 9. ^KERO-TV, Kern River Especially Dangerous This Year, May 17, 2006 10. ^Kern Valley Sun, Canyon road along river cracks, May 17, 2006 11. ^KERO 23, Fault Beneath Isabella Dam Active, February 28, 2007 12. ^U.S. Army Corps of Engineers, Corps of Engineers Releases External Review Report on Isabella Dam, Release No. PA-07-14, November 9, 2007 13. ^KBAK-TV, Work starts on evacuation plans in case of Isabella Dam failure, March 12, 2008 14. ^{{Cite web|url=http://www.spk.usace.army.mil/Portals/12/documents/usace_project_public_notices/Isabella%20Lake%20Dam%20Safety%20Modification%20Project%20Final%20EIS.pdf |title=Isabella Lake Dam Safety Modification Project Final EIS |last= U.S. Army Corps of Engineers |first= |date= 2012-03-23|website= |language=en-us |access-date=2019-02-19}} 15. ^{{Cite web|url=http://www.spk.usace.army.mil/Missions/CivilWorks/IsabellaDam.aspx|title=Isabella Lake Dam Safety Modification Project|last=|first=|date=April 11, 2016|website=US Army Corps of Engineers|publisher=|access-date=}} 16. ^{{Cite web|url=http://www.ridgecrestca.com/article/20140108/news/140109835|title=Lake Isabella Dam restoration project moves forward|last=Bodine|first=Mike|date=January 8, 2014|website=The Daily Independent|publisher=|access-date=}} 17. ^{{Cite web|url=http://www.spk.usace.army.mil/Media/News-Releases/Article/1320249/corps-awards-204-million-contract-to-begin-construction-on-isabella-dam-modific/|title=Corps awards $204 million contract to begin construction on Isabella Dam modifications}} 18. ^{{Cite web|url=http://www.co.kern.ca.us/parks/isabella.asp|title=Lake Isabella Recreation|last=|first=|date=|website=County of Kern: Parks and Recreation|publisher=|access-date=}} External links
10 : Dams in California|Dams in the Tulare Basin|Hydroelectric power plants in California|Kern River Valley|Buildings and structures in Kern County, California|Earth-filled dams|United States Army Corps of Engineers dams|Dams completed in 1953|Energy infrastructure completed in 1953|1953 establishments in California |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。