{{Infobox dam
| name =Badush Dam
| image =
| image_size =
| image_caption =
| location_map = Iraq
| coordinates = {{coord|36|28|00|N|42|57|59|E|region:IQ_type:landmark_scale:100|display=inline,title}}
| name_official =
| location = Badush, Ninawa Governorate, Iraq
| operator = Ministry of Water Resources
| dam_length ={{convert|3730|m|abbr=on}}
| dam_height ={{convert|102|m|abbr=on}}
| dam_type = Gravity with earthen sections
| dam_crosses = Tigris River
| dam_elevation_crest =
| dam_width_crest =
| dam_width_base =
| dam_volume = {{convert|6100000|m3|cuyd|abbr=on}}
| construction_began =1988
| opening =
| status =Unfinished
| cost =
| res_name =
| res_capacity_total = {{convert|10000000000|m3|acre.ft|abbr=on}} @ {{convert|307|m|abbr=on}}
| res_capacity_active =
| res_capacity_inactive=
| res_catchment =
| res_surface =
| res_max_length =
| res_max_width =
| res_max_depth =
| res_elevation =Normal: {{convert|245.5|m|abbr=on}}
Flood: {{convert|307|m|abbr=on}}
| spillway_count =
| spillway_type =
| spillway_capacity = {{Convert|4000|m3/s|ft3/s|abbr=on}}
| plant_turbines = 4 x 42.5 MW Kaplan-type
| plant_capacity = 170 MW
| plant_hydraulic_head = {{convert|100|m|abbr=on}} (net)
| extra =
}}

The Badush Dam is an unfinished multi-purpose dam on the Tigris River, located near Badush, {{convert|16|km}} northwest of Mosul in the Ninawa Governorate, northern Iraq.

If completed, the dam's designed main purpose is to provide protection from a failure of the unstable Mosul Dam upstream. In addition, the hydroelectric power station would have an installed capacity of 170 MW and the dam would further regulate tailwaters from Mosul Dam.[1]

History

In response to concerns over Mosul Dam's karst foundation, Iraqi's Ministry of Irrigation began construction in 1988. Works on the dam ended in 1991 due to economic sanctions against Iraq.[1] Other problems troubled construction as well, particularly lethal gas exhalation. Significant construction on the dam along with the hydro-power unit housing had occurred. The dam is roughly 40 percent complete.[1]

Current project

Concerns over the stability of the Mosul Dam significantly contributed to recent efforts to restart construction of the Badush Dam, and possibly expand it as well.

As early as December 2005, Iraq's Ministry of Water Resources was developing a project to restart construction on the dam. Currently, it would cost about US$300 million to complete the initial design but the Government of Iraq is wary of spending an additional US$10 billion to expand the dam's size in order to help mitigate a potential failure of the Mosul Dam.[2]

The current project contains a main earth-fill dam with an inclined clay core and other random fills, two saddle dams (earth-fill dams) at the left bank and a {{convert|240|m|adj=on}} concrete dam (hollow buttress type) at the right bank. The concrete dam includes eight bottom outlets, a spillway and four power intakes and conduits, a stilling basin, headrace and tailrace channels. There is a power house, close to the concrete dam. The Badush Dam's spillway will have a maximum output of {{convert|4000|m3/s}}; each hydro-power unit will have a capacity of {{convert|275|m3/s}} for a total of {{convert|1100|m3/s}}. The bottom outlets, power station and spillway combined afford a discharge capacity of {{convert|13100|m3/s|ft3/s|abbr=on}}[3]

The normal reservoir level is {{convert|245.5|m|abbr=on}} above sea level and the maximum level is {{convert|307|m|abbr=on}}. The {{convert|61.5|m|abbr=on}} allowance between the normal and maximum is for flood protection from a Mosul Dam collapse. At its maximum level the Badush reservoir can hold {{convert|10000000000|m3|acre.ft|abbr=on}}, enough to absorb and pass a Mosul Dam wave, according to a wave study.[1][4][5]

References

1. ^{{cite journal|author1=Nadhir Al-Ansari|author2=Nasrat Adamo|author3=Issa E. Issa|author4=Varoujan K. Sissakian|author5=Sven Knutsson|title=Mystery of Mosul Dam the Most Dangerous Dam in the World: Dam Failure and its Consequences|journal=Journal of Earth Sciences and Geotechnical Engineering|date=2015|volume=5|issue=3|page=106|url=http://pure.ltu.se/portal/files/102425643/Vol_5_3_8.pdf|accessdate=12 February 2016|publisher=Scienpress Ltd|issn=1792-9660}}
2. ^>https://www.washingtonpost.com/wp-dyn/content/article/2007/10/29/AR2007102902193.html?hpid=topnews Washington Post Dam in Danger of Collapse
3. ^http://www.medingegneria.it/files/download/BADUSH.pdf {{Webarchive|url=https://web.archive.org/web/20110722041856/http://www.medingegneria.it/files/download/BADUSH.pdf |date=2011-07-22 }} MED Project Badush Dam - Direct Reference)
4. ^{{cite web|title=Dams, HPPs, WTPs Experience|url=http://brane-hpp-wtp.com/doc/BHW-Prof.pdf|publisher=Branes|accessdate=12 February 2016}}
5. ^{{cite journal|author1=Aqeel Al-Adili|author2=Saleh Khasaf|author3=Aws Ajaj|title=Hydrological Impacts of Iraqi Badush Dam on Groundwater|journal=International Water Technology Journal|date=June 2014|volume=4|issue=2|page=93|url=http://iwtj.info/wp-content/uploads/2014/07/V.4_N.2_P.2.pdf|accessdate=12 February 2016}}

External links

{{stack|{{Portal|Iraq|Water|Renewable energy}}}}{{Tigris}}{{Tigris dams}}

6 : Dams in Iraq|Dams on the Tigris River|Hydroelectric power stations in Iraq|Nineveh Governorate|Geography of Iraqi Kurdistan|Proposed dams

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/23 7:29:00