词条 | Trans–West African Coastal Highway |
释义 |
|country=AFRICA |route=7 |name=Trans–West African Coastal Highway }} The Trans–West African Coastal Highway is a transnational highway project to link 12 West African coastal nations, from Mauritania in the north-west of the region to Nigeria in the east, with feeder roads already existing to two landlocked countries, Mali and Burkina Faso.[1] The eastern end of the highway terminates at Lagos, Nigeria. Some organizations such as the Economic Community of West African States (ECOWAS) consider its western end to be Nouakchott, Mauritania, and others such as the United Nations Economic Commission for Africa consider it to be Dakar, Senegal, giving rise to these alternative names for the road:
Route and statusOverall length and conditionThe length of the route is {{convert|4560|km|mi|0}} of which 83% or {{convert|3777|km|mi|0|abbr=on}} has been paved according to African Union (AU) documents,[1] or {{convert|4010|km|mi|0|abbr=on}} with {{convert|3260|km|mi|0|abbr=on}} paved, according to African Development Bank (ADB) reports (which do not include the Nouakchott-Dakar section of about {{convert|570|km|mi|0|abbr=on}}).[2] There are about 9 unpaved sections, but some paved sections require reconstruction. All are two-lane highways with the exception of short four-lane highways in the eastern third of the route. The ADB reports published in 2003 say that 32% of the highway is in poor condition, 9% is good and 59% is fair. Reconstruction of the segment in Lagos, Nigeria began in 2010, and when it is complete that section will be ten lanes wide.[3] Managing authoritiesThe highway is a project of ECOWAS and the New Partnership for Africa’s Development (NEPAD) of the AU, with funding from the African Development Bank. The route is Trans Africa Highway No. 7 (TAH7) in the International Road Federation's list of nine highways which it regards as priorities for a Trans-Africa Highway network.[4] RouteThe cities and countries served, and status of the road are as follows. Information about construction required is from two sources: the ECOWAS website,[5] undated document, and the ADB website, consultancy report date August 2003.[2] Note: 'spur' indicates the city is on a spur off the main alignment of the highway, 'existing' could mean a pre-existing national road has been adopted for the route or a section has been newly constructed.
Notes
Feeder roads and other transnational highwaysBamako, Mali and Ouagadougou, Burkina Faso (the two landlocked countries of ECOWAS) are already linked to the coastal highway by paved highways to Abidjan, Accra and Lomé. Lagos is linked via the largest network of paved highways in West Africa, the national road network of Nigeria, with links to the neighbouring countries of Niger, Chad and Cameroon. The Trans-Sahelian Highway is another ECOWAS project running parallel to the coastal highway linking the Sahelian countries of West Africa from Dakar to Ndjamena, Chad.[4] Two other transnational roads are also under development from Lagos to link to the Trans–West African Coastal Highway:[4]
See also{{Portal|Africa}}
References1. ^1 [https://www.un.org/ecosocdev/geninfo/afrec/vol20no3/203-highways.html Itai Madamombe (2006): "NEPAD promotes better transport networks".] Africa Renewal, Vol.20 No 3 (October 2006), page 14. {{Trans-African Highway network}}{{DEFAULTSORT:Trans-West African Coastal Highway}}2. ^1 2 3 {{cite web |url= http://www.afdb.org/pls/portal/docs/PAGE/ADB_ADMIN_PG/DOCUMENTS/NEPAD_INFORMATION/TAH_FINAL_VOL2.PDF|title= Volume 2: Description of Corridors|accessdate=2007-07-14 |author= |date= 2003-08-14|work= Review of the Implementation Status of the Trans African Highways and the Missing Links|publisher= African Development Bank|format= PDF |archiveurl = https://web.archive.org/web/20070128052858/http://www.afdb.org/pls/portal/docs/PAGE/ADB_ADMIN_PG/DOCUMENTS/NEPAD_INFORMATION/TAH_FINAL_VOL2.PDF |archivedate = 2007-01-28}} 3. ^{{cite news| url = http://businessdayonline.com/NG/index.php/homes-a-property/52211-why-construction-work-may-delay-on-lagos-badagry-expressway| title = Why construction work may delay on Lagos-Badagry Expressway| publisher = Business Day Nigeria| author = Odinaka Mbonu| date = 2013-02-26| page =| location =| isbn =| accessdate = 2013-06-15| quote = The expansion of the expressway started about three years ago with the phase one almost completed. However, work on the second phase stretching from Maza-Maza to Agboju has progressed at a slow speed, causing motorists and residents who ply the road regularly so much pain, and with no tangible alternative in sight at the moment.}} 4. ^1 2 Eugene Chukwunwike Onyeka (2006): "Contributions of Surveying in the Development of Regional Infrastructures – An African Perspective." Shaping the Change: XXIII International FIG Congress, German INTERGEO, 8 – 13 October 2006. Munich, Germany. 5. ^Achievements of ECOWAS: "Development of Physical Infrastructures for Roads, Telecommunications and Energy" {{Webarchive|url=https://web.archive.org/web/20070711101108/http://www.sec.ecowas.int/sitecedeao/english/achievements-2.htm |date=2007-07-11 }}. No Date. ECOWAS website retrieved 14 July 2007. 3 : Trans-African Highway network|Transport in Africa|Road transport in Africa |
随便看 |
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。