|country=GBR |type=M |route=54 |length_mi=23.0 |maint= Highways England | direction_a= East |terminus_a= Essington |destinations= Wolverhampton, Telford |direction_b= West |terminus_b= Wellington |previous_type = M |next_type = M |previous_route = 53 |next_route = 55 |counties= Staffordshire, Shropshire |established= 1975 |history=Constructed 1975–1983 |junction= J10a → M6 motorway |map=M54 motorway (Great Britain) map.svg }} The M54 is a 23-mile (37 km) east-west dual carriageway in the English counties of Shropshire and Staffordshire. It is also referred to as the Telford dual carriageway, after the road's primary westbound destination, the new town of Telford.[1] The dual carriageway cost £65 million to construct, and is two-lane dual carriageway for the majority of its length, with sections of three-lane.[2] The M54 spur connects the M6 motorway near Essington, Staffordshire with the A5 trunk road at Wellington, Shropshire.[3] The motorway forms part of the strategic route to North Wales, roughly following the path of the Roman Watling Street and the A5 north-westwards, towards the port of Holyhead.[4] It is the only motorway in Shropshire, and forms a vital part of the county's road network.[5] The motorway handles an AADT of between 50,300 (J2-3) and 41,800 (J4-5) vehicles.[6] HistoryPlanningThe idea of the M54 was originally presented due to the high volumes of traffic on the A5, London to Holyhead road which was largely constructed by civil engineer Thomas Telford in the early 19th century following the route of the Roman Watling Street, which connected Rochester, Kent with Wroxeter, Shropshire. The initial plan for a motorway following the M54's present route was therefore designed to alleviate the roads which handled the commercial traffic to the port of Holyhead, destined for Ireland.[1] With the proposal in the early 1960s for a new town to provide an overspill housing area for the West Midlands conurbation, then named Dawley New Town (designated as Telford in 1967), the M54 was becoming more likely to be built; the government also wanted to increase transport provision to the rest of Shropshire.[1] In 1967 the Ministry of Transport invited construction company Freeman Fox, Wilbur Smith Associates (FFWSA) to investigate and report on the impact of the New Town proposals on traffic demand between the proposed New Town site and Wolverhampton, and the best highway solution to meet this demand. The predicted demand was that of 75,000 vehicles per day by 1990 and a need for a dual 3-lane motorway. Two corridors were identified for a possible new motorway route, and a third option to possibly upgrade existing roads. The route could have followed the A5 Corridor to the M6 South of Gailey, at junction 12, or a new corridor could have been established to the M6, north-east of Featherstone, at junction 11. Additionally, it was proposed that the existing A5 could be upgraded to full dual carriageway grade separated standards together with improvements to the A41 and A464 trunk routes.[1] The Wellington bypassThe first section of the M54 was opened in 1975,[7] then named the A5 Wellington bypass (bypassing one of the existing towns which formed part of Telford), but renumbered the M54 in 1983 when the motorway was extended. The bypass removed traffic from the heavily congested route through the urbanised areas of Oakengates and Wellington, and removed one of the country's most notorious bottlenecks at the Bucks Head crossroads, in Wellington; delays of up to six hours could be experienced in the summer months.[1] ConstructionThe Wellington bypass was constructed by contractor M. J. Gleeson Ltd, from 1973 to 1975. Many problems followed in the two years after completion; the rigid concrete carriageway broke up, due to the road being built on a poor subbase with rigid concrete along a historically heavily mined route. The aesthetic and constructional design of the bridges was also heavily criticised. Over the next 15 years, almost all of the original carriageway had to be replaced with asphalt.[1] The {{convert|30|km|mi}} section between the junction with the M6, and Telford, excluding the Wellington bypass, was divided into four contracts each awarded to different companies; all sections remained under the design of Sir Owen Williams and Partners.[1]
The Forge junction at Telford Town Centre was awarded relatively late, to the company Norwest Holst. The junction precipitated the construction of Telford Shopping Centre, and the central commercial area, as the exchange was upgraded to allow traffic from the motorway to join and exit in both directions.[1] The Forge to Cluddley section, from junction 5 to junction 7, opened to traffic in December 1975. The Hilton Park to Forge section, from the M6 to junction 5, opened in November 1983.[8] The motorway cost 65 million pounds to build,[2] which when adjusted for inflation would come to approximately 150 million 2006 GBP.[9] To help alleviate opposition to the intrusive motorway design, the {{convert|60|ft|m}} wide carriageway was built to pass below the natural landscape, where possible. Man-made hills were constructed which, along with the planting of 250,000 new trees, helped to camouflage the motorway from view, and cut down on the noise level. This aesthetic improvement project took two and a half years to complete and employed over 100 people.[5] Impact{{See also|Telford#Economy}}The recent strong economic growth and lower unemployment in the Telford area has been attributed to the construction of the motorway: unemployment in the 1980s was over 20%, but by 2004 this figure had fallen to 3.3%.[5] The motorway enabled the development of distribution centres in Telford, and industrial estates such as Hortonwood and Stafford Park have provided employment in the area.[10] Some of the highest pollution levels in the borough of Telford and Wrekin are along the M54, particularly in the urban area between junctions 5 and 7.[11] The M54 is particularly busy in mid-August: it carries traffic to the V Festival at Weston-under-Lizard from the south (via the M6),[12] and to the Shrewsbury Flower Show from the east.[13] RouteThe road runs west from junction 10A of the M6 motorway near Essington, Staffordshire (Map). It passes south of Featherstone near junction 1 and then north of Bushbury before reaching junction 2. Just before junction 3 with Albrighton the road enters Shropshire. It then passes to the north of Shifnal. Between junction 4 and junction 5, the road passes across the Wolverhampton to Shrewsbury railway line, and through the centre of Telford. Between junctions 6 and 7, the road runs around the south of Wellington before joining the A5 (Map), which continues on to Shrewsbury as dual carriageway.[3] Telford Motorway Service Station opened on 18 March 2003 at junction 4, and is operated by Welcome Break.[14] It is the only service station on this motorway and, if travelling east, the last before Corley on the M6 or Frankley on the M5.[15]Proposed developmentsExtension of the M54 to ShrewsburyThe Department for Transport (DfT) is currently investigating the possibility of extending the M54 westward to Shrewsbury, thereby placing the county town on the UK motorway map for the first time. Currently traffic has to continue onto the dual carriageway A5 when the M54 ends at Wellington although the road surface or speed limits do not change at all but the road. It is not motorway standard from the M54 J7 to the Shrewsbury ring road, because laybys would need to be removed and a hard shoulder would also need to be built which could cause delays to traffic.[16] M54 to M6 / M6 (Toll) Link RoadThe M54 currently meets the M6 at junction 10A where there is no access to the northbound M6 or to the M6 Toll. Northbound access to the M6 is via the A449 from junction 2 and the most direct route to the M6 Toll is via the congested A460 from junction 1.[17] Plans for a link road between the M54 and the M6 Toll (M6 junction 11a) were supported in principle by the Secretary of State for Transport in 2003[18] and were put on display in 2006 with an expected construction date of 2012. The £102m cost for the scheme would be paid for by The Macquarie Infrastructure Group (the company that owns Midland Expressway Ltd and operates the M6 Toll).[19] Other proposalsIn February 2009, local newspaper the Shropshire Star reported plans to create a flyover linking the M54 and A442 in Telford town centre, just south east of Telford Central railway station. Presently traffic has to travel along a single carriageway portion of the A5, and pass through two roundabouts to access the M54. Since Junction 5 of the motorway is only {{convert|200|m|yd}} from the current bridge across the A442, the plans would involve either having two motorway junctions immediately next to each other, or one complex flyover. Proposals for a 'Western Bypasses of Wolverhampton and Stourbridge' were rejected by the government in 2003.[18] JunctionsData[20] from driver location signs are used to provide distance and carriageway identifier information.
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。
Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/15 16:06:44 |