请输入您要查询的百科知识:

 

词条 Eastern Corridor Commuter Rail
释义

  1. Initial Corridor

     Proposed Stations 

  2. Further Expansion

  3. Criticism

  4. References

  5. External links

{{update|date=January 2012|cat=Rail transport articles in need of updating}}{{Infobox rail line
|name = Eastern Corridor Project
|image =
|image_width =
|caption =
|type = Commuter rail, Highway
|system =
|status = Currently in the planning stage
|locale = Greater Cincinnati
|start =
|end =
|stations = 10 (proposed)
|open = TBA
|close =
|owner = NS, SORTA
|operator = SORTA
|character =
|stock =
|linelength = 30 miles (Projected)
|tracklength =
|gauge = {{track gauge|ussg}}
|minradius =
|speed =
|elevation =
|map =
}}

Based in southwest Ohio, the Eastern Corridor Program is a regional effort that integrates roadway network improvements, new rail transit, expanded bus service, bikeways and walking paths to improve travel and access between Greater Cincinnati's eastern communities and its central employment, economic and social centers.[1] The Program is designed to address the long-standing transportation needs of the region and to provide additional opportunity for community enhancement, economic development and regional growth.[1]

Currently in the second phase of study and development, the Program is divided into four core projects: improvements to the Red Bank corridor; relocation of the western terminus of State Route 32 to a new, direct link with US 50 (Columbia Parkway), the Red Bank business corridor and I-71; improvements to State Route 32 in the Eastgate area in western Clermont County; and the Oasis Rail Transit project.[1]

The Oasis rail component is first of several proposed commuter rail lines being developed by SORTA, Hamilton County and Cincinnati[2] in the Greater Cincinnati metro area in conjunction with proposed Light Rail and Streetcar lines.[3] The plan currently calls for using and upgrading existing rail lines and using rail cars powered by modern diesel multiple unit (DMUs) technology.[4]

Initial Corridor

The Oasis Rail Transit project is the first proposed leg of a new regional rail system that will provide a new and much-needed transportation alternative for area residents. The Oasis line would span 17 miles between the Riverfront Transit Center in downtown Cincinnati in The Banks area[5] and run east along a combination of existing and new tracks to Milford.[6] After completing the Oasis Line, SORTA plans to create the Wasson Line.[7]

Proposed Stations

Original proposals for the Eastern Corridor includes ten stations:[8]

  • Riverfront Transit Center
  • East Riverfront
  • East Walnut Hills
  • Columbia-Tusculum
  • Lunken Airport
  • Linwood
  • Fairfax-Mariemont
  • Newtown
  • Broadwell Rd.
  • Milford

Further Expansion

In addition to the Eastern Corridor initial proposals define two other commuter rail corridors: one running west from downtown Cincinnati through Delhi and Cleves to Lawrenceburg, Indiana,[9] and the other running north through West Chester, Middletown, to Dayton.[10]

Criticism

In November 2012, citizens of the Mariemont community and Hamilton County publicly objected to the State Route 32 relocation project, one part of the Eastern Corridor Program.[11] Residents of the Mariemont area were outraged when they heard that a corridor under consideration for the relocated SR32 could impact community gardens and parks along the banks of the Little Miami River. The project has also had difficulty starting due to an unusually high budget.[12] The original estimated operating cost of the highway was $18.9 million a year.[12] Currently, the Eastern Corridor Project is in Tier 2 of the planning phase.[13] On 22 January 2013, a community wide meeting was held in Mariemont Village to discuss the status of the State Route 32 Relocation project, as well as objections to the project's proposed routing through Mariemont's South 80 Trails and Community Gardens park. Some of the arguments against the project that were brought up at the meeting were the adverse effects of building a highway through part of historic Mariemont, designated a National Historic Landmark since 2007, as well as ODOT's (Ohio Department of Transportation) failure to take into account the village's National Historic Landmark status, and the boundaries of the protected area, when conducting initial planning; the threat to Native American burial grounds and un-excavated archaeological sites along the proposed routing, the threats of air, sound, and noise pollution that would result from the construction and use of a major highway so close to the village, and threats to the Little Miami River, one of only 156 rivers in the US designated a National Wild and Scenic River.[14]

References

1. ^http://easterncorridor.org/
2. ^{{cite news| url=http://cincinnati.bizjournals.com/cincinnati/stories/2009/04/06/tidbits1.html | first=Dan | last=Monk | title=Cincinnati's Eastern Corridor project picks up speed with $20M stimulus | date=6 April 2009}}
3. ^http://fairfaxohio.org/index.php?option=com_content&task=view&id=41&Itemid=1
4. ^{{cite web |url=http://news.enquirer.com/apps/pbcs.dll/article?AID=/20070707/NEWS01/707070390/1077/COL02 |archive-url=https://archive.today/20120719212700/http://news.enquirer.com/apps/pbcs.dll/article?AID=/20070707/NEWS01/707070390/1077/COL02 |dead-url=yes |archive-date=2012-07-19 |title=All aboard? Rail proposed |df= }}
5. ^http://www.thetransportpolitic.com/2010/05/14/cincinnati-approves-funding-for-streetcar-increasing-likelihood-of-federal-commitment/
6. ^http://www.cincinnati-oh.gov/transeng/pages/-7176-/
7. ^{{Cite web |url=http://www.hamilton-co.org/hc/easternCorridor.asp |title=Archived copy |access-date=2010-07-03 |archive-url=https://web.archive.org/web/20110703012419/http://www.hamilton-co.org/hc/easternCorridor.asp |archive-date=2011-07-03 |dead-url=yes |df= }}
8. ^http://www.cincinnati-transit.net/commuterrail.html
9. ^http://www.economicscenter.org/research/reports/economic-impact-lunken-airport-greater-cincinnati-economy
10. ^{{Cite web |url=http://www.dot.state.oh.us/Divisions/Rail/Programs/passenger/Ohio%20Hub%20Economic%20Impact%20Studies/TEMS10ConsumerRailBenefits.pdf |title=Archived copy |access-date=2010-07-03 |archive-url=https://web.archive.org/web/20090514012128/https://www.dot.state.oh.us/Divisions/Rail/Programs/passenger/Ohio%20Hub%20Economic%20Impact%20Studies/TEMS10ConsumerRailBenefits.pdf |archive-date=2009-05-14 |dead-url=yes |df= }}
11. ^{{Cite web |url=http://local12.com/news/local/story/Mariemont-Residents-Object-To-Eastern-Corridor/jVikj-Lh1UyX06kme6nyNg.cspx |title=Archived copy |access-date=2012-12-14 |archive-url=https://web.archive.org/web/20121121095303/http://www.local12.com/news/local/story/Mariemont-Residents-Object-To-Eastern-Corridor/jVikj-Lh1UyX06kme6nyNg.cspx |archive-date=2012-11-21 |dead-url=yes |df= }}
12. ^Mecklenborg, J. (2012, August 10). Breaking down Cincinnati's Eastern Corridor passenger rail plan. Retrieved December 11, 2012, from Urban Cincy website: http://www.urbancincy.com/2010/08/breaking-down-cincinnatis-eastern-corridor-passenger-rail-plan/
13. ^{{Cite web |url=http://easterncorridor.org/project-history |title=Archived copy |access-date=2013-01-23 |archive-url=https://web.archive.org/web/20120317023155/http://www.easterncorridor.org/project-history |archive-date=2012-03-17 |dead-url=yes |df= }}
14. ^Mariemont community meeting with ODOT on the topic of the proposed routing of the Eastern Corridor Project, 22 January 2013

External links

  • Eastern Corridor
  • SORTA official website

3 : Passenger rail transportation in Cincinnati|Commuter rail in the United States|Proposed railway lines in Ohio

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/11 22:32:02