请输入您要查询的百科知识:

 

词条 Charing Cross (District line) tube crash
释义

  1. Preliminary events

  2. Signal fault

  3. Problem reported

  4. Allocation of blame

  5. Similar accident

  6. References

{{Use dmy dates|date=April 2017}}{{Use British English|date=April 2017}}{{multiple issues|{{no footnotes|date=August 2014}}{{single source|date=August 2014}}
}}{{Infobox public transit accident
| name = Charing Cross (District Line) tube crash
| image =
| image_size =
| image_alt =
| caption =
| image_map =
| image_map_alt =
| image_map_caption =
| pushpin_map =
| alternative_map =
| pushpin_map_alt =
| pushpin_map_caption =
| mapframe =
| qid =
| mapframe_zoom =
| coordinates =
| date = 17th May 1938
| time = 09:55
| location = between Charing Cross and Temple stations.
| location_dir =
| location_city =
| location_dist_km =
| location_dist_mi =
| country = United Kingdom
| line = District line
| operator = London Passenger Transport Board
| owner =
| service =
| type = rear-end collision
| cause = Wrong-side failure caused by inadequate maintenance.
| bus =
| trains = 2
| vehicles =
| passengers =
| crew =
| pedestrians =
| deaths = 6
| injuries = 46
| damage =
| property =
| route_map =
| route_map_state =
| route_map_name =
| footnotes = List of UK rail accidents by year
}}

The Charing Cross (District line) tube crash occurred on 17 May 1938 at about 09:55 hours, between Charing Cross (now Embankment) and Temple stations. Six people were killed when a Circle line service ran into the rear of a District line service held at an automatic signal. A wiring error had caused the preceding signal to incorrectly display a green aspect.

Preliminary events

The track circuits connected to the signal cabin at Charing Cross had been converted to alternating current on the morning of 8 May. As a result, there was some wiring which needed to be secured. This work was carried out during the engineering hours on 17 May.

Signal fault

The signal wiring engineer had secured and reconnected all wires between the various circuit breakers in the cabin. However, one wire, which linked circuit breaker number 8 to circuit breaker number 9 had been put on the wrong terminal of circuit breaker number 9. This caused signal EH9, the eastbound starter signal, to clear even though the section ahead was occupied by a train held at automatic signal number 823.

The cabin was put into automatic mode as this was how it was normally set, but no testing was carried out, and traffic began with no observation from the engineers. Manual working was only used when a train was to be reversed at Charing Cross.

Problem reported

The problem did not appear until the line became busy. On arrival at Temple at 09:40, a motorman reported that he had nearly run into the train ahead.

The message was conveyed to Charing Cross but no action was taken despite further reports that the signal was working incorrectly. By the time it became clear that there was a significant problem, it was too late to prevent the collision.

Allocation of blame

The Ministry of Transport report held the Signal Installer and Chief Lineman responsible for the wiring error and the failure to test the signals thoroughly. The Station Foreman, Porter and Inspector were responsible for not acting promptly to prevent a collision.

Similar accident

A similar accident involving a signal wiring error had occurred near the same station on the Northern line on 10 March.

References

  • "Report to Ministry of Transport into the accident at Charing Cross on 17 May 1938", from the Railways Archive. Accessed 14 April 2008.
{{1938 railway accidents}}{{Railway accidents in the United Kingdom, 1900–1999|state=collapsed}}

6 : Disasters on the London Underground|1938 in London|Railway accidents in 1938|1938 disasters in the United Kingdom|May 1938 events|Train collisions in England

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/21 20:30:47