请输入您要查询的百科知识:

 

词条 Route 10 (Hong Kong)
释义

  1. Exit list

  2. References and external links

{{original research|date=February 2019}}{{Infobox road
|country=HKG
|type=route
|route=10
|alternate_name=Kong Sham Western Highway, Deep Bay Link/Hong Kong-Shenzhen Western Corridor
|map=HK_Route10_map.svg
|image=Shenzhen Bay Bridge To HK on Shenzhen Side.jpg
|map_notes=Route 10 coloured red
|length_km=10.9
|length_round=
|length_ref=
|length_notes=
|established=2007
|decommissioned=
|direction_a=South
|terminus_a={{Jct|country=HKG|route|9}} at Lam Tei
|direction_b=North
|terminus_b={{jct|state=GD|S|3}} / Dongbin Road (东滨路) in Shekou, Shenzhen
|junction=
|districts=Shekou, Tuen Mun
|previous_type=route
|previous_route=9
|next_type=route
|next_route=1
|ahn=
}}

Route 10 is the newest trunk route in the Hong Kong Strategic Route and Exit Number System. It is a 10.9 km dual carriageway with three lanes in each direction, consisting of the Kong Sham Western Highway (formerly Deep Bay Link) and the Shenzhen Bay Bridge of the Hong Kong-Shenzhen Western Corridor, connecting the Yuen Long Highway (Route 9) in Lam Tei to Shenzhen via border checkpoint Shenzhen Bay Port. The trunk route is the only{{cn|date=February 2019}} one in Hong Kong that terminates at a border crossing (and is partly built within the area of Shenzhen Municipality).

At one stage, the Hong Kong Government had proposed to build the Yuen Long-Lantau and the Lantau-Hong Kong Island sections of Route 10. While these proposals have since been shelved,[1] an alternative dual carriageway connection between Yuen Long / Tuen Mun and Lantau — the Tuen Mun–Chek Lap Kok Link[2] (connecting the Hong Kong-Zhuhai-Macau Bridge Border Crossing Facilities and North Lantau Highway with Pillar Point near the Tuen Mun River Trade Terminal) and Tuen Mun Western Bypass (starting at Pillar Point and connecting to Route 10 at Tsing Chuen Wai) — has since been put forward. Construction of the Tuen Mun - Chek Lap Kok Link began in 2010{{cn|date=February 2019}} and is scheduled for completion in 2019 or 2020, and will constitute a part of Route 10.[3] As of mid-2010, various alignments[4] for the Tuen Mun Western Bypass were being considered with ongoing consultation with the Yuen Long and Tuen Mun District Councils, Heung Yee Kuk and relevant rural committees.[5]

Exit list

{{HKGinttop|exit|length_ref=[6]}}{{Jctint|exit
|county_special=Yuen Long
|cspan=2
|location_special=Lam Tei
|exit=3
|km=0.0
|km2=1.0
|road={{Jct|country=HKG|Route|9}}
}}{{Jctint|exit
|location=none
|exit=1
|km=4.2
|km2=5.1
|road=Ha Tsuen Road
}}{{jctbridge|exit
|location=none
|river=Deep Bay
|rspan=
|type=
|km=5.3
|km2=11.0
|bridge=Hong Kong–Shenzhen Western Corridor
|bspan=
}}{{Jctint|exit
|county_special=Shenzhen
|location_special=Shekou
|exit=—
|km=11.0
|road=Shenzhen Bay Port
}}{{Jctbtm|exit}}

References and external links

1. ^http://www.nce.co.uk/objections-force-delay-to-hong-kongs-route-10/812296.article
2. ^ 
3. ^http://www.hyd.gov.hk/eng/major/road/projects/tmclkl_tmwb/index.htm {{dead link|date=February 2019}}
4. ^http://www.tmclkl-tmwb.com/en/web/overview/TMWB.htm
5. ^http://www.tmclkl-tmwb.com/en/web/new.htm
6. ^{{Cite map |publisher= OpenStreetMap |title=Route 10 |url=http://www.openstreetmap.org/#map=13/22.4534/113.9471 |author=OpenStreetMap contributors |access-date=27 June 2015}}
{{coord|22.43854|N|113.985339|E|type:landmark_source:enwiki-googlemaplink|display=title}}{{HK routes|routes;r10;}}{{HongKong-road-stub}}

2 : Routes in Hong Kong|Route 10 (Hong Kong)

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/17 7:06:48