词条 | Ruabon–Barmouth line |
释义 |
The Ruabon–Barmouth line was a standard-gauge branch line of the Great Western Railway across the north of Wales which connected Ruabon, in the east, with Barmouth on the west coast. Connections
HistoryThe line opened in stages by various companies:
The Aberystwyth and Welsh Coast Railway was absorbed by the Cambrian Railways which, with the other companies, was absorbed into the GWR. The line was double track from Ruabon (Llangollen Jc) to Llangollen Goods Junction. Beyond, there were passing places at Deeside, Glyndyfrdwy, Carrog, Corwen, Llandrillo, Llandderfel, Bala Junction, Llanuwchllyn, Garneddwen Halt, Drws-y-Nant, Bont Newydd, Dolgellau and Penmaenpool. ClosureThe whole line was officially closed to passenger trains as part of the Beeching Axe on 18 January 1965. Goods services between Morfa Mawddach (formerly Barmouth Jn) and Llangollen ceased in 1964. Although the whole line was planned to close for passenger services on 18 January 1965, services were suspended on 12 December 1964 following flooding. The section between Ruabon and Llangollen was subsequently reopened on 17 December for passenger trains until 18 January after which only freight services ran until 1968 when the line was closed completely. The section between Llangollen and Bala Junction was abandoned following flooding although a substitute bus service served the stations until 18 January 1965. The section between Bala, Bala Junction and Dolgellau was reopened on 17 December and the section Dolgellau to Morfa Mawddach reopened on 14 December.[6] Lifting of the track was completed in 1969. Current statusTwo sections of the line have been reopened as preserved railways; the narrow gauge Bala Lake Railway in 1972; and the standard gauge Llangollen Railway which first opened to passengers in 1981. A {{convert|10|mile}} section between Barmouth Junction and Dolgellau is used as the Mawddach Trail, a cycle route and bridleway, conversion of which was assisted in 1976 when heavy floods washed away most of the remaining ballast. . Several sections have been used for road improvement schemes, including a {{convert|1.5|mile}} section through Dolgellau, and the station site and trackbed west of {{stnlnk|Drws-y-Nant}}. The trackbed has also been redeveloped at the west end of Corwen and a number of houses and apartments have been built immediately east of Llangollen. Infringements occur between Llangollen and Acrefair (typically garden extensions and outbuildings) and the cutting through Cefn Mawr is partially blocked following land slips. At the end of Llanuwchllyn station, a house straddles the trackbed. In the countryside between these sites the trackbed remains disused although some sections are used for grazing cattle. ReferencesNotes1. ^Awdry (1990); p 48 2. ^Awdry (1990); p 31 3. ^Awdry (1990); p 23 4. ^Awdry (1990); p 14 5. ^Awdry (1990); pp 13 & 14 6. ^Steam World magazine October 2012 Sources
5 : Closed railway lines in Wales|Railway lines opened in 1868|Standard gauge railways in Wales|1868 establishments in Wales|1965 disestablishments in Wales |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。