词条 | Cleveland commuter rail |
释义 |
Commuter rail in Cleveland, Ohio was operated by various companies until the discontinuance of the final route in early 1977. Since then, there have been several studies into the prospect of new commuter trains in the area, though none have progressed beyond the proposal phase. Historical{{expand section|date=March 2012}}Numerous private railroads operated commuter rail services to Cleveland. The last of these was the ex-Erie Lackawanna service to Youngstown which had passed to Conrail; this ended in 1977. ErieUntil 1976 the Erie Lackawanna Railroad, and previously the Erie Railroad,[1] had operated a single daily commuter train between Cleveland and Youngstown, Ohio.[2] The railroad had attempted to discontinue the train in 1970, along with its other passenger operations other than New Jersey commuter services, but the Public Utilities Commission of Ohio denied it permission.[2] In 1976, Conrail took over operation of the train, and ridership subsequently dropped.[2] As a result, the service was discontinued on 14 January 1977.[2] This service operated out of Cleveland Union Terminal and proceeded through Solon, Aurora and Warren before reaching its terminus at Youngstown, a total mileage of {{convert|66.2|mi|km}} with thirteen stations served.[2] The majority of the train's riders only rode as far as Aurora, only {{convert|23.3|mi|km}} from Cleveland, but it continued as far as Youngstown because that was the first location able to handle turning the trainset around.[2] PennsylvaniaUp until 1965 the Pennsylvania Railroad operated a weekday commuter train to Youngstown via Ravenna, Ohio. Between 1953 and 1965 these trains terminated at Pennsylvania's Euclid Avenue station; prior to that they used the old Union Depot. The PRR discontinued the service on January 29, 1965, ending all PRR service in Cleveland.[3][4][5] New York CentralUntil 1945 the New York Central operated a commuter train to and from Ashtabula, Ohio. This train terminated at Cleveland Union Terminal that was also used by the 20th Century Limited. Proposals for resumption of servicePast proposalsDuring the early 1990s, local governments in Canton, Akron and Cleveland jointly studied the possibility of rail service between those points.[11] This proposal went as far as the purchase by the cities of both abandoned and in use railroad right-of-ways in the area, and in 1996, the Federal Transit Administration appropriated several million dollars in improvements to the purchased lines.[6] From 1997 to 2001, a study into the feasibility of commuter rail in the area, dubbed the Northeast Ohio Commuter Rail Feasibility Study, was conducted, eventually resulting in suggesting operating services on up to seven lines radiating from a proposed multi-model transportation center in downtown Cleveland.[13] It suggested starting the system in three phases, with a potential total ridership of nearly 20,000 people a day, with a start-up cost of roughly $1.7 billion and an annual subsidy of around $55.2 million.[7] Present proposalsIn February 2010, a study into a potential corridor between Cleveland and Sandusky began.[8] The study cost $364,800, paid for with federal and local funds, and was conducted by Parsons Brinckerhoff Inc.[8] It was estimated to take about a year to complete,[8] and by January 2011 was nearing its end.[18] The study would indicate whether rail service or another form of transportation was ideal for the route; if the result was rail, a year-long environmental impact assessment would be conducted, if not, transportation official in the area would discuss the situation further.[9] In October 2011, the results of the study were released, though an additional $200,000 analysis for the Federal Transit Administration was yet to come.[20] The study proposed new local bus service in Lorain County in an initial five-year phase, followed by new commuter buses between Sandusky and Cleveland in the second five-year phase, commuter rail service between Cleveland and Lorain in the third phase, and later an extension to Sandusky.[20] Initial bus services would cost $11 million, with annual operating costs of about $8.3 million, and the second phase of bus services would have $16 million in start-up and $10 million in operating costs, while the Cleveland—Lorain rail service would cost $160 million, with the Sandusky extension costing $220 million, with operating costs of $17 and $18.3 million, respectively.[10] The service was originally proposed to be operated under a public/private partnership, without using federal funding, though the 2011 study suggested using federal transportation grants, and was to have startup costs of around $100 million, and could begin as early as 2013.[8] Ridership would include commuters, people traveling to Cleveland for sporting events, people traveling to ferry services to the Lake Erie Islands, and people going to the Cedar Point amusement park.[8] References1. ^{{Schafer-More-Classic | pages=53}} 2. ^1 2 3 4 5 {{cite web | url=http://www.jtbell.net/transit/Cleveland/EL/ | title=Cleveland, Ohio: | accessdate=11 November 2015 | publisher=Jon Bell}} 3. ^{{cite web | url=https://www.flickr.com/photos/ottomatic77/4941948424/in/photostream/ | title=PRR Youngstown-Cleveland commuter schedule, 1964 | accessdate=2012-03-21}} 4. ^{{cite web | url=http://www.prrths.com/Hagley/PRR%20PASS%20Jun%2005.pdf | title=PENNSYLVANIA RAILROAD COMPANY: DISCONTINUANCE/LAST RUNS OF PASSENGER SERVICE | date=June 30, 2003 | accessdate=2012-03-21 | author=Christopher T. Baer | work=PRR CHRONOLOGY}} 5. ^{{cite news | url=https://news.google.com/newspapers?nid=1955&dat=19650130&id=MS8zAAAAIBAJ&sjid=gZwFAAAAIBAJ&pg=6414,4853553 | title=Handful of Passengers Ride Last Pennsy Commuter Train | publisher=Reading Eagle | date=January 30, 1965 | accessdate=2012-03-21}} 6. ^1 {{cite web | url=http://www.fta.dot.gov/publications/reports/reports_to_congress/planning_environment_2724.html | title=Canton-Akron-Cleveland (CAC) Commuter Rail | accessdate=4 February 2011 | publisher=Federal Transit Administration}} 7. ^1 {{cite web | url=http://www.riderta.com/pdf/transit2025/Transit_2025_Appendix_G.pdf | title=Appendix G Northeast Ohio Commuter and Intercity Rail Studies | accessdate=5 February 2011 | publisher=Greater Cleveland Regional Transit Authority}} 8. ^1 2 3 4 {{cite web | url=http://blog.cleveland.com/metro/2010/02/passenger_rail_service_between_1.html | title=Passenger rail service between Cleveland and Sandusky to be studied | accessdate=5 February 2011 | date=2 February 2010 | publisher=Cleveland Plain Dealer}} 9. ^1 {{cite web | url=http://blog.cleveland.com/metro/2011/01/us_ambassador_to_haiti_kenneth.html | title=U.S. Ambassador to Haiti Kenneth Merten; passenger train from Cleveland to Sandusky: Whatever happened to ... ? | accessdate=5 February 2011 | date=16 January 2011 | publisher=Cleveland Plain Dealer}} 10. ^1 2 {{cite web|title=Cleveland, Lorain and Sandusky would be linked by bus, rail under transit plan |url=http://blog.cleveland.com/metro/2011/10/post_533.html |publisher=Cleveland Plain Dealer |accessdate=11 November 2011 |archiveurl=https://www.webcitation.org/636YR0LTQ?url=http://blog.cleveland.com/metro/2011/10/post_533.html |archivedate=11 November 2011 |date=25 October 2011 |deadurl=yes |df= }} External links
4 : Former United States regional rail systems|Transportation in Cleveland|Passenger rail transportation in Ohio|Proposed railway lines in Ohio |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。