词条 | Lochaber Narrow Gauge Railway |
释义 |
| name = Lochaber Narrow Gauge Railway | image = Lochaber bridge15.jpg | image_width = 255px | caption = Bridge number 15 on the closed Upper Works Railway, photographed in 1995 | gauge = {{RailGauge|3ft}} | linelength_mi = 25 | open = 1925 | close = 1977 | locale = Scotland {{coord|56.822|-4.721|region:GB_scale:10000}} Headquarters: Fort William | map = {{Lochaber narrow gauge railway}} }} The Lochaber Narrow Gauge Railway was a {{RailGauge|3ft|lk=on}} narrow-gauge industrial railway. It was a relatively long line, built for the construction and subsequent maintenance of a {{convert|15|mi|km}} long tunnel from Loch Treig to a factory near Fort William in Scotland.[1] The tunnel was excavated to carry water for the Lochaber hydroelectric scheme in connection with aluminium production by British Aluminium. The railway came to be known colloquially as the 'Old Puggy Line'. ConstructionThe railway was initially built for the contractors Balfour Beatty to move workers and materials during construction of the tunnel. It was originally intended as a temporary feature. Later, a decision was made to retain the railway for the delivery and despatch of materials and to assist with the maintenance of the tunnel. Description of railwayThe principal location on the railway was the factory area (or 'Base Camp' prior to its opening), where there were various facilities such as a locomotive and speeder shed. Some of the sidings here were of mixed gauge ({{RailGauge|3ft}} narrow gauge and 4 feet 8 1⁄2 inches (1,435.1 mm) standard gauge). The railway as a whole comprised a network of lines as follows: Pier railwayThe pier railway ran from "base camp" (near the factory site) to a pier on Loch Linnhe. It was built to enable construction materials to be brought in. Its length was {{convert|1.75|mi|km}}. It crossed over the West Highland Railway and the Mallaig Extension Railway of the LNER on separate bridges east of Mallaig Junction (as it was then known). Later, a decision was made to retain the pier railway for the delivery of alumina and despatch of the finished aluminium ingots. The original railway, however, was not on a suitable alignment as it passed through the proposed site for Inverlochy village and also it crossed the A82 road on the level. Construction of a permanent pier railway commenced in 1927. It crossed the West Highland Railway on a bridge immediately west of Mallaig Junction. This bridge is no longer in situ. It had been the intention that the permanent pier railway would be worked by electric traction, supplied by overhead lines, but this was never implemented. In addition, the bridges and embankments were built wide enough for double track, but the line remained single track throughout its life. Upper Works RailwayThis was by far the longest part of the rail system, running for some {{convert|19|mi|km}} from base camp to the valve shafts located by Loch Treig. The first part of the railway climbed steeply for {{convert|4.25|mi|km}} at gradients of 1 in 30 or even 1 in 25. There were about 90 bridges on the line. Most of the bridges were originally timber trestles but all were subsequently rebuilt in steel using suitable scrap material from the factory. Near the middle point of the railway, at a location known as "central", there was a triangle for turning trains. Portal incline railwayThis was a short branch line that joined the Upper Works Railway close to base camp. It climbed to a height of {{convert|550|ft|m|1}}. Wagons were hauled by an electric winch at the top of the incline, which had a maximum gradient of 1 in 2½. Branch to adit 10This branch connected with the Upper Works Railway and was {{convert|0.75|mi|km}} in length. Branch to shaft/intake 7This branch connected with the Upper Works Railway and was {{convert|0.5|mi|km}} in length. Treig–Laggan railwayThis was a branch line some {{convert|3.25|mi|km}} in length. Built in 1930, it ran from a junction with the Upper Works Railway to Laggan Dam on Loch Laggan. The branch crossed over the West Highland Railway at Fersit on a 26-span timber trestle bridge. Much of the bridge was gradually filled in to form an embankment. Branch to shaft CThis branch connected with the Treig–Laggan railway and was ½ mile in length. ClosureIn October 1971, heavy rainfall caused part of the Upper Works Railway to be washed away, leaving a gap of around {{convert|70|ft|m}} in the track. Following this event, the future of the railway had to be considered. At that time, the Forestry Commission was constructing many access roads in the area. It was therefore decided that further roads should be built, rather than repair the track. However, due to the length of time it took to achieve this, the railway continued to operate for a number of years. Two locomotives and two speeders had been stranded on the far side of the breach from the factory. The railway finally closed in 1977. Current statusFollowing closure of the railway, most of the track was lifted, but the steel bridges were mostly left in place. Some odd lengths of track remain in place, particularly on some of the longer bridges. There has been talk of reopening part of the Upper Works Railway as a tourist attraction.[2] See also
References1. ^{{coord|56.819|-5.110|display=inline|region:GB_scale:10000}} 2. ^{{cite web| url=http://www.obantimes.co.uk/news/archivestory.php/aid/5017/Bringing_the_%91Puggy%92_back_to_Lochaber.html| title=Bringing the "Puggy" back to Lochaber| publisher=The Oban Times| date=18 March 2005| accessdate=17 October 2009}}{{dead link|date=January 2018 |bot=InternetArchiveBot |fix-attempted=yes }}
External links{{commons category|Lochaber Narrow Gauge Railway}}
6 : 3 ft gauge railways in Scotland|Industrial railways in Scotland|Railway lines opened in 1925|Lochaber|1925 establishments in Scotland|Railway lines closed in 1977 |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。