词条 | Changchun–Jilin intercity railway |
释义 |
| box_width = | name = Changchun–Jilin intercity railway {{nobold|{{lang|zh-hans|长吉城际铁路}}}} | color = | logo = ChinaRailwayHighspeed.svg | logo_width = 180px | logo_alt = | image =长吉城际铁路动车组^白城-长春k7302 单双混编高低高 - panoramio.jpg | image_width =300px | image_alt = | caption = Changchun–Jilin intercity railway in Changchun | type = High-speed rail | system = | status = Operational | locale = Jilin | start = Changchun | end = Jilin | stations = 3 | routes = | daily_ridership = | ridership2 = | open = January 11, 2011 | close = | owner = | operator = China Railway High-speed | character = | depot = | stock = | linelength = {{convert|111|km|mi|0|abbr=on}} | tracklength = | tracks = | gauge = {{RailGauge|sg|al=on}} | old_gauge = | load_gauge = | minradius = | racksystem = | routenumber = | electrification = | speed = {{convert|250|km/h|mph|abbr=on}} | elevation = | website = | map = | map_state = collapsed }} Changchun–Jilin intercity railway ({{zh|s=长吉城际铁路 |t=長吉城際鐵路 |p=Cháng-Jí Chéngjì Tiělù}}) is a high-speed rail line operated by China Railway High-speed in Jilin Province, which opened for service on January 11, 2011.[1] It is the first intercity high-speed rail to be operational in Northeast China. Like the Shanghai–Nanjing intercity high-speed railway, which services Shanghai Hongqiao International Airport, the Changchun–Jilin intercity railway serves as an airport rail link for the cities of Changchun and Jilin. SummaryThe line connects, and terminates at, the cities of Changchun and Jilin. The entire line spans {{convert|111|km|abbr=on}} and was built at a cost of RMB 9.6 billion. Construction began on May 13, 2007, and the line was officially open to the public on January 11, 2011. The operational speed of the network is {{convert|250|km/h|abbr=on}}, which means that travel between the two cities now takes about 29 minutes, down from the previous 1.5 hours. The line also services Changchun Longjia International Airport with Longjia Railway Station, which is nine minutes from Changchun station and 22 minutes from Jilin station. StationsThe network has seven stops, of which three are operational, two are scheduled to be operational and two are reserved for future operations. The stations are:
TicketingAll currently{{when|date=April 2013}} operational stations have both manned ticket booths and ticket vending machines. {{As of|2011|6}}, the ticket vending machines can only accept cash (fourth and fifth series renminbi banknotes in denominations ¥5, ¥10, ¥20, ¥50 and ¥100 only, no coins) as payment. References1. ^{{cite web|url=http://www.railwaygazette.com/nc/news/single-view/view/northeast-high-speed-opening.html|accessdate=2011-02-13|title=Railway Gazette: Northeast high speed opening}} {{Changchun–Jilin Intercity Railway}}{{High-speed rail in the People's Republic of China}}{{Regional and commuter rail transit in China}}{{Jilin transit}}{{DEFAULTSORT:Changchun-Jilin Intercity Railway}} 6 : Rail transport in Jilin|Transport in Changchun|Jilin City|Railway lines opened in 2011|Airport rail links|High-speed railway lines in China |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。