请输入您要查询的百科知识:

 

词条 Shocks Mills Bridge
释义

  1. Construction

  2. Damage from Hurricane Agnes and repair

  3. References

{{Infobox Bridge
|bridge_name= Shocks Mills Bridge
|image=
|caption=
|official_name=
|also_known_as=
|carries= Norfolk Southern Railway
|crosses= Susquehanna River
|locale= Wago Junction, Pennsylvania and Marietta, Pennsylvania
|maint=
|id=
|design=brick arch; replacement center sections concrete and steel
|mainspan=
|length= 2209 feet
|width=
|clearance=
|below=
|traffic=
|open=January 1, 1905
|closed=
|toll=none
|map_cue=
|map_image=
|map_text=
|map_width=
|lat=
|long=
}}

Shocks Mills Bridge carries tracks of the Norfolk Southern Railway (formerly the Atglen and Susquehanna Branch of the Pennsylvania Railroad) over the Susquehanna River between Marietta, Pennsylvania and Wago Junction, Pennsylvania.

Construction

During the early 20th century, the PRR constructed what it referred to as its "Low-Grade Lines", branches constructed with a minimal grade to divert freight traffic from its congested and steeper main lines. One of these new lines was the Atglen and Susquehanna Branch, which left the Main Line at Parkesburg to cut cross-county to the Susquehanna River, followed the east bank of the river to Marietta, crossed the river and ran along the west bank to Wago Junction, where it met the Northern Central Railway. The line from Marietta to Wago Junction was chartered as the York Haven and Rowenna Railroad, and much of the construction, including the crossing of the Susquehanna at Shocks Mills, was done by H.S. Kerbaugh, a major PRR contractor. The bridge was first opened on January 1, 1905, as a twenty-eight span brick arch.[1]

Damage from Hurricane Agnes and repair

The bridge was closed during the flooding caused by Hurricane Agnes in late June 1972. Penn Central's commuter train service between Lancaster and Harrisburg was affected by the damages to the bridge, and freight traffic to Harrisburg was required to be re-routed. In August of that year, the federal bankruptcy court, overseeing the reorganization of Penn Central, gave the railroad permission to make repairs to the span, a process that was expected to take "four or five months".[2]

References

1. ^  PRR Chronology 1905
2. ^"PC Given Signal to Repair Span", The Daily News (Huntingdon, PA), August 29, 1972, p12
{{Crossings navbox
|structure = Bridges
|place = Susquehanna River
|bridge = Shocks Mills Bridge
|bridge signs = Norfolk Southern Railway
|upstream = Susquehanna River Bridge
|upstream signs =
|downstream = Wright's Ferry Bridge
|downstream signs =
}}{{coord|40.0616|N|76.6371|W|region:US_type:landmark|display=title}}{{Pennsylvania-bridge-struct-stub}}

12 : Railroad bridges in Pennsylvania|Bridges over the Susquehanna River|Pennsylvania Railroad bridges|Bridges completed in 1905|Bridges in Lancaster County, Pennsylvania|Bridges in York County, Pennsylvania|Norfolk Southern Railway bridges|Brick bridges in the United States|Concrete bridges in the United States|Steel bridges in the United States|Arch bridges in the United States|1905 establishments in Pennsylvania

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/20 20:43:20