请输入您要查询的百科知识:

 

词条 Line 6 Finch West
释义

  1. History

  2. Route layout

      Stops  

  3. Potential extensions

     Finch West station to Finch station  Humber College to Pearson Airport  Finch station to Don Mills station 

  4. Operations

  5. Carhouse and maintenance facility

  6. See also

  7. References

  8. External links

{{Use mdy dates|date=May 2018}}{{Infobox rail line
|name = Line 6 Finch West
|logo = {{rint|toronto|6|size=35}}
|color = Grey
|type = Light rail
|system = Toronto subway
|status = Planned
|locale = Toronto, Ontario
|start = {{ttcs|Finch West}}
Humber College
|stations = 18
|routes =
|daily_ridership =
|open =
|planopen = 2023
|close =
|owner = Metrolinx
|operator = Toronto Transit Commission
|character =
|depot = TBD (preferred site at York Gate Blvd and Norfinch Dr site)[1]
|stock = Alstom Citadis Spirit[2]
|linelength = {{convert|11|km|mi|abbr=on}}[3]
|tracklength =
|tracks =
|gauge = {{Track gauge|sg|allk=on}}
|electrification = 750 V DC overhead
|speed = {{convert|80|km/h|abbr=on}}
|elevation =
|map = {{Finch West LRT}}
}}Line 6 Finch West, also known as the Finch West LRT,[3] is a planned light rail line in Toronto, Ontario, Canada, to be operated by the Toronto Transit Commission. It was part of the Transit City proposal announced on March 16, 2007. The {{convert|11|km|adj=on}}, 18-stop line is to extend from Finch West station on Line 1 Yonge–University to the North Campus of Humber College. The line is forecast to carry about 14.6{{nbsp}}million rides a year or 40,000 a day by 2031. It is scheduled for completion in 2023, with an estimated cost of $1.2 billion.[3][4][5]

History

In March 2007, Toronto Mayor David Miller announced the {{convert|17|km|adj=on}} Etobicoke–Finch West LRT as part of the Transit City plan, for the construction of several light-rail lines within the city.[9][10] The western terminus of the line would be built in the Highway 27/Humber College area in Etobicoke. The line would run along Finch Avenue West eastward, terminating at Finch station in North York.[9]

On April 1, 2009, the Ontario government announced that it would provide funding for construction of this line from Humber College to Don Mills station via Finch West and Finch stations, opening in 2013.[6][7]

In March 2010, the Ontario government budgeted less for building transit. As a result, it eliminated the proposed section of line east of Finch West station.[9]

In December 2010, Mayor Rob Ford cancelled the line after taking office.[8] However, in February 2012, city council voted to restore the project as part of a new transit plan, restoring some of the elements of the Transit City proposal over Mayor Ford's objections.[9]

In April 2012, Metrolinx proposed to start construction on the Finch West LRT in 2015, with the line opening in 2018.[9] By November 2012, when the city and province signed an LRT master agreement, construction for the line was to begin in 2015 for completion in 2020.[3]

In April 2015, the province announced that construction of the line would start in 2016 for completion in 2021.[3] In September 2015, the Government of Ontario announced that its agency Infrastructure Ontario would search for a contractor to design, build, finance and maintain the Finch West LRT. The successful contractor would be chosen by 2017. The Request for Proposal (RFP) was released to select companies in February 2016[20] and closed on December 20, 2017.[10]

In 2017, Enbridge Gas Distribution began relocating natural gas mains along the LRT route as part of preparatory work for construction. Enbridge relocated natural gas pipelines lower within the roadway to allow for an appropriate depth beneath the proposed track-bed.[11]

In May 2017, Metrolinx confirmed that it had entered into an agreement with Alstom to build 17 light rail vehicles for Line 6 Finch West.[20] In September 2017, Metrolinx announced the line would not open until 2022 at the earliest, blaming the delay on uncertainty with the Bombardier vehicle supply.[12]

In April 2018, Mosaic Transit Group, a consortium of ACS Infrastructure Canada Inc., Aecon, and CRH Canada Group Inc., was selected to build the transit line.[13][14] After consultation with Mosaic on a construction schedule, Metrolinx delayed projected completion of the line to 2023, ten years after the originally announced date.[5] That May, Infrastructure Ontario and Metrolinx announced that Mosaic had signed a contract to design, build, and finance the construction of the line and stations, and to maintain them for 30 years.[15]

Route layout

The eastern terminus of the line is to be built at Finch West station on Line 1 Yonge–University in North York. After a short tunnel at Finch West station, the line will run on the surface along Finch Avenue West until it reaches its western terminus at Humber College's North Campus. The line will be {{convert|11|km|abbr=on}} long.[3]

Stops

The TTC has indicated that stops will be spaced on average {{convert|650|m|abbr=on}} apart. The following is the list of stops proposed as of 2018.[30]

StopNotes
Humber CollegeTo be located underground
Westmore
Martin Grove
Albion
Stevenson
Mount Oliveoriginal proposed name: Kipling
Rowntree Millsoriginal proposed name: Islington
Pearldale
Duncanwoods
Milvan Rumike
Emeryoriginal proposed name: Weston
Signet Arrow
Norfinch OakdaleSite of proposed maintenance facility[1]
Jane and Finchoriginal proposed name: Jane
Driftwood
Tobermory
Sentinel
Finch West}}Connection to Line 1 Yonge–University; to be located underground

In January 2018, to avoid naming conflict with existing stations in Toronto, a consultation process was initiated to select unique names for the stops at Jane, Kipling, Islington and Weston; the initial suggestions were Jane and Finch, Mount Olive, Thistletown, and Emery Village, respectively.[16] Based on feedback, Rowntree Mills is also being considered for the stop at Islington, while Emery would be the name for the stop at Weston.[16]

Potential extensions

Finch West station to Finch station

{{Finch Central LRT}}

In March 2010, the Ontario government eliminated the proposed section of line between Finch West station and Finch station because of budget constraints. This section of the line was part of the original Transit City proposal.[9]

In 2013, this plan was revived as an "Unfunded Future Rapid Transit Project" in the City of Toronto's "Feeling Congested?" report, meaning this extension may be constructed sometime in the future.[35] The extension was later shown in the TTC's 2018 Corporate Plan with no timeline for completion.[17]

Humber College to Pearson Airport

In 2009, the TTC was studying the feasibility of potential routings for a future westward extension of the Etobicoke–Finch West LRT to the vicinity of Woodbine Live development and Pearson International Airport.[10][38] This extension was later reclassified as a future transit project, as described in the 2013 "Feeling Congested?" report by the City of Toronto.[18]

Finch station to Don Mills station

In May 2009, Metrolinx proposed that the line be extended from Finch station, along Finch Avenue East and Don Mills Road into Don Mills station to connect with the Sheppard East LRT and create a seamless crosstown LRT in northern Toronto to parallel Line 5 Eglinton in central Toronto. The TTC said that a planning study would have commenced in 2010.[10][41][42]

Operations

  • The route of Line 6 Finch West is now served by the 36 Finch West bus, one of the three busiest bus routes in Toronto with about 42,600 passengers per weekday. If buses continue to serve the route, then by 2031, forecasted demand would require 32–39 articulated buses or 45–55 standard buses.[43]
  • Line 6 would replace 35 morning and 29 afternoon peak period buses from existing traffic lanes.[43]
  • The full capacity of a full standard bus is 48 passengers and of a single LRT car is 163 passengers. Line 6 will be able to support two-car trains.[43]
  • Line 6 would carry about 42,600 passengers per weekday. By 2031, projected ridership would be 2,800 passengers per hour in the peak direction.[43]
  • The LRT will provide service 20% faster than buses in mixed traffic today.[43]
  • Each LRT vehicle will use the Presto proof-of-payment system.[43]
  • Metrolinx requires 17 Alstom Citadis Spirit LRVs to operate the line.[19]
  • Annual operating and maintenance costs are estimated to be $51.5{{nbsp}}million in 2022, before deducting fare revenue and costs saved by eliminating parallel bus service.[20]

Carhouse and maintenance facility

Metrolinx plans for a maintenance and storage facility (MSF) for the route's cars on an empty lot north of Finch Avenue West between York Gate Boulevard and Norfinch Drive, next to the former Regina Pacis Catholic Secondary School (now Monsignor Fraser College's Norfinch Campus).[21] The MSF will serve up to 75 vehicles for Line 6 Finch West, as well as allow for serving the rolling stock of a future Jane LRT line.[52]

See also

{{portal|Toronto Transit Commission|Toronto|Trams}}
  • Light rail in Canada

References

1. ^{{cite web|url=http://www.metrolinx.com/en/docs/pdf/finch_west_ea/appendix_m_part_2.pdf|title=Transit Project Assessment, Environmental Project Report|publisher=Metrolinx}}
2. ^{{cite web |title=Metrolinx to buy vehicles from Bombardier competitor as backup plan for Eglinton Crosstown |url=http://www.cbc.ca/news/canada/toronto/metrolinx-alstom-bombardier-1.4111844 |website=CBC News |accessdate=2018-02-09}}
3. ^{{Cite web |url=http://www.metrolinx.com/en/greaterregion/projects/finchwest-lrt.aspx |title=Finch West LRT |website=www.metrolinx.com|access-date=2018-11-25}}
4. ^Metrolinx Board Report April 25, 2012
5. ^{{Cite news |url=https://www.thestar.com/news/gta/transportation/2018/04/19/finch-lrt-delayed-another-year.html |title=Finch LRT delayed another year |work=Toronto Star |access-date=2018-04-20}}
6. ^{{cite web |url=https://www.thestar.com/news/gta/article/612297 |title=GTA transit gets $9B jump-start |work=Toronto Star}}
7. ^{{cite press release |title=Province Moving Transit Projects Forward |url=http://news.ontario.ca/mto/en/2009/04/province-moving-transit-projects-forward.html |publisher=Ontario Ministry of Transportation |date=2009-04-01 |accessdate=2009-11-08}}
8. ^{{cite magazine |url=http://www.torontolife.com/daily/informer/streetcar-named-disaster/2010/12/01/mayor-rob-ford-%E2%80%9Ctransit-city-is-over%E2%80%9D/ |title=Mayor Rob Ford: "Transit City is over"|archive-url=https://web.archive.org/web/20101206172443/http://www.torontolife.com/daily/informer/streetcar-named-disaster/2010/12/01/mayor-rob-ford-%E2%80%9Ctransit-city-is-over%E2%80%9D|archive-date=2010-12-06 |magazine=Toronto Life |date=December 1, 2010|access-date=2017-04-24}}
9. ^[https://www.theglobeandmail.com/news/national/toronto/council-opts-for-light-rail-lines-over-fords-lone-subway-track/article2331862/ Council opts for light-rail lines over Ford's lone subway track], The Globe and Mail February 8, 2012
10. ^{{cite news |url=https://canada.constructconnect.com/dcn/news/projects/2017/12/rfp-closed-finch-west-rapid-transit-line |title=RFP closed for Finch West rapid transit line |date=2017-12-20 |accessdate=2017-12-31 |publisher=Daily Commercial News |website=constructconnect.com}}
11. ^Metrolinx.com, "Finch West LRT Construction Updates", accessed 2917-06-21
12. ^{{Cite news |url=https://www.thestar.com/news/gta/transportation/2017/09/19/metrolinx-blames-bombardier-for-latest-finch-west-lrt-delay.html |title=Metrolinx blames Bombardier for latest Finch West LRT delay |last=Spurr |first=Ben |date=2017-09-19 |work=The Toronto Star|access-date=2017-09-20 |issn=0319-0781}}
13. ^{{Cite web |url=http://www.aecon.com/Media_Room/~1424-Aecon-consortium-selected-as-preferred-proponent-for-the-Finch-West-Light-Rail-Transit-project-in-Toronto |title=Aecon consortium selected as preferred proponent for the Finch West Light Rail Transit project in Toronto |publisher=AECON |website=aecon.com |access-date=2018-04-20}}
14. ^{{cite web|url=http://www.mosaictransit.com/index.html|title=Welcome to Mosaic Transit Group|website=Mosaic Transit Group|publisher=Mosaic Transit Group|accessdate=2019-01-20}}
15. ^{{cite web |url=http://www.infrastructureontario.ca/Financial-Close-Finch-West-Light-Rail-Transit/ |title=Contract Awarded for Finch West Light Rail Transit Project |publisher=Infrastructure Ontariodate=2018-05-07 |accessdate=2018-05-07}}
16. ^{{cite web |title=Stop Naming Finch West LRT |url=https://www.metrolinxengage.com/en/engagement-initiatives/stop-naming-finch-west-lrt |website=Metrolinx Engage |publisher=Metrolinx |accessdate=2018-03-30 |archive-url=https://web.archive.org/web/20180330183013/https://www.metrolinxengage.com/en/engagement-initiatives/stop-naming-finch-west-lrt |dead-url=no |archive-date=2018-03-30}}
17. ^{{cite web |title=Corporate Plan 2018–2022 |url=https://www.ttc.ca/Coupler/PDFs/1_Corporate_Plan_2018-2022.pdf#page=42 |website=TTC.ca |accessdate=2018-02-09}}
18. ^http://www.toronto.ca/legdocs/mmis/2013/pg/bgrd/backgroundfile-64550.pdf
19. ^{{cite news |url=https://www.thestar.com/news/gta/2016/07/20/metrolinx-threatens-legal-action-over-late-delivery-of-light-rail-vehicles.html |title=Metrolinx threatens legal action over late delivery of light rail vehicles |newspaper=Toronto Star |first=Ben |last=Spurr |date=2016-07-20 |accessdate=2016-07-20}}
20. ^{{cite news |url=https://www.thestar.com/news/gta/2016/10/31/report-outlines-steep-costs-of-running-new-toronto-transit-lines.html |title=Report outlines steep costs of running new Toronto transit lines |newspaper=Toronto Star |first1=Ben |last1=Spurr |first2=Jennifer |last2=Pagliaro |date=2016-10-31 |accessdate=2016-10-31}}
21. ^Finch West Expansion Projects - Metrolinx
22. ^{{cite news |url=https://www.thestar.com/news/gta/2015/04/27/finch-lrt-to-be-complete-in-2022-before-sheppard-breaks-ground.html |title=Finch LRT to be complete in 2021, before Sheppard breaks ground |work=Toronto Star |first=Tess |last=Kalinowski |date=2015-04-27 |accessdate=2015-04-27}}
23. ^{{cite news |url=http://transit.toronto.on.ca/archives/weblog/2015/04/28-ontario_pr.shtml |title=Ontario Proceeding with Finch West LRT |work=Transit Toronto |first=Robert |last=Mackenzie |date=2015-04-28 |accessdate=2015-04-28}}
24. ^{{cite news |url=http://stevemunro.ca/2009/05/25/sheppard-lrt-don-mills-connection-unveiled-sort-of/ |title=Sheppard LRT Don Mills Connection Unveiled, Sort Of |publisher=Steve Munro |first=Steve |last=Munro |date=2009-05-25 |accessdate=2009-05-25}}
25. ^{{cite news |url=http://stevemunro.ca/2009/04/01/ontario-funds-three-transit-city-routes/ |title=Ontario Funds Three Transit City Routes |publisher=Steve Munro |first=Steve |last=Munro |date=2009-04-01 |accessdate=2009-04-01}}
26. ^{{cite news |url=http://stevemunro.ca/2009/02/14/transit-city-status-update/ |title=Transit City Status Update |publisher=Steve Munro |first=Steve |last=Munro |date=2009-02-14 |accessdate=2009-02-14}}
27. ^{{cite news |url=http://www.ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2009/December_16_2009/Reports/Request_for_approval.pdf |title=Request for Approval of the Etobicke-Finch West LRT Environmental Assessment Study |publisher=Toronto Transit Commission |date=2009-12-16 |accessdate=2009-12-16}}
28. ^{{cite news |url=http://www.metrolinx.com/en/projectsandprograms/transitexpansionprojects/20140709_finch_west_open_house.aspx |title=Finch West Light Rail Vehicle Maintenance and Storage Facility Environmental assessment |publisher=Metrolinx |date=2009-07-09 |accessdate=2015-05-31}}
29. ^{{cite news |url=http://www.metrolinx.com/en/projectsandprograms/transitexpansionprojects/20140709_finch_west_open_house.aspx |title=Finch West LRT Project |publisher=Metrolinx |date=2009-07-09 |accessdate=2015-06-01}}
30. ^{{cite web |url=http://www.metrolinx.com/en/projectsandprograms/projectpages/FinchWest.aspx |title=Finch West Light Rail Transit |publisher=Metrolinx |accessdate=2017-10-10 |quote=In February 2016, Infrastructure Ontario (IO) and Metrolinx released a Request for Proposal (RFP) to companies shortlisted to design, build, finance and maintain the Finch West Light Rail Transit (LRT) project. In May 2017, Metrolinx confirmed that it had entered into an agreement with Alstom to build 17 light rail vehicles for the Finch West LRT project. The RFP is expected to close by the end of 2017, with construction slated to begin in 2018.}}
[22][23][24][25][26][27][28][29][30]
}}

External links

  • Official TTC site
  • Metrolinx Finch West LRT Project page
  • Mosaic Transit Group]
{{Toronto Transit Commission}}{{Transit City}}{{Big Move RT}}{{DEFAULTSORT:Finch West Lrt}}

5 : Light rail in Canada|Transit City|Proposed Toronto rapid transit projects|The Big Move projects|Public–private partnership projects in Canada

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/21 3:18:36