词条 | Expressway S17 (Poland) | |||||||||||||||||||||||||||||||||||
释义 |
|country = POL |type = S |route = 17 |map = NowaMapaS17.svg |e-road={{jct|country=EUR|E|372}} |length_km=90 |length_round=1 |length_notes={{convert|310|km|0|abbr=on}} planned |terminus_a= S8 northeast of Warsaw |junction= A2 east of Warsaw S19 near Lublin |terminus_b= M09, border with Ukraine |regions=Mazowieckie, Lubelskie |cities=Warsaw, Lublin }}Expressway S17 or Express Road S17 (in Polish Droga ekspresowa S17) is an important road in Poland which, when completed, will run from Warsaw, through Lublin, to the border crossing with Ukraine at Hrebenne/Rava-Ruska. Its route runs parallel to National road 17 (DK 17) which it will replace. As of November 2014, {{convert|90|km|abbr=on}}, out of a planned {{convert|310|km|abbr=on}}, has been completed. These are three separate sections forming the bypasses of Garwolin, Lublin and Hrebenne. The busier portion of the road between Warsaw and Lublin was to be finished by 2015, but with subsequent reductions in government spending on infrastructure, the completion was delayed. It was put to tender September 2013 and contractors are still being selected for a design-build project, with construction starting around 2016.[1][2] The road southeast of Lublin has lower traffic density and is not likely to be completed before 2020, except for short sections serving as city bypasses. A document outlining the future development of transport infrastructure issued by the Polish government in August 2014 projects that the road will be fully completed in 2021. [3] Lublin bypassIn December 2009, the bidding process was started for the contracts to build the {{convert|66|km|abbr=on}} section of the road around Lublin, from Kurów to Piaski, which includes the city's east-west bypass road.[4] The construction of this section started in 2010, with the first 13 km section to be opened to traffic in late 2012[5] and the rest in 2014.[6][7] On this section, S17 overlaps with S12. S17 in WarsawIn Warsaw, the S17 expressway will serve as the eastern bypass of the city (Wschodnia Obwodnica Warszawy). The construction timetable is not yet set and will depend on government budget decisions. Sections of the expressway
References1. ^Szukamy wykonawców kolejnych odcinków S17 {{Polish Expressways}}2. ^PDF of government decision posted on http://bip.transport.gov.pl/ 3. ^ DOKUMENT IMPLEMENTACYJNY DO STRATEGII ROZWOJU TRANSPORTU DO 2020 R. (z perspektywą do 2030 r.) 4. ^Announcements posted on GDDKiA site, retrieved Dec. 17 2009 5. ^Dziennik budowy S17: Prezent na 11 listopada 6. ^Kurier Lubelski article from 10 August 2010 7. ^{{Cite web|publisher= Bloomberg Businessweek|title=Aecom joint venture wins Polish road contract| accessdate=27 September 2010|date= 23 September 2010| url=http://www.businessweek.com/ap/financialnews/D9IDPM9G2.htm}} 2 : Expressways in Poland|Proposed roads in Poland |
|||||||||||||||||||||||||||||||||||
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。