请输入您要查询的百科知识:

 

词条 Central Corridor Rail Line
释义

  1. History

     Previous service  Montrealer and Vermonter  Modern planning 

  2. Rolling stock

  3. Station Listing

  4. References

  5. External links

{{Use mdy dates|date=June 2018}}{{About|a proposed passenger service in New England|other Central Corridors|Central Corridor (disambiguation){{!}}Central Corridor}}{{Infobox rail line
|name = Central Corridor Rail Line
|image = Central Corridor Rail Line.svg
|image_width = 300px
|type = Regional rail
|status = proposed
|locale = New England
|start = New London
|end = Brattleboro
|stations = 10 (8 new; 2 serve other routes)
|gauge = {{RailGauge|ussg}}
|map = {{Central Corridor Rail Line}}
}}

The Central Corridor Rail Line is a proposed passenger service route between New London, Connecticut, and Brattleboro, Vermont. A primary purpose of the proposed service is to provide a rail link between 13 colleges and universities (including the state flagship schools UConn, UMass Amherst, and UVM[1]) as part of the Knowledge Corridor.[2]

Preparing the line for passenger service would require refurbishing the New England Central Railroad tracks, which also carry freight to New London's deepwater port.[3] The northernmost section, in Vermont, has been upgraded to continuously welded rail via a $50 million ARRA grant. New England Central estimates that similar upgrades (which include upgrading the track to standard 286,000 pound car loads) from the Massachusetts / Vermont border to New London would cost $18 million, while the full project including stations and rolling stock would cost $150 million.[1][4]

History

Previous service

The New London, Willimantic, and Palmer Railroad opened from New London, Connecticut to Palmer, Massachusetts in September 1850. It was extended to Amherst in May 1853 by the NLW&P-leased Amherst and Belchertown Railroad, which failed and was reorganized as the Amherst, Belchertown and Palmer in 1858. The New London Northern Railroad acquired the NLW&P (which had failed in 1859) in 1861, and the AB&P in 1864. In 1867, it extended the line north to Millers Falls.[5]

In 1870, the Rutland Railroad leased an 1849-built Vermont and Massachusetts Railroad line from Millers Falls to Brattleboro, Vermont. Originally the V&M mainline, it became a minor branch when the V&M decided to expand west through the Hoosac Tunnel instead. Soon after, the Rutland was taken over by the Vermont Central Railroad, which then leased the NLN in December 1871. The VC collapsed in 1873 and was taken over by the Central Vermont Railway, which continued to lease the NLN.[5]

The Central Vermont became part of the Grand Trunk Railway in 1899, which in turn was nationalized by the Canadian government in 1922. Passenger service on the line ended on September 27, 1947. The line was sold to RailTex in 1995 and operated as the New England Central Railroad.[5] RailTex was merged into RailAmerica in 2000, which in turn was acquired by the Genesee & Wyoming company in 2012.

Montrealer and Vermonter

From its reinstatement in 1989, the overnight Montrealer (the direct predecessor of the Vermonter) ran along the Central Vermont from New London to Brattleboro and beyond. Amherst was at first the only station stop between New London to Brattleboro, which was traversed late at night in both directions; a stop at Willimantic, Connecticut was added in 1991.

After fiscal issues in 1995, the Montrealer was cut back to St. Albans and moved to a daytime schedule as the Vermonter. It was rerouted over the Springfield Line between New Haven and Springfield, and the Boston Subdivision from Springfield to Palmer, Massachusetts. At Palmer the train reversed directions and continued north along the Central Vermont (which was sold to the New England Central Railroad that year).

On December 29, 2014, the Vermonter was rerouted onto the Conn River Line between Springfield and Northfield, Massachusetts after the line received major upgrades. This eliminated the reverse move at Palmer, which will lead to faster service, and added stations at Holyoke, Northampton, and Greenfield; however, it ended direct service to Amherst.

Modern planning

During the building of Foxwoods Casino and Mohegan Sun Casino in the 1990s and 2000s, commuter rail service was considered on the New London to Norwich section of the line to reduce traffic impacts on Route 2.[6] However, upgrades to Route 2 were selected instead.

In October 2012, an excursion train was run to raise support for the project, which has been endorsed by a number of the town governments along the line.[4] In November 2012, officials from Mansfield, New London, Norwich, and Windham (all of which will be served by station stops) plus the Southeastern Connecticut Council of Governments signed an agreement to pursue funding for the service.[7]

In January 2014, it was announced that backers of the line would try to seek federal funding in order to get the line funded. Congressman Joe Courtney is backing the project, along with Connecticut State Senator Cathy Osten.[8] In September 2014, NECR was awarded a $8.2 million TIGER grant for upgrading 55 miles of track in Connecticut; the $10.5 million project is primarily for freight use but is also a prerequisite for any future passenger service.[9]

Rolling stock

Equipment is proposed to be refurbished 1950s Budd Rail Diesel Cars,[10] which are less expensive to operate than conventional locomotive-and-carriage trains on lower-density routes like the Central Corridor. The refurbished RDCs would be capable of operating at speeds up to 80 miles per hour - the FRA limit on track speed on the corridor.[11]

Station Listing

StateCityStationNotes
VermontBrattleboroBrattleboroVermonter stop; connections to CRT and DVTA
MassachusettsMontagueMillers FallsConnection to FRTA
AmherstAmherstFormer Vermonter stop; connection to PVTA
PalmerPalmerConnection to PVTA
ConnecticutStaffordStafford Springs
MansfieldStorrs / Mansfield
WillimanticWillimanticFormer Montrealer stop; Connection to WRTD
NorwichNorwichConnection to SEAT
MontvilleMoheganMohegan Sun casino
New LondonUnion StationConnections to Amtrak, Shore Line East, SEAT

References

1. ^{{cite web |url=http://riarp.org/CCLdocuments/CCLproject.pdf |title=Central Corridor Rail Line |publisher=Rhode Island Association of Rail Passengers |accessdate=February 16, 2011 |deadurl=yes |archiveurl=https://web.archive.org/web/20110727215230/http://riarp.org/CCLdocuments/CCLproject.pdf |archivedate=July 27, 2011 |df= }}
2. ^{{cite news |last=Edgecomb |first=Kathleen |date=October 27, 2010 |url=http://www.theday.com/article/20101027/NWS01/310279888/-1/NWS |title='Visionary planning' looks at rail link to north |newspaper=The Day |accessdate=November 6, 2010}}
3. ^{{cite news |url=http://www.norwichbulletin.com/editorials/x879451610/Our-View-Rail-would-boost-economy |archive-url=https://archive.is/20130131033059/http://www.norwichbulletin.com/editorials/x879451610/Our-View-Rail-would-boost-economy |dead-url=yes |archive-date=January 31, 2013 |title=Our View: Rail would boost economy |date=October 8, 2010 |newspaper=Norwich Bulletin |accessdate=November 6, 2010 }}
4. ^{{cite news |url=http://www.theday.com/article/20121004/NWS01/121009823 |title=All aboard for the Central Corridor line |author=Bessette, Claire |newspaper=The New London Day |date=October 4, 2012 |accessdate=October 5, 2012}}
5. ^{{cite book |title=The Rail Lines of Southern New England |author=Karr, Ronald Dale |publisher=Branch Line Press |year=1995 |isbn=0942147022 |pages=100–104}}
6. ^{{cite web |url=http://www.ct.gov/dot/lib/dot/documents/ddotinfo/FIGURES/S-1.pdf |title=Route 2A/2/32 Environmental Impact Statement: EIS alternatives |publisher=Connecticut Department of Transportation |date=August 18, 2004 |accessdate=January 4, 2012}} (abstract)
7. ^{{cite news |url=http://www.theday.com/article/20111103/NWS01/111109856/1047/nws |title=Towns sign rail expansion agreement |author=Johnson, Jeffery A. |newspaper=The New London Day |date=November 3, 2012 |accessdate=October 5, 2012}}
8. ^{{cite news|last1=Benson|first1=Adam|title=Rail line plan to seek federal funding|url=http://www.norwichbulletin.com/article/20140221/News/140229828|accessdate=September 21, 2014|date=February 21, 2014}}
9. ^{{cite web |url=http://www.dot.gov/sites/dot.gov/files/docs/TIGER14_Project_FactSheets.pdf |title=TIGER 2014 Awards |publisher=U.S. Department of Transportation |date=September 2014 |accessdate=September 16, 2014}}
10. ^Mosher, James (Oct 26, 2010). [https://archive.is/20130130033512/http://www.norwichbulletin.com/casinos/x1471832063/Central-Corridor-train-plan-getting-on-track Central Corridor train plan getting on track]. Norwich Bulletin. Accessed November 6, 2010.
11. ^{{cite web |archiveurl=https://web.archive.org/web/20120320123558/http://riarp.org/CCLdocuments/Summary.pdf |archivedate=March 20, 2012 |url=http://riarp.org/CCLdocuments/Summary.pdf |title=Summary of October 26, 2010 Meeting regarding the Proposed Central Corridor Rail Line |date=October 26, 2010 |publisher=Rhode Island Association of Rail Passengers |accessdate=February 16, 2011}}

External links

  • [https://web.archive.org/web/20140910195850/http://centralcorridorline.com/ The Central Corridor Coalition] (Archived website)
{{Connecticut transit}}

5 : Passenger rail transportation in Connecticut|Proposed railway lines in the United States|Passenger rail transportation in Massachusetts|Passenger rail transportation in Vermont|Proposed railway lines in Massachusetts

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/24 10:27:28