请输入您要查询的百科知识:

 

词条 Ploiești–Siret Motorway
释义

  1. History

  2. Sections

  3. Gallery

  4. See also

  5. References

  6. External links

{{Infobox road
| header_type=UC
| country = ROU
| type =
| route =
| name = Ploiești–Siret Motorway
| translation = {{lang|ro|Drumul Expres Ploiești–Siret}}
| maint = Compania Națională de Autostrăzi și Drumuri Naționale din România
| map = Romania Motorways DE.svg
| length_km = 0.0
| length_round =
| length_ref =
| length_notes = {{convert|16.2|km|abbr=on}} under construction
| established =
| decommissioned =
| direction_a = South
| terminus_a = Ploiești (junction with A3)
| junction = A5 near Bacău
A8 near Pașcani
| direction_b = North
| terminus_b = Siret (border with Ukraine)
| beltway_city =
| counties =
| system =
| previous_type =
| previous_route =
| next_type =
| next_route =
}}

The Ploiești–Siret Motorway ({{lang-ro|Drumul expres Ploiești–Siret}}) is a planned motorway in Romania, designed to link Ploiești with the north-eastern part of the country, partly along the Pan-European Corridor IX. It was designed as the A7.

History

Initially it was designed as a 314 km long motorway branching off the A3 motorway and passing through Buzău, Focșani, and Albița, to the border with Republic of Moldova. However, since 2014 plans in favor of a motorway past Focșani were scrapped in favor of a motorway towards Bacău, Suceava, and Siret termed A7.[1] The motorway from Focșani to Albița (155 km)[2] will have a different route number assigned. As of April 2014, the section between Focșani and Albița is no longer a priority in the current master plan for the national motorway network.[3]

Sections

The first section, from Ploiești to Focșani (133 km),[4] was proposed for a concession contract for tendering first half of 2013.[5] No contract was signed, and the only section that has been tendered was the Bacău bypass (30.6 km, of which 16.2 km of motorway) in August 2013,[6] but built at only half profile.[6] It was awarded for construction in November 2013,[7] but the results of the tender were contested by some of the participants.[8] Later in 2014, the whole motorway was redesigned as an expressway that would later be expanded to full motorway specifications.

On 30 May 2016, the construction works at Bacău bypass started,[9] and was expected to be finished by 2022.[10] In 2018 this was reauctioned, with an optimistic deadline around 2021.

Gallery

See also

  • Roads in Romania
  • Transport in Romania

References

1. ^http://adevarul.ro/locale/arad/pe-lotul-autostrada-pecica--nadlac-putea-circula-cateva-zile-1_5486c1d3448e03c0fd985a10/index.html
2. ^{{cite web|title=Constructie autostrazi Coridorul IX Ploieşti - Albiţa Tronsonul Focşani - Albiţa|url=http://www.cnadnr.ro/proiect.php?id=263|publisher=CNADNR|accessdate=7 January 2014}}
3. ^http://economie.hotnews.ro/stiri-eurofonduri-16995937-fotogalerie-primele-imagini-masterplanul-pentru-transporturi-autostrazi-vrea-faca-guvernul-ponta-pana-2022.htm
4. ^{{cite web|title=Constructie autostrazi Coridorul IX Ploieşti - Albiţa Tronsonul Ploieşti - Buzău - Focşani|url=http://www.cnadnr.ro/proiect.php?id=262|publisher=CNADNR|accessdate=7 January 2014}}
5. ^{{cite web|title=CNADNR si-a anuntat intentia de construire, prin concesiune, a autostrazii Ploiesti-Buzau-Focsani|url=http://www.ziarulprahova.ro/stiri/administratia-locala/128515/cnadnr-si-a-anuntat-intentia-de-construire-prin-concesiune-a-autostrazii-ploiesti-buzau-focsani|publisher=Ziarul Prahova|date=15 January 2013}}
6. ^{{cite web|title=Primul tronson de autostrada din Moldova incepe sa prinda contur: Umbrarescu si Casuneanu se bat pentru centura ocolitoare a Bacaului|url=http://www.hotnews.ro/stiri-esential-15372311-primul-tronson-autostrada-din-moldova-incepe-prinda-contur-umbrarescu-casuneanu-bat-pentru-centura-ocolitoare-bacaului.htm|publisher=Hotnews|accessdate=18 December 2013|date=13 August 2013}}
7. ^{{cite web|title=O companie din Turcia va construi centura ocolitoare a Bacaului, primul tronson de autostrada din Moldova, in dauna firmelor lui Umbrarescu si Casuneanu|url=http://www.hotnews.ro/stiri-esential-16025499-companie-din-turcia-construi-centura-ocolitoare-bacaului-primul-tronson-autostrada-din-moldova-dauna-firmelor-lui-umbrarescu-casuneanu.htm|publisher=Hotnews|accessdate=7 January 2014|date=14 November 2013}}
8. ^http://www.ziaruldebacau.ro/licitatia-pentru-soseaua-de-centura-a-bacaului-a-fost-contestata/
9. ^Lucrările la Centura ocolitoare a muncipiului Bacău inaugurate
10. ^http://www.business-review.eu/news/from-national-unity-to-territorial-fracture-how-romania-builds-separate-motorway-networks-for-transylvania-connected-to-hungary-and-for-wallachia-going-nowhere-163726

External links

  • CNADNR – Coridorul IX Ploiești - Albița
{{Roads in Romania}}{{coord missing|Romania}}{{DEFAULTSORT:Ploiesti-Albita Motorway}}{{Romania-road-stub}}

2 : Proposed roads in Romania|Motorways in Romania

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/11 16:21:59