请输入您要查询的百科知识:

 

词条 Cushman Dam No. 1
释义

  1. See also

  2. References

{{Infobox NRHP
| name =Cushman No. 1 Hydroelectric Power Plant
| nrhp_type = hd | nocat = yes
| image = Cushman Dam No. 1.jpg
| caption =
| location = Mason County, Washington, USA
| nearest_city = Hoodsport, Washington
| coordinates = {{coord|47.423063|-123.222377|region:US-WA_type:landmark|format=dms|display=inline,title}}
| locmapin = Washington
| area = {{convert|28|acre}}[1]
| built = 1924
| architect = Tacoma Light Dept.
| architecture = Other
| added = December 15, 1988
| governing_body = Local
| mpsub = Hydroelectric Power Plants in Washington State, 1890--1938 MPS
| refnum = 88002759[2]
}}Cushman Dam No. 1 is a hydroelectric dam on the North Fork of the Skokomish River in Mason County, Washington, which impounded and enlarged the formerly natural Lake Cushman. It was built by Tacoma City Light (now Tacoma Power) in 1924-1926. Tacoma's demand for electricity grew rapidly after World War I. Tacoma City Light's Nisqually River Hydroelectric Project, built in 1912, could not meet the demand and the utility decided to build a new hydroelectric project on the North Fork Skokomish River. The dam and powerhouse first began to deliver electricity on February 12, 1926.[3]

It has a concrete arch design and includes 90,000 cubic yards (69,000 m³) of concrete, covering a whole 6,244 feet (1903 m) of water. Two 21,600 kilowatt generators provide 127 million kilowatt-hours annually to the Tacoma Power system.

Construction began on July 7, 1924, under the commissioner Ira S. Davidsson (1918–1940). It has a top width of eight feet (2.4 m) and a base width of 50 feet (15 m), at 275 feet (84 m) high and 1,111 feet (339 m) long. The transmission of electricity to Tacoma, over lines crossing Tacoma Narrows, was activated, or "formally energized", on March 23, 1926, with the push of a button by President Calvin Coolidge in a ceremony at the White House.[4]

A second, smaller dam, Cushman Dam No. 2, 3.2 kilometers (2 miles) downstream of Dam No. 1, was completed by December 1930.

See also

{{stack|{{Portal|Washington|Water|Renewable energy}}}}
  • Cushman Dam No. 2
  • National Register of Historic Places listings in Mason County, Washington

References

1. ^{{Citation | last1 = Soderberg | first1 = Lisa | date = October 23, 1986 | title = National Register of Historic Places Registration Form: Cushman No. 1 Hydroelectric Power Plant | url = {{NRHP url|id=88002759}} | format = PDF | accessdate = February 19, 2015 }}.
2. ^{{NRISref|2008a}}
3. ^{{cite web |title= Tacoma City Light's Cushman Dam No. 1 on the Skokomish River delivers electricity on March 23, 1926. |publisher= HistoryLink.org |url=http://www.historylink.org/index.cfm?DisplayPage=output.cfm&file_id=5085 |accessdate=2009-07-14}}
4. ^{{cite web | title= Cushman Hydroelectric Project Timeline |publisher= Tacoma Power |url= http://www.mytpu.org/files/library/cushman-timeline-1.pdf |accessdate=2009-07-14}}
{{National Register of Historic Places}}{{Clear}}{{Washington-NRHP-stub}}

9 : Dams in Washington (state)|Hydroelectric power plants in Washington (state)|Dams completed in 1926|Buildings and structures in Mason County, Washington|Dams on the National Register of Historic Places in Washington (state)|National Register of Historic Places in Mason County, Washington|Energy infrastructure completed in 1926|United States power company dams|Historic districts on the National Register of Historic Places in Washington (state)

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/14 0:49:57