词条 | Daxing line | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
释义 |
| name = | other_name = M4 South (planned name) Line 4 South | logo = {{huge|{{rint|beijing|d}}}} | logo_width = | color = {{BJS color|d}} | image = Xihongmen Sta site.jpg | image_width = 265px | image_alt = | caption = | type = Rapid transit | system = Beijing Subway | status = Operational | locale = Fengtai and Daxing districts Beijing | start = {{BJS stations|Gongyixiqiao}} | end = {{BJS stations|Tiangongyuan}} | stations = 11 | routes = | daily_ridership = 310,000 (2014 Avg. Daxing Line only)[1] 376,000 (2014 Peak Daxing Line only){{Ref label |notes|a|}}[2] | open = 30 December 2010 | close = | owner = | operator = Beijing MTR Corporation Limited | character = | depot =Nanzhaolu | stock = | linelength = {{convert|21.7|km|mi|abbr=on}} | tracklength = | tracks = | gauge = {{track gauge|sg|allk=on}} | electrification = | speed =100 km/h (maximum service speed) | elevation = | website = | map = {{Beijing Subway/Daxing}} | map_state = collapsed }} The Daxing Line of the Beijing Subway ({{zh|s=北京地铁大兴线 |t=北京地鐵大興線 |p=Běijīng Dìtiě Dàxīng Xiàn}}) is a rapid transit line that connects the southern Daxing District of the city with the subway network. It extends Line 4 south from its southern terminus at Gongyixiqiao, on the 4th Ring Road in Fengtai District, to Tiangongyuan, beyond the 6th Ring Road in Daxing District. The Daxing Line is about {{convert|21.7|km|abbr=on}} in length with {{convert|18|km|abbr=on}} underground.[3][4] Daxing line contains 12 stations and is about {{convert|21.7|km|abbr=on}}. Intitally Daxing line decided to have 4 ground stations. However, due to a lack of space, only Xihongmen is above the surface.[5] Full-scale construction began in 2007 and the line was opened on December 30, 2010, 14:00 local time.[6] Route & ServiceThough the Daxing Line is classified as a distinct line,[7] the Beijing MTR Corporation Limited operates through-train service on Lines 4 and Daxing, making the two lines effectively one line for travelers.{{Ref label |notes|b|}} With the opening of the Daxing Line on December 30, 2010, the Beijing MTR Corporation Limited now runs two types of train service on the combined Line 4-Daxing Line route:
Service routes
StationsDaxing Line and Line 4 stations, from north to south (with transfer points):
History
Notesa. {{note|notes}} Line 4 ridership included. b. {{note|notes}}See {{cite web |language=zh-hans |url=http://www.mtr.bj.cn/news/detail314.htm |script-title=zh:北京京港地铁有限公司 |publisher=Beijing MTR Corporation Limited |date=2010-12-29 |accessdate=2011-01-05 |deadurl=yes |archiveurl=https://web.archive.org/web/20110101112938/http://www.mtr.bj.cn/news/detail314.htm |archivedate=2011-01-01 |df= }} & {{cite web|url=http://www.mtr.bj.cn/en/news/detail41.htm |title=Beijing MTR Corporation Limited |publisher=Mtr.bj.cn |date=2010-09-27 |accessdate=2011-01-05 |deadurl=yes |archiveurl=https://web.archive.org/web/20111009021952/http://www.mtr.bj.cn/en/news/detail41.htm |archivedate=2011-10-09 |df= }} (English) References1. ^{{cite news|url=http://www.bjjtw.gov.cn/gzdt/dtxx/201209/t20120917_65370.htm |script-title=zh:我市轨道交通网络化运营效果凸显|date=2012-09-17|accessdate=2013-09-15|publisher=Beijing Municipal Transportation Committee ({{lang|zh-hans|北京市交通委员会}}) |deadurl=yes|archiveurl=https://web.archive.org/web/20140903122947/http://www.bjjtw.gov.cn/gzdt/dtxx/201209/t20120917_65370.htm|archivedate=2014-09-03|df=}} {{Beijing transit}}{{Beijing Subway}}2. ^{{cite web |url=http://bjrb.bjd.com.cn/html/2013-07/14/content_89669.htm |script-title=zh:地铁日客流突破1100万人次 |author=Liu Mian ({{lang|zh-hans|刘冕}}) |accessdate=2013-07-15 |deadurl=yes |archiveurl=https://web.archive.org/web/20130718222918/http://bjrb.bjd.com.cn/html/2013-07/14/content_89669.htm |archivedate=2013-07-18 |df= }} 3. ^{{cite web |language=zh-hans |url=http://www.bjdx.gov.cn/jrdx/dxxw/dxxx/2007n/105338.htm |script-title=zh:地铁大兴线01号标段(义和庄站)开工建设 |publisher=Daxing News |date=December 21, 2007}} 4. ^{{cite web |language=zh-hans |url=http://paper.people.com.cn/jhsb/html/2009-10/08/content_356505.htm |script-title=zh:地铁大兴线各站年底全封顶 |work=Beijing Times |date=October 8, 2009}} 5. ^{{cite web |language=zh-hans |url=http://www.chinanews.com.cn/cj/xfsh/news/2008/05-15/1251281.shtml |script-title=zh:北京地铁大兴线6月1日开工 计划2011年底通车 |publisher=Beijing Evening News |date=May 15, 2008}} 6. ^1 (Chinese) Apr. 20, 2010 7. ^{{cite web |language=zh-hans |url=http://news.china.com.cn/local/2010-05/23/content_20097302.htm |script-title=zh:北京地铁4号线今年年底将与大兴线贯通运营 |website=news.china.com.cn |date=23 May 2010 |accessdate=4 July 2010}} 8. ^http://www.bjsubway.com/station/zjgls/ 9. ^{{cite web |language=zh-hans |url=http://www.bj.xinhuanet.com/bjpd_sdzx/2008-06/01/content_13422509.htm |script-title=zh:北京地铁大兴线将开工 将建6个公交枢纽 |publisher=Beijing Morning News |date=June 1, 2008}} 10. ^{{cite web |language=zh-hans |url=http://www.gov.cn/jrzg/2008-11/16/content_1150696.htm |script-title=zh:北京地铁大兴线义和庄车站开始盾构施工 |publisher=Xinhua News |date=November 16, 2008}} 4 : Beijing Subway lines|Railway lines opened in 2010|MTR Corporation|750 V DC railway electrification |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。