请输入您要查询的百科知识:

 

词条 USS Wassuc (1865)
释义

  1. Design revisions

  2. Fate

  3. References

{{other ships|USS Wassuc|USS Stromboli}}{{Infobox ship image
Ship image=Ship caption=Shawnee and Wassuc laid up at the Boston Navy Yard, circa 1871-72
}}{{Infobox ship career
Hide header=Ship country= United States1875}}Ship name= USS WassucShip namesake=Ship ordered=April 1863Ship builder= George W. Lawrence & Co., Portland, MaineShip laid down=June 1863Ship launched= 25 July 1865Ship completed= 28 October 1865Ship acquired=Ship commissioned= Never commissionedShip decommissioned=Ship in service=Ship out of service=Ship struck=Ship reinstated=Ship homeport=Ship motto=Ship nickname=Ship honours=Ship fate= Sold for scrap, 9 September 1875Ship status=Ship notes=
}}{{Infobox ship characteristics
Hide header=Header caption=Casco|monitorwarship}1175|LT|t|0|abbr=on}}225|ft|m|abbr=on}}45|ft|m|abbr=on}}9|ft|m|abbr=on}}Ship propulsion=Screw steamer9|kn|mph km/h|lk=in}}Ship range=Ship complement=69 officers and enlisted11|in|mm|abbr=on}} smoothbore Dahlgren guns
  • 1 × 150-pounder Parrott rifle
8|in|mm|abbr=on}}
  • Pilothouse: {{convert|10|in|mm|abbr=on}}
  • Hull: {{convert|3|in|mm|abbr=on}}
  • Deck: {{convert|3|in|mm|abbr=on}}
Ship notes=
}}

USS Wassuc — a single-turreted, twin-screw monitor — was built by the George W. Lawrence & Co., Portland, ME, and launched 25 July 1865, and completed 28 October 1865.

Wassuc was a Casco-class, light-draft monitor intended for service in the shallow bays, rivers, and inlets of the Confederacy. These warships sacrificed armor plate for a shallow draft and were fitted with a ballast compartment designed to lower them in the water during battle.

Design revisions

Though the original designs for the Casco-class monitors were drawn by John Ericsson, the final revision was created by Chief Engineer Alban C. Stimers following Rear Admiral Samuel F. Du Pont's failed bombardment of Fort Sumter in 1863. By the time that the plans were put before the Monitor Board in New York City, Ericsson and Simers had a poor relationship, and Chief of the Bureau of Construction and Repair John Lenthall had little connection to the board. This resulted in the plans being approved and 20 vessels ordered without serious scrutiny of the new design. $14 million US was allocated for the construction of these vessels. It was discovered that Stimers had failed to compensate for the armor his revisions added to the original plan and this resulted in excessive stress on the wooden hull frames and a freeboard of only 3 inches. Stimers was removed from the control of the project and Ericsson was called in to undo the damage. He was forced to raise the hulls of the monitors under construction by 22 inches to make them seaworthy.

Fate

Therefore, the Navy Department ordered on 24 June 1864 that Wassuc's deck be raised to provide sufficient freeboard. Upon delivery, the monitor was laid up at the Boston Navy Yard; and she saw no commissioned service. She was renamed Stromboli on 15 June 1869, but resumed the name Wassuc on 10 August 1869. Wassuc was sold for scrapping on 9 September 1875.

References

{{DANFS|http://www.history.navy.mil/research/histories/ship-histories/danfs/w/wassuc.html}}{{Casco class light draft monitor}}{{DEFAULTSORT:Wassuc (1865)}}

3 : Casco-class monitors|Ships built in Portland, Maine|1865 ships

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/25 12:24:13