词条 | Beckjord Power Station | ||||||||||||||||||||||||||||||||||||||||||||
释义 |
|name = Beckjord Generating Station |image = BeckjordPowerStation.JPG |image_caption = |location = Pierce Township, Clermont County, near New Richmond, Ohio | coordinates = {{coord|38|59|31.5|N|84|17|50|W|display=title,inline}} |owner = Duke Energy American Electric Power Dayton Power & Light |operator = Duke Energy |status = D |th_fuel_primary = Coal Oil |ps_cooling_source = Ohio River |th_technology = |ps_combined_cycle = |ps_electrical_capacity= 1,433 |commissioned = Unit 1: 1952 Unit 2: 1953 Unit 3: 1954 Unit 4: 1958 Unit 5: 1962 Unit 6: 1969 Units GT1–GT4: 1972 |decommissioned = Unit 1: 2012 Units 2–3: 2013 Units 4–6: 2014 Units GT1–GT4: 2014 }} The Walter C. Beckjord Generating Station was a 1.43-gigawatt (1,433 MW), dual-fuel power generating facility located near New Richmond, Ohio, 22 miles east of Cincinnati, Ohio. The plant began operation in 1952 and was decommissioned in 2014. It was jointly owned by Duke Energy, American Electric Power (AEP), and Dayton Power & Light (DP&L).[1] BackgroundOf the two Beckjord power plants, one was coal-fired (Units 1–6) and the other was oil-fired (Units GT1–GT4).[2][3] It was originally built by Cinergy (originally Cincinnati Gas and Electric Company (CG&E)), which was bought by Duke Energy in 2006. The plant is named after Walter C. Beckjord, the chairman of CG&E from 1957 to 1962.[4] CG&E installed new electrostatic precipitators at Beckjord in the 1970s to reduce pollution mandated by the State of Ohio.[5]
Closure and decommissioningIn July 2011, Duke Energy announced that Beckjord would shut down in January 2015 because of tightening environmental regulations from the Environmental Protection Agency (EPA) outweighed the benefits of retrofitting the plant.[9] The shut down was accelerated to November 2014 after an open valve caused an oil spill into the Ohio River the previous August.[4][10] Duke Energy plead guilty in federal court in 2016 for spilling 9,000 gallons of diesel fuel into the Ohio River. The company was fined $1 million for the spill.[10] In 2015, Duke Energy installed a battery-based energy storage system at the site for the purpose of regulating frequency in the electric grid.[11] As a part of the decommissioning process, Duke Energy terminated their lease with the New Richmond Soccer Association who played soccer matches adjacent to Beckjord.[12] Duke Energy and its co-owners, AEP and DP&L, agreed to sell Beckjord and adjacent lands to Commercial Liability Partners for an undisclosed amount in February 2018. Commercial Liability Partners will repurpose the brownfields for redevelopment.[1] See also{{Portal|Ohio|Energy}}
References1. ^1 {{cite news|url=https://www.cincinnati.com/story/money/2018/02/27/duke-energy-joint-owners-sell-retired-coal-fired-plant-new-richmond/376061002/|title=Duke Energy, joint owners sell retired coal-fired plant in New Richmond|work=Associated Press|publisher=Cincinnati.com|date=February 27, 2018|accessdate=February 27, 2018}} {{US-powerstation-stub}}2. ^{{cite web| title = Beckjord Station (Coal)| work = | publisher = Duke Energy| year = | url = http://www.duke-energy.com/power-plants/wholesale/beckjord-coal.asp| format = | doi = | accessdate = 2008-07-14| archiveurl= https://web.archive.org/web/20080719182153/http://www.duke-energy.com/power-plants/wholesale/beckjord-coal.asp| archivedate= 19 July 2008 | deadurl= no}} 3. ^{{cite web| title = Beckjord Station (Oil)| work = | publisher = Duke Energy| year = | url = http://www.duke-energy.com/power-plants/wholesale/beckjord-oil.asp| format = | doi = | accessdate = 2008-07-14| archiveurl= https://web.archive.org/web/20080720130741/http://www.duke-energy.com/power-plants/wholesale/beckjord-oil.asp| archivedate= 20 July 2008 | deadurl= no}} 4. ^1 {{cite news|url=https://www.cincinnati.com/story/money/2014/08/29/beckjord-plant-shutting-monday/14839437/|title=Beckjord plant shutting down|work=Cincinnati.com|publisher=The Cincinnati Enquirer|date=November 22, 2014|accessdate=October 25, 2017}} 5. ^{{cite news|title=Pollution: Take heart–we're actually gaining on the stuff|last=Bode|first=Patricia|publisher=Cincinnati Magazine|date=September 1972|page=65}} 6. ^{{cite web | title = Existing Electric Generating Units in the United States, 2006 | work = | publisher = Energy Information Administration, U.S. Department of Energy| year = 2006| url = http://www.eia.doe.gov/cneaf/electricity/page/capacity/capacity.html| format = Excel| doi = | accessdate = 2008-07-14| archiveurl= https://web.archive.org/web/20080616150236/http://www.eia.doe.gov/cneaf/electricity/page/capacity/capacity.html| archivedate= 16 June 2008 | deadurl= no}} 7. ^{{cite web|title=W.C. Beckjord Station Retirement Plans|url=https://www.duke-energy.com/beckjord/}} 8. ^{{cite web|title=PJM Generator Deactivation Summary Sheets|url=http://www.pjm.com/planning/generation-deactivation/gd-summaries.aspx}} 9. ^{{cite news|url=http://www.wcpo.com/news/region-east-cincinnati/duke-energy-to-close-beckjord-power-plant-in-clermont-county|title=Duke Energy to close Beckjord Power Plant in Clermont County|last=Warren|first=Jay|publisher=WCPO-TV|date=July 18, 2011|accessdate=October 25, 2017}} 10. ^1 {{cite news|url=https://www.cincinnati.com/story/news/2016/11/22/94266774/|title=Duke Energy apologizes for 2014 Ohio River diesel spill|last1=Smith|first1=Carrie Blackmore|last2=Brennan|first2=Patrick|work=Cincinnati.com|publisher=The Cincinnati Inquirer|date=November 22, 2016|accessdate=October 25, 2017}} 11. ^{{cite web|title=Duke Energy, LG Chem, Greensmith commission fast-response energy storage system in Ohio|url=http://news.duke-energy.com/releases/batteries-spring-to-life-at-retired-duke-energy-coal-plant}} 12. ^{{cite news|url=http://clermontsun.com/2016/06/08/new-richmond-youth-soccer-searching-for-new-home/|title=New Richmond youth soccer searching for new home|last=Shanklin|first=Garth|publisher=The Clermont Sun|date=June 8, 2016|accessdate=October 25, 2017}} 11 : Energy infrastructure completed in 1952|Energy infrastructure completed in 1953|Energy infrastructure completed in 1954|Energy infrastructure completed in 1958|Energy infrastructure completed in 1962|Energy infrastructure completed in 1969|Energy infrastructure completed in 1972|Buildings and structures in Clermont County, Ohio|Former coal-fired power stations in Ohio|Former oil-fired power stations in the United States|Duke Energy |
||||||||||||||||||||||||||||||||||||||||||||
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。