请输入您要查询的百科知识:

 

词条 Batu Caves Komuter station
释义

  1. History

  2. Around the station

  3. See also

  4. References

{{Infobox station
| name = {{KLRT color code|KC|05}}
Batu Caves
{{rint|my|KTM}} {{rint|my|ktmkomuter}}
| other_name = 黑风洞 (Chinese)
பத்து மலை (Tamil)
| type = Commuter rail station
| image = Batu Caves Komuter station - Station board.jpg
| image_caption =
| address = Batu Caves, Gombak, Selangor, Malaysia.
| coordinates = {{coord|3|14|16.1|N|101|40|52.2|E|type:railwaystation_region:MY}}
| owned = Keretapi Tanah Melayu
| line = {{rint|my|1}} {{KLRT lines|1}} (KTM Komuter)
| platform = 2 side platform
| tracks = 4
| other =
| parking = Available with payment
| bicycle =
| ADA = Available
| code = {{KLRT color code|KC|05}}
| zone =
| opened = 1905
| rebuilt = April 2010
| electrified = April 2010
| mpassengers =
| passengers =
| pass_system =
| pass_year =
| pass_percent =
| services = {{s-rail|title=KTM Komuter}}{{s-line|system=KTM Komuter|line=Seremban Line|previous=|next=Taman Wahyu}}
| logo =
| logo_size =
| image_size =
| baggage_check =
}}

Batu Caves Komuter station is a Malaysian commuter railway station formerly known as Batu Caves Railway station at Batu Caves, Gombak District, Selangor, Malaysia. After redevelopment, the station was reopened in August 2010. The station was from 2010 the northern terminus for the KTM Komuter's Batu Caves-Port Klang Route until December 2015 when the Seremban Line routing was changed to terminate at this station instead of Rawang.

History

The Batu Caves railway station was constructed on 1 November 1905. Over the years, the station fell into a poor condition through neglect and lack of use. The line between Sentul and Batu Caves was not included in the double-tracking and electrification of the line between Kuala Lumpur and Sentul under the Sixth Malaysia Plan (1990-1995). Since then, the station has been rebuilt and the line electrified. The existing single railway track between Sentul to Batu Caves was doubled, and new stations and halts built, including {{KLRT code|KC|04}} Taman Wahyu, {{KLRT code|KC|03}} Kampung Batu, and {{KLRT code|KC|02}} Batu Kentonmen. This project was scheduled to start before 2001, with DRB-Hicom Berhad as a contractor. The letter of intent was issued by the Transport Ministry to the company on 13 April 2001.[1] However, no letter of award was issued and there was no progress until 17 November 2006 when site possession was given to contractor YTL Corporation. The project was expected to be completed by April 2010.[2] and new station opened in August 2010.

Around the station

  • Batu Caves

See also

  • Rail transport in Malaysia

References

1. ^{{cite web |publisher= Malaysian Stock Exchange |url= http://announcements.bursamalaysia.com/EDMS/annweb.nsf/LsvAllByID/482568AD00295D0748256C160033C7C4?OpenDocument |title= Bursa Malaysia reply to query on article entitled: "DRB-HICOM, Emrail on track for more jobs" |date= 15 August 2002 |access-date= 2009-11-21 |archive-url= https://web.archive.org/web/20090712031253/http://announcements.bursamalaysia.com/EDMS/annweb.nsf/LsvAllByID/482568AD00295D0748256C160033C7C4?OpenDocument |archive-date= 2009-07-12 |dead-url= yes |df= }}
2. ^{{cite web |title= Landasan Berkembar Elektrik Sentul-Batu Caves (Sentul-Batu Caves double tracking and electrification) |url= http://www.ktmb.com.my/article.asp?id=1995 |date=n.d. |accessdate=14 June 2007 |archiveurl= https://web.archive.org/web/20070927062032/http://www.ktmb.com.my/article.asp?id=1995 |archivedate= 27 September 2007 |language=Malay |publisher=KTMB}}
{{commons category|Batu Caves Railway Station}}{{Klang Valley train stations}}{{coord|3|14|16|N|101|40|52|E|region:MY_type:railwaystation_source:kolossus-jawiki|display=title}}

3 : Railway stations in Kuala Lumpur|Rapid transit stations in Kuala Lumpur|Seremban Line

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/23 7:34:16