词条 | Cannelton Locks and Dam |
释义 |
| name = Cannelton Locks and Dam | name_official = | image = Cannelton_Locks_Dam.jpg | image_size = | image_caption = | image_alt = | location_map = | location_map_size = | location_map_caption = | location_map_alt = | country = | location = Perry County, Indiana / Hancock County, Kentucky US | purpose = | status = O | construction_began = July 1963 | opening = {{Start date|1966|12}} | demolished = | cost = $98 million ($763 million with inflation) | owner = United States Government | operator = US Army Corps of Engineers | dam_type = Concrete fixed weir with tainter gate | dam_crosses = Ohio River | dam_height = {{convert|42|ft}} | dam_height_foundation= | dam_height_thalweg = | dam_length = {{convert|1827|ft}} | dam_elevation_crest = | dam_width_crest = | dam_width_base = | dam_volume = | spillway_count = | spillway_type = 12 tainter gate | spillway_capacity = | res_name = | res_capacity_total = | res_capacity_active = | res_capacity_inactive= | res_catchment = | res_surface = | res_max_length = | res_max_width = | res_max_depth = | res_elevation = | res_tidal_range =
The Cannelton Locks and Dam is a concrete fixed weir dam with two locks on the Ohio River, on the border between the U.S. states of Indiana and Kentucky. The dam is {{convert|2|mi|km}} southeast of Cannelton, Indiana. Construction of the locks began in July 1963. The locks began operation in December 1966 and were completed April 1967. Construction on the dam started in August 1965 and the dam was completed in 1974. The structure was designed, built, and is operated by the United States Army Corps of Engineers Louisville District.[1][2] DamThe Cannelton Dam is located at river mile 720.7 (measured from Pittsburgh, Pennsylvania) and has two sections. The main section is {{convert|1412|ft|m}} long with twelve tainter gate. The gates are held between {{convert|15|ft|m|adj=mid|-wide}} piers. Each gate is {{convert|42|ft|m}} high and {{convert|100|ft|m}} long. Electric hoists on top of the piers are used to raise or lower the gates. At the end of the gated section of the dam there is second section, a concrete fixed weir on the Kentucky side of the river. The weir is {{convert|195|ft|m}} long. LocksThe Cannelton Locks run parallel to each other on the Indiana side of the river. There are two locks alongside the dam, the main lock which measures {{convert|110|ft|m}} by {{convert|1200|ft|m}} and the auxiliary lock that is {{convert|110|ft|m}} by {{convert|600|ft|m}}. The locks can be filled or emptied in around 8 minutes. The upper pool is normally at an elevation of {{convert|383.0|ft|m}}, mean sea level and the lower pool elevation is {{convert|358.0|ft|m}}, mean sea level. The lift (difference) between the two pool is {{convert|25|ft|m}}. {{convert|25|e6USgal|m3}} of water is required to operate the lock.The locks reduce travel time because it enables large commercial tows to go through only one lockage rather than the three locks it replaced. Also the large lock chamber allows a large vessels to pass through the lock in a single operation instead of using smaller lock sections. Authorization and constructionOn January 27, 1960, the project was approved by Secretary of the Army, Wilber Marion Brucker. Under the authority of Section 6 of the Rivers and Harbors Act, approved March 3, 1909, the existing Locks 43, 44 and 45 were replaced.[3] The construction of the locks began in July 1963. The locks began operation in December 1966 and were completed April 1967. Construction on the dam started in August 1965 and the dam was completed in 1974. The structure was designed, built, and is operated by the United States Army Corps of Engineers Louisville District. There were {{convert|128|acre|km2}} of overlook property that was initially built during the construction project. In 1995, the property was excessed to the United States Fish and Wildlife Service for use as a wildlife habitat. Hydroelectric powerAmerican Municipal Power (AMP) is currently outfitting the dam to divert water to three bulb turbines to generate an average gross annual output of approximately 458 million kilowatt-hours (kWh). The project includes the construction of an intake approach channel, a concrete powerhouse, and a tailrace channel. The powerhouse will contain three horizontal 28 MW bulb-type turbine and generating unit with total rated capacity of 84 MW at a gross head of {{convert|25|ft|m}}. Construction began in 2009. Excavation and cofferdam construction was completed in 2010. Powerhouse construction began in 2011. All concrete work on the powerhouse has been completed and work has begun on the interior. The project that will cost an estimated $416 million.[4][5] Highway
See also
References1. ^United States Army Corp of Engineers - Cannelton 2. ^Perry County Indiana 3. ^{{cite web|title=Cannelton Locks and Dam|url=http://www.lrl.usace.army.mil/Missions/CivilWorks/Navigation/LocksandDams/CanneltonLocksandDam.aspx|publisher=US Army Corps of Engineers|work=Louisville District|accessdate=29 March 2016}} 4. ^{{cite web|title=American Municipal Power: The Cannelton Hydroelectric Project|url=http://www.amppartners.org/generation/hydro/cannelton-hydro-project|accessdate=30 March 2015}} 5. ^{{cite web|title=Hydroelectric dams may offer gateway to Ohio River's power|url=http://www.indianaeconomicdigest.net/main.asp?SectionID=31&ArticleID=60726|accessdate=18 July 2012}} External links
9 : Dams in Indiana|Dams in Kentucky|Buildings and structures in Hancock County, Kentucky|Dams on the Ohio River|Transportation buildings and structures in Perry County, Indiana|Buildings and structures in Perry County, Indiana|United States Army Corps of Engineers dams|Locks of Indiana|Locks of Kentucky |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。