请输入您要查询的百科知识:

 

词条 Walsall–Wolverhampton line
释义

  1. History

     Early history  Recent history 

  2. Future plans

  3. References

  4. External links

{{for|the former route via Wednesfield|Wolverhampton and Walsall Railway}}{{Infobox rail line
|name =Walsall–Wolverhampton line
| box_width =
|color =
|logo =
|logo_width =
|image = Chase Line.png
|image_width = 250px
|caption = Diagram of the line (in green) in relation to the other railways in the area.
|type =
|system =
|status =
|locale = Wolverhampton
Walsall
West Midlands (region)
|start =
|end =
|stations =
|routes =
|open =
|close =
|owner = Network Rail
|operator =
|character =
|depot =
|stock =
|linelength =
|tracklength =
|gauge = {{RailGauge|sg|allk=on}}
|speed =
|elevation =
|map =
|map_state =
}}{{Walsall-Wolverhampton Line RDT}}

The Walsall–Wolverhampton line is a railway line in the West Midlands, England. It connects the town of Walsall to the city of Wolverhampton. The complete line does not currently have any regular scheduled passenger services: The line's local passenger service was withdrawn in 1965, it was restored in 1998, only to be withdrawn again in 2008. At present, the main use of the line is by freight trains, and it is also used as a diversionary route when engineering works are carried out on the West Coast Main Line.

In 2017, the West Midlands Combined Authority announced that they would restore services to the line over the following decade, with new stations at Willenhall and James Bridge.

History

Early history

Most of the present route was opened in 1837 as part of the original Grand Junction Railway (GJR), one of the first railway trunk routes. Built as a long distance trunk route, the original GJR line did not directly serve either Walsall or Wolverhampton, instead running around the outskirts of both of them. A station on the original line called Wolverhampton was opened at the edge of the town centre, this was later renamed {{rws|Wednesfield Heath}} in 1855 after the centrally located Wolverhampton (High level) station on the Stour Valley Line was opened, Wednesfield Heath was then closed in 1873. A station called Walsall (also known as Bescot Bridge) was also opened, located some distance from the town, this station was closed in 1850, shortly after the present {{rws|Walsall}} station opened on the South Staffordshire Line, it was reopened as {{rws|Wood Green|Wednesbury}}, in 1881 and then closed in 1941.[1]

The GJR amalgamated with other railways to form the London and North Western Railway (LNWR) in 1846. The present line was completed in 1881, when the LNWR constructed two spurs from the GJR at Wolverhampton and Walsall. The Wolverhampton spur diverged south from the original line and linked to Wolverhampton (High Level) station. The spur at the Walsall end diverged north from the GJR and linked to the South Staffordshire Line at Pleck Junction, where it gave access to Walsall station. A station was opened on the Walsall spur called {{rws|Pleck}}, this later closed in 1958.[1]

The line later came under the control of the London, Midland and Scottish Railway and later British Rail in 1948.[1]

The line's strategic use as a freight and diversionary route led to it being electrified with overhead wires in the 1960s, as an offshoot of the West Coast Main Line electrification, along with the connecting Walsall Line. However the local passenger service was withdrawn in 1965 as part of the Beeching Axe, and the line's remaining intermediate stations at {{rws|Darlaston James Bridge}} and {{rws|Willenhall}} were closed.[1]

Recent history

A passenger service was reintroduced 1998, however this was not a success and was withdrawn again in 2008. The service, which was funded by Centro and operated by Central Trains (later London Midland), operated hourly, and was reintroduced to the line on 24 May 1998. However, in 2005 the Strategic Rail Authority proposed the withdrawal of the service, citing low passenger numbers and a lack of rolling stock.[2][6] Centro opposed this, and the service was given a temporary reprieve. There were also proposals to reopen the stations at {{stnlnk|Willenhall Bilston Street}} and {{stnlnk|Portobello|Wolverhampton}} to increase passenger numbers and the viability of the service. During the early-mid 2000s, the line was used as part of an hourly service between Walsall and Wellington. But these services were withdrawn in 2006 and the service was reduced to an hourly service between Walsall and Wolverhampton, with only one or two trains per day in each direction extending to Wellington in the early morning and late at night.

It was announced in July 2008 that the government was withdrawing funding for this service,[3] and as a result the local service was mainly withdrawn as of December 2008. However the line remains open for freight trains, and the section between Wolverhampton and Darlaston Junction continues to be used by certain trains between Birmingham and Wolverhampton, and will also be used as a diversionary route when the West Coast Main Line is closed for engineering works. Between 2008–2011 this section was also used by the now defunct Wrexham & Shropshire passenger services to London.

The full service was withdrawn on 13 December 2008, although there is still a 'Parliamentary train' – initially, one train per day ran directly from Walsall to Wolverhampton on weekdays, leaving Walsall at 19:36, but this was replaced in the 19 May 2013 timetable by a Saturdays-only train from Wolverhampton to Walsall leaving Wolverhampton at 06:38.[4] Centro still have ambitions to reinstate the service and reopen stations at {{rws|Willenhall Bilston Street}} and Portobello, but its plans have been put on hold until the next West Midlands franchise award is made in 2016-17.[5]

A service calling at all stations via Birmingham New street now operates, taking over 1 hour, compared with 12 minutes for the direct service, and London Midland advise passengers to use the National Express West Midlands 529 bus instead.[6]

Future plans

The West Midlands Combined Authority have announced their intention to restore a passenger service to the line by 2021, along with new stations at Willenhall and Darlaston James Bridge.[7][8]

In August 2018, the West Midlands Combined Authority had secured land for the proposed Darlaston. The proposed timetable for the line would be an hourly Wolverhampton to Walsall service as well as a hourly Wolverhampton to Birmingham service calling at Willenhall, Darlaston and {{rws|Tame Bridge Parkway}}. [9]

It is currently planned that the line will reopen to passengers in December 2021.[10]

References

1. ^{{cite book|last1=Boynton|first1=John|title=Rails Around Walsall|date=1996|publisher=Mid England Books|isbn=0-9522248-3-6}}
2. ^{{cite web|title=Walsall-Wolverhampton TRAINS|url=http://www.freewebs.com/southstaffsrailway/walsallwolverhampton.htm|website=South Staffs Railway|accessdate=13 March 2015}}
3. ^{{cite web|title=Funding for rail service removed|url=http://news.bbc.co.uk/1/hi/england/west_midlands/7524773.stm|website=BBC News|publisher=BBC|accessdate=13 March 2015|date=25 July 2008}}
4. ^GB National Rail timetables December 2012, May 2013 & May 2016 Editions, Table 70
5. ^[https://www.expressandstar.com/news/transport-news/2012/10/20/plans-to-reopen-rail-line-are-put-on-hold/ "Plans to reopen rail line are put on hold"]Express & Star news article 20 October 2012; Retrieved 24 May 2016
6. ^{{Cite web|title=Fight to save under threat rail service|url=http://icwalsall.icnetwork.co.uk/news/localnews/tm_headline=fight-to-save-under-threat-rail-service&method=full&objectid=21326888&siteid=60240-name_page.html |archiveurl=https://web.archive.org/web/20120213192621/http://icwalsall.icnetwork.co.uk/news/localnews/tm_headline=fight-to-save-under-threat-rail-service&method=full&objectid=21326888&siteid=60240-name_page.html|date=2008-07-11 |archivedate=13 February 2012 |accessdate=2008-07-16|publisher=Walsall Observer}}
7. ^{{cite web|title=£4 billion of transport infrastructure over coming decade|url=https://westmidlandscombinedauthority.org.uk/news/4-billion-of-transport-infrastructure-over-coming-decade/|publisher=West Midlands Combined Authority|accessdate=23 July 2016}}
8. ^{{cite web|title=West Midlands Strategic Transport Plan|url=https://www.tfwm.org.uk/strategy/movement-for-growth/|accessdate=11 September 2017}}
9. ^RAIL Issue 860 p.15
10. ^[https://www.expressandstar.com/news/local-hubs/walsall/darlaston/2019/02/28/trains-could-be-running-directly-between-walsall-and-wolverhampton-by-2021/]

External links

  • Walsall Transport strategy
  • London Midland website
  • BBC Black Country: Have your say on the rail line closure
{{Railway lines in the West Midlands}}{{DEFAULTSORT:Walsall-Wolverhampton line}}

3 : Rail transport in Wolverhampton|Rail transport in Walsall|Railway lines in the West Midlands (region)

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/10 17:07:34