The Pennyland project was one of a series of low-energy building experiments sparked by the 1973 oil crisis. It involved the construction of an estate of 177 houses in the Pennyland area of Milton Keynes, Buckinghamshire, United Kingdom. It compared possible future UK building efficiency standards with newly introduced Danish ones. Although identical externally, half the Pennyland houses (Area 1) were built to the proposed 1982 UK Building Regulations energy efficiency standards. The other half (Area 2) were built to the much more demanding 1977 Danish BR77 standard. (In Europe, BR77 and the Swedish SBN-80 standards set the benchmark for low-energy housing at the time.) Sponsored by the UK Department of Energy, Department of Environment and Milton Keynes Development Corporation, and using the technical expertise of the Open University Energy Research Group, the houses were constructed during 1979 and 1980. For comparison, two additional groups of control houses, already built in 1978, were studied on an adjoining site at Neath Hill. A further group, the Linford low energy houses were built to the Pennyland Area 2 standards and used for more detailed tests. DesignThe Pennyland estate was laid out to take advantage of solar gain. The majority of houses faced south with the main living rooms located on the south side. They were designed with an insulated cavity wall with a poured concrete inner leaf to provide thermal mass. This had the added benefit of increasing airtightness. Nearly all were fitted with conventional radiator central heating systems. Several levels of insulation, heating system efficiency and passive solar design were compared: At Neath Hill most houses featured
About 20 of the Neath Hill houses were retrofitted with foam cavity fill wall insulation. The Pennyland Area 1 houses featured:
The Pennyland Area 2 houses (almost Danish BR77 standards) featured:
Lessons learnedThe houses were monitored over the winters of 1981 and 1982 with energy and internal temperatures being measured in a large sample of houses on a weekly average basis. More detailed monitoring on an hourly basis was carried out on the Linford houses. Among the lessons learned were:
ImpactThe short payback times encouraged Milton Keynes Development Corporation to introduce its own Building Regulation standards for new housing within the city leading to the major 1986 Energy World demonstration project and exhibition. The issue of mould growth in air-tight houses has since been tackled by Building Regulation requirements for specific ventilation in kitchens, bathrooms and toilets. The levels of insulation tested at Pennyland and Great Linford in the early 1980s were only surpassed in the UK Building Regulation requirements in 2002. See also
References
External links
3 : Low-energy building in the United Kingdom|Solar architecture|History of Milton Keynes |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。