请输入您要查询的百科知识:

 

词条 Mildura railway line
释义

  1. History

  2. Services

      Maryborough services  

  3. Line guide

  4. See also

  5. References

  6. External links

{{short description|Railway line in Victoria, Australia}}{{Use dmy dates|date=January 2012}}{{Use Australian English|date=January 2012}}{{Infobox rail line
| box_width =
| name = Mildura
| other_name = Yelta
| native_name =
| native_name_lang =
| color =
| logo =
| logo_width =
| logo_alt =
| image =
| image_width =
| image_alt =
| caption =
| type = Heavy rail
| system =
| status = Operational
| locale = Victoria, Australia
| start = Yelta
| end = Ballarat
| stations =
| routes = Maryborough
| daily_ridership =
| ridership2 =
| planopen =
| open =
| yearcommenced = {{Start date|1874|df=y}}
| yearcompleted = {{Start date|1903|df=y}}
| close =
| event1label =
| event1 =
| event2label =
| event2 =
| event3label =
| event3 =
| owner = VicTrack
| operator = Passenger: V/Line
Freight: Pacific National
| character =
| depot =
| stock =
| linelength_km = 474.4
| linelength_mi =
| linelength =
| tracklength_km =
| tracklength_mi =
| tracklength =
| tracks = 1
| gauge = {{Unbulleted list|{{Track gauge|1435 mm|allk=on}} between Yelta and Maryborough|{{Track gauge|1600 mm|allk=on}} between Maryborough and Ballarat}}
| old_gauge =
| load_gauge =
| minradius =
| racksystem =
| routenumber =
| linenumber =
| electrification = None
| speed_km/h =
| speed_mph =
| speed =
| signalling =
| elevation_m =
| elevation_ft =
| elevation =
| website =
| map =
| map_name =
| map_state =
| embedded =
}}

The Mildura railway line is a heavy rail line in northwestern Victoria, Australia. The line runs from Yelta station to Ballarat station via the settlements of Mildura, Ouyen and Maryborough in an approximate south-southeasterly direction. Initial sections of the line opened from Ballarat in 1874 and the line reached Mildura in 1903.

The line is primarily utilised by freight services. V/Line passenger services also operate on the line between Maryborough and Ballarat.

History

The Mildura line was opened from Ballarat to Creswick, Clunes, Maryborough and Dunolly in 1874 and 1875, and extended to St Arnaud in 1878, Donald in 1882, Birchip in 1893, Woomelang in 1899, Ouyen, Red Cliffs and Mildura in 1903, Merbein in 1910 and Yelta in 1925.

A line was opened from Ballarat to Waubra in the 1880s. It closed in the 1960s.

A branch line was built from North Creswick to Daylesford in 1887, connecting with the line from Carlsruhe. It had stations at Broomfield, Allendale, Newlyn, Rocklyn, Wombat, Leonard, Sailor's Falls and Woodburn. This line closed in 1953.

A line was opened from Maryborough to connect with the Melbourne–Bendigo line at Castlemaine in 1874. This line is not currently used by regular traffic.

Another branch line was opened from Maryborough to Avoca in 1876 and Ben Nevis and Ararat in 1890. This line was closed in 1959, reopened in 1966, standardised in 1996 and closed again in 2005. The Navarre line opened from Ben Nevis to Navarre in 1914 and it was closed in 1954.

A line was opened from Dunolly to Inglewood in 1888, connecting with the Bendigo–Boort line, completed in 1883.

The Pinnaroo line (Victoria) opened from Ouyen to Murrayville in 1912 and the South Australian border in 1915, connecting with the Pinnaroo line (South Australia) to Pinnaroo and Tailem Bend. The Genesee & Wyoming Australia line west of Pinnaroo was standardised in 1998 creating a break-of-gauge. Nevertheless, it is proposed to standardise the line from Geelong to Mildura and the line between Ouyen and Pinnaroo. In 2006, state and federal money was announced to upgrade the line to Mildura with gauge convertible sleepers. However, this upgrade will still leave the passenger service in limbo.

The Morkalla line was completed from Red Cliffs to Meringur in the 1920s and extended to Morkalla in the 1930s. This line closed in the 1980s. A 2 km section of the line near Red Cliffs has been converted to a 610 mm-gauge steam railway, operated occasionally by the Red Cliffs Historical Steam Railway (see Victorian Tourism).

In 1923, a series of sidings were placed between the Mildura station and the wharves on the Murray River. These included a zig-zag section to enable trains to travel between the different elevations. These sidings were removed in 1973.[1]

A passenger service was provided by V/Line with three weekly overnight services from Melbourne (known as The Vinelander), including sleeping cars, until 1993 when it was discontinued by the Kennett Government.[2] The former Bracks/Brumby Governments promised to re-open this line to passenger traffic as part of its pledges for the 1999, 2002, 2006 elections. They also pledged the reopening of Clunes station in the 2010 election.

In December 2007 work began on upgrading the line between Gheringhap (on the Geelong–Ballarat line and Mildura, at a cost of $73 million and involving one in every two sleepers being replaced, and lifting maximum train speeds to 80 km/h.[3] Current speeds are restricted to 50 km/h on one-third of the track and are as low as 30 km/h in some sections.[4] In April 2008 it was announced that the Mildura–Yelta section of the line would also be upgraded, as part of the Victorian core grain network in a $23.7 million package with 6 other lines.[5]

As part of upgrades for the return of Maryborough passenger services, the crossing loops at Sulky, Tourello and Talbot stations have been removed, resulting in only one train at a time being able to use the 60 kilometres of line between Ballarat and Maryborough.[6] The loop at Sulky was removed on 12 February, the loop at Talbot on 24 February.[7]

In October 2010, the Victorian government released a report into public transport improvement options for the north-west of Victoria, outlining nine proposals for public transport projects. Options discussed include the return of passenger trains on the existing line, or via an extension of the Yungera line to connect to the Mildura line at Ouyen.[8][9]

Passenger services were reintroduced from Ballarat to Maryborough in July 2010, after a 13-year absence.[10][11]

The line closed in August 2017 north of Dunolly for conversion to standard gauge as part of the Murray Basin Rail Project.[12] It reopened gradually from February 2018 with maximum axle load lifted to 21 tonnes and line speed increased to 80km/h.[13]

Services

The main freight traffic on the line is export grain and containerised wine, grapes, citrus, dried fruit and juice, totalling around 1.5 million tonnes per year. Containers are dispatched to Melbourne from a terminal at Merbein (a short distance north of Mildura) operated by Wakefield Transport,[14] which handles approximately 13,000 export containers a year, as well as 500 import containers.[15] Cement is also despatched to Mildura from Waurn Ponds, oil and less than container load (LCL) freight were carried until 2007.[16] A freight terminal also exists at Donald, and grain services run as required.

Maryborough services

{{Infobox rail service
| box_width =
| name = Maryborough
| color =
| logo = Victoria train logo.svg
| logo_width = 100px
| image =
| image_width =
| caption =
| type = Regional rail
| status = Operational
| locale = Victoria, Australia
| predecessor =
| first = {{Start date and age|2010|07|25|df=y}}
| last =
| successor =
| operator = V/Line
| formeroperator =
| ridership =
| ridership2 =
| website =
| start = Maryborough
| stops = 5
| end = Ballarat
| distance = {{Convert|68.7|km|abbr=on}}
| journeytime = 52 minutes
| frequency = 2 services on weekdays, 1 service on weekends each direction
| trainnumber =
| line_used = Mildura
| class = Economy
| access = Yes
| seating =
| sleeping =
| autorack =
| catering = No
| observation =
| entertainment =
| baggage =
| otherfacilities =
| stock =
| gauge = {{Track gauge|1600 mm}}
| el = None
| speed =
| owners = VicTrack
| routenumber =
| map =
| map_state =
}}

In December 2008 as part of the Victorian Transport Plan the state government announced that V/Line rail passenger services would be extended from Ballarat to Maryborough station at a cost of $50 million,[17] commencing 25 July 2010.[18] Initially Creswick was to be the only intermediate station,[19][20] until June 2010 when the government announced $7 million in funding to also reopen Clunes.[21] Talbot also reopened in December 2013.

Two services on weekdays and one service on weekends in each direction operate as a shuttle between Maryborough and Ballarat, stopping at all operating stations. At Ballarat, all terminating services connect to an Ararat or Ballarat service towards Melbourne, and all originating services bound for Maryborough connects to a service from Melbourne.

Line guide

{{Maryborough V/Line Service}}{{Mildura Line}}

See also

  • Avoca railway line

References

1. ^"Mildura's Riverfront Railways" Australian Railway Historical Society Bulletin February 1978 pages 33–38
2. ^{{cite web|url=http://www.historyvictoria.org.au/pdf/Mildura.pdf|title=The Mildura Story The Battle of the Routes|publisher=Royal Historical Society of Victoria|accessdate=2008-08-30}}
3. ^{{cite web|url=http://www.minister.infrastructure.gov.au/aa/releases/2007/December/AA001_2007.htm|title=WORKS BEGIN ON MILDURA RAIL FREIGHT UPGRADE|publisher=www.minister.infrastructure.gov.au|accessdate=2008-04-27}}
4. ^{{cite web|url=http://www.doi.vic.gov.au/Doi/Internet/Freight.nsf/AllDocs/CEFAA4D3E21F849DCA2573290018A76E?OpenDocument|title=Roads, ports and freight - Mildura Rail Freight Upgrade - Frequently asked questions|publisher=www.doi.vic.gov.au|accessdate=2008-04-27}}
5. ^{{cite web|url=http://business.theage.com.au/43m-to-upgrade-rail-freight-lines/20080421-27nl.html|title=$43m to upgrade rail freight lines |publisher=business.theage.com.au|accessdate=2008-04-27}}
6. ^V/Line Weekly Notice: "NORTH BALLARAT - MARYBOROUGH. TOURELLO LOOP ABOLISHED LEVEL CROSSING UPGRADES"
7. ^"Signalling and Infrastructure" Railway Digest May 2010 page 56
8. ^Victorian Government press release—"NORTH WEST PUBLIC TRANSPORT REVIEW REPORT RELEASED", 13 October 2010
9. ^North West Public Transport Review
10. ^{{cite web|title=V/Line Annual Report 2009-2010|url=http://www.vline.com.au/pdf/publications/annualreports/annualreport09-10.pdf|publisher=V/Line Pty Ltd|page=7|date=September 2010}}
11. ^{{cite web|title=Transport Projects - Maryborough Rail Services|url=http://www.transport.vic.gov.au/web23/Home.nsf/AllDocs/2e119eebf81209d2ca257625001ae39c?OpenDocument|work=Department of Transport website|publisher=Department of Transport|accessdate=2 July 2011}}
12. ^{{cite news|last1=Probert|first1=Oliver|title=Murray Basin upgrades begin|url=https://www.railexpress.com.au/murray-basin-upgrades-begin/|accessdate=18 February 2018|work=Rail Express|date=1 August 2017|language=en-AU}}
13. ^{{cite news|last1=DiFabrizio|first1=Michael|title=Birchip stretch in train|url=http://www.sunraysiadaily.com.au/story/5227053/birchip-stretch-in-train/|accessdate=18 February 2018|work=Sunraysia Daily|date=14 February 2018|language=en}}
14. ^{{cite web|url=http://www.doi.vic.gov.au/DOI/Internet/Freight.nsf/AllDocs/0B68D60810012C21CA256E05000488F9?OpenDocument|title=Roads, ports and freight - Intermodal terminals|publisher=www.doi.vic.gov.au|accessdate=2008-08-01|deadurl=yes|archiveurl=http://webarchive.loc.gov/all/20090604215006/http://www.doi.vic.gov.au/DOI/Internet/Freight.nsf/AllDocs/0B68D60810012C21CA256E05000488F9?OpenDocument|archivedate=4 June 2009|df=dmy-all}}
15. ^{{cite web|url=http://www.infrastructure.gov.au/transport/publications/files/Melbourne_Mildura_Corridor_Strategy.pdf|title=Melbourne–Mildura Corridor Strategy|work=Building our National Transport Future|year=June 2007|publisher=Department of Transport and Regional Services|accessdate=2009-11-03|deadurl=yes|archiveurl=https://web.archive.org/web/20091027015306/https://www.infrastructure.gov.au/transport/publications/files/Melbourne_Mildura_Corridor_Strategy.pdf|archivedate=27 October 2009|df=dmy-all}}
16. ^{{cite web|url=http://wongm.railgeelong.com/mildura-freight|title=Wongm's Rail Gallery - Mildura freight|publisher=wongm.railgeelong.com|accessdate=2009-11-03}}
17. ^{{cite web|url=http://www4.transport.vic.gov.au/vtp/projects/maryborough.html |title=Maryborough Rail Extension Projects |work=Victorian Transport Plan |publisher=www4.transport.vic.gov.au |accessdate=2008-12-08 |deadurl=yes |archiveurl=https://web.archive.org/web/20081226160039/http://www4.transport.vic.gov.au/vtp/projects/maryborough.html |archivedate=26 December 2008 |df= }}
18. ^{{cite web|url=http://www.transport.vic.gov.au/web23/Home.nsf/AllDocs/2e119eebf81209d2ca257625001ae39c?OpenDocument|title=Maryborough Rail Services|work=Victorian Transport Plan|publisher=www.transport.vic.gov.au|accessdate=2010-07-05}}
19. ^{{cite web |url=http://www.thecourier.com.au/news/local/news/general/call-to-explain-clunes-omission-from-rail-plan/1643848.aspx |author=KIM STEPHENS |date=7 October 2009 |title=Call to explain Clunes' omission from rail plan |work=The Courier |publisher=www.thecourier.com.au |accessdate=2010-06-15 }}
20. ^{{cite web|url=http://www.thecourier.com.au/news/local/news/general/no-plans-for-clunes-train/1646383.aspx |title=No plans for Clunes train |author=EMMA BROWN |date=11 October 2009 |work=The Courier |publisher=www.thecourier.com.au |accessdate=2010-06-15 }}
21. ^{{cite web|url=http://www.premier.vic.gov.au/newsroom/10767.html |title=READY FOR TOMORROW: $19 MILLION TO RETURN PASSENGER RAIL TO CLUNES AND IMPROVE NORTH-WEST FREIGHT RAIL LINKS |date=June 2010 |work=Media Release: Premier of Victoria |publisher=www.premier.vic.gov.au |accessdate=2010-06-15 |deadurl=yes |archiveurl=https://web.archive.org/web/20100618061520/http://www.premier.vic.gov.au/newsroom/10767.html |archivedate=18 June 2010 |df= }}

External links

  • Statistics and detailed schematic map at the vicsig enthusiast website
{{Victorian Railway Lines|Main|state=collapsed}}

5 : Freight railway lines in Victoria (Australia)|Mildura|Railway lines opened in 1874|5 ft 3 in gauge railways in Australia|Standard gauge railways in Australia

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/28 7:16:38