请输入您要查询的百科知识:

 

词条 Marine transfer operations
释义

  1. Person-in-charge

  2. Marine surveyor

  3. Regulations

  4. Marine transfer operators

  5. See also

  6. External links

{{Unreferenced|date=August 2010}}

Marine Transfer Operations are conducted at many ports around the world between tanker ships, barges, and marine terminals. Specifically, once the marine vessel is secure at the dock a loading arm or transfer hose is connected between a valve header on the dock and the manifold header on the vessel. A marine transfer of petroleum products cannot be conducted unless it is supervised by a person-in-charge (PIC) on the vessel who is seafarer in the Merchant Marine and another person-in-charge on the dock.

Person-in-charge

The person-in-charge on the dock is called a Loading master-PIC and the person-in charge on the barge will be the Tankerman-PIC. The person-in-charge on a tanker ship will be the deck officer who monitors the transfer of product in the cargo control room. All persons-in-charge must have special training in order to obtain the proper credentials such as licensing and endorsement on their merchant mariner documents.

Marine surveyor

Loading Masters work closely with the marine surveyor in agreeing to the sequence of the transfer. Such as whether any product sampling will take place prior to commencement, determining if a line displacement will occur, agreeing on whether the final stop at completion will either be a shore stop or a draft stop on the vessel. The marine surveyor gauges the vessel's tanks and shore tanks to ensure the correct amount of product is transferred. Additionally, the surveyor or inspector will obtain product samples on the marine vessel and shore tank for laboratory analysis to ensure that the product meets all specifications of purity.

Regulations

Transfer operations and commencement of a transfer is highly regulated throughout the world with consideration of the environment with potential of water pollution occurring if petroleum product is released into the water during the transfer. Federal, state, and local laws must be observed during marine transfer operations.

Maritime Security (USCG), occupational safety and health regulations must be adhered to in addition to environmental regulations during marine transfer operations. These regulation's are enforced by local state port control organizations such as the United States Coast Guard in the United States.

Marine transfer operators

A marine transfer operation occurs between three main stakeholders which includes the Loading Master-PIC, Vessel Person-In -Charge PIC, and marine surveyor or inspector. These individuals communicate prior to the transfer agreeing on the sequence of events that will occur before, during, and after the transfer. During the course of the transfer the Loading Master is in continuous two way radio contact with the vessel Person-In-Charge and standing by to stop the transfer immediately if any problems develop such as leaks at the transfer hose or loading arm.

See also

  • Barge
  • Tanker
  • Oil tanker
  • Marine loading arm

External links

  • [https://web.archive.org/web/20061108040050/http://www.loadingmaster-pic.com/ Marine Transfer Operations]
  • [https://web.archive.org/web/20070314005627/http://www.marinelink.com/Story/search.aspx?SearchString=barge&Dates=20060524 Barges News]
  • Google Group Marine Transfer Operations
{{DEFAULTSORT:Marine Transfer Operations}}

3 : Water transport|Barges|Water pollution

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/15 18:11:40