词条 | Bolueta (Metro Bilbao) |
释义 |
| name = Bolueta | type = | style = | image = Metro Bilbao Bolueta Station Trains.jpg | image_caption = Two metro units at Bolueta | address = Camino Ibarsusi, 2A 48004 Bilbao | country = Spain | coordinates = {{coord|43.2470|-2.9058|type:railwaystation_region:ES|display=inline,title}} | line = Metro Bilbao: Euskotren Trena: | other = Bus | structure = Elevated station | platform = 4 side platforms | depth = | levels = 2 | tracks = 4 | parking = No | bicycle = | baggage_check = | opened = 5 July, 1997 | closed = | rebuilt = | electrified = | ADA = yes | code = | owned = Euskal Tranbide Sarea (ETS) | zone = {{CTB|1}} | former = | passengers = | pass_year = | pass_percent = | pass_system = | mpassengers = | services = | map_locator = | web = }} Bolueta is a railway station in Bilbao, Basque Country. It serves as a station for the line 1 and line 2 of Metro Bilbao. It connects the underground railway with the commuter trains of Euskotren Trena lines 1D (Durangaldea line to Durango) and E4 (Urdaibai line from Bilbao to Bermeo). The station is located in the neighbourhood of Bolueta in the district of Begoña in Bilbao. It was opened in 1997. Station layoutBolueta station serves as a connection station between Metro Bilbao and Euskotren Trena, and it was the second station of the entire metro network to offer such a connection when it opened in 1997 after Zazpikaleak/Casco Viejo station. There is a common covered hall that allows access to both services. The Metro Bilbao section of the station is elevated with two side platforms, while the Euskotren Trena platforms are located at-level with two side platforms as well. The station can be accessed from Otxarkoaga and Ibarsusi streets. In 2012 a new access was opened from Telleria street, including an elevator for people with low mobility. Access
ServicesRail servicesWhen the station was opened in 1997, the station served as the only connection between the Metro Bilbao network and the Euskotren Trena lines to the cities of Bermeo, Durango, Eibar and San Sebastián. All the Euskotren Trena lines that had Bilbao-Atxuri station as a terminus stopped at Bolueta, including the former lines 1, 1D and 3, with a train every 30 minutes in either direction.[1] After the opening of Metro Bilbao's Line 3, operated by Euskotren Trena, the trains coming from all destinations except Bermeo were rerouted through the new underground route that connects directly with Zazpikaleak/Casco Viejo station in central Bilbao, bypassing Bolueta and Atxuri stations completely.[2] Currently there are only two railway services serving at the station; line 1D (Durangaldea line) connecting Bilbao-Atxuri with Durango and Abadiño as an express service with special trains during the morning, and line E4 (Urdaibai line) to Amorebieta-Etxano, Gernika and Bermeo, with a frequency of one hour. {{s-start|noclear = y}}{{s-note|text=Euskotren Trena }}{{Rail line|previous=Bilbao-Atxuriterminus|next=Kukullaga toward Bermeo or Gernika|route= Line E4|col=2C2664}}{{Rail line|previous=Bilbao-Atxuri terminus|next=Kukullaga toward Durango or Traña-Abadiño|route= Line 1D|col=27AAE2}}{{s-end}} Metro services{{s-start|noclear=yes}}{{s-rail|title=Metro Bilbao}}{{s-line|system=Metro Bilbao|line=1|next=Etxebarri|previous=Basarrate}}{{s-line|system=Metro Bilbao|line=2|next=Etxebarri|previous=Basarrate}}{{s-end}}Bus servicesIn close proximity to the station there are bus stops for Bilbobus line 30 running to Begoña, Abando and Ibaiondo as well as several Bizkaibus lines running to Galdakao and Leioa (A2610), Ugao-Miraballes (A3613), Basauri and Zaratamo (A3622) and Artea (A3928). FutureAfter the opening of the Zazpikaleak/Casco Viejo station for Euskotren Trena, most commuter trains coming from inner Biscay and Gipuzkoa were diverted toward the newer, more centric station, in consequence leaving Bolueta station with little commuter rail traffic. While the original operational plan for Euskotren Trena involved the diversion of all E4 trains coming from Gernika and Bermeo to the new station in early 2018, the changes were delayed at least until 2019 to avoid leaving the commuter rail section of the station without any services, which in turn would also affect Bilbao-Atxuri station.[3] The Basque Government and the administration of the rail network, Euskal Trenbide Sarea (ETS), announced in 2003 the intention of transforming the rail road section between Bilbao-Atxuri, Bolueta and Etxebarri into a tramway line, thus continuing the existing Bilbao tramway service which currently has its terminus at Bilbao-Atxuri, however not many actions have been taken towards this objective. In early 2017 the plan was brought back by the administration and some studies were conducted[4] In November 2018 it was announced by the Basque Government that the works to transform the lower level of Bolueta station into a tram stop while maintaining the connection with Metro Bilbao would start in 2019.[5] It is expected to be finished in 2021. References1. ^Old Euskotren Schedules (Official Website) Liste des stations du métro de Bilbao#Tronc commun L1 et L22. ^{{cite news |last=Díaz |first=Manuela |date=19 June 2017 |title=We lose time and money with the new Line 3 connection. |url=https://www.elcorreo.com/bizkaia/duranguesado/201706/20/conexion-tren-durango-linea-20170619213701.html |work=El Correo |location= |access-date=16 September 2018}} 3. ^{{cite news |last=Alonso |first=Alberto G. |date=14 May 2018 |title=Trains coming from Bermeo will not divert to Line 3 until 2019 |url=http://www.deia.eus/2018/05/14/bizkaia/los-trenes-desde-bermeo-no-entraran-por-la-linea-3-del-metro-hasta-2019 |work=Deia |location= |access-date=19 September 2018}} 4. ^{{cite news |last=Pérez |first=Leire |date=21 March 2017 |title=The tramway between Atxuri and Etxebarri starts moving |url=https://www.elcorreo.com/bizkaia/201703/21/tranvia-entre-atxuri-etxebarri-20170320224218.html |work=El Correo |location=Bilbao |access-date=19 September 2018}} 5. ^{{cite news |last=Alonso |first=Alberto G. |date=21 November 2018 |title=The construction of the Atxuri-Bolueta tram line will start in a year |url=https://www.deia.eus/2018/11/21/bizkaia/bilbao/las-obras-del-tranvia-de-atxuri-a-bolueta-comenzaran-en-un-ano |work=Deia |location=Bilbao |access-date=26 November 2018}} 3 : Euskotren Trena stations|Metro Bilbao stations|Railway stations opened in 1997 |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。