  1. Background

  2. Organization history

  3. Objectives

  4. Timeline and current status

  5. Reactor overview

  6. Technical design

     Vacuum vessel  Breeder blanket  Magnet system  Additional heating  Cryostat  Cooling systems 

  7. Location

  8. Participants

  9. Funding

  10. Criticism

     Responses to criticism 

  11. Similar projects

  12. See also

  13. References

  14. External links

{{for|the type of medieval circuit court|Eyre (legal term)}}{{For|the computer science terminology|Iterator}}{{coord|43.70831|N|5.77741|E|type:landmark_region:FR|display=title}}{{Use dmy dates|date=May 2013}}{{Infobox Organization
|name=International Thermonuclear Experimental Reactor
|image = ITER Logo NoonYellow.svg
|caption =
|map = ITER participants.svg
|mcaption = {{small|Thirty-five participating nations}}
|headquarters = Saint-Paul-lès-Durance, France
|membership =
|leader_title = Director-General
|leader_name = Bernard Bigot
|leader_title2 =
|leader_name2 =
|formation = 24 October 2007
|website = {{url|http://www.iter.org/}}
}}{{Fusion devices
|name = ITER
|image = ITER Exhibit (01810402) (12219071813) (cropped).jpg
|imagetitle = Small-scale model of ITER
|type = Tokamak
|construction = 2013–2025
|operation =
|major radius = 6.2 m
|minor radius =
|volume = 840 m3
|field = 11.8 T (peak toroidal field on coil)
5.3 T (toroidal field on axis)
6 T (peak poloidal field on coil)
|heating = 50 MW
|power = 500 MW
|time = up to 1000 s
|current =
|location = Saint-Paul-
lès-Durance, France
}}ITER (International Thermonuclear Experimental Reactor) is an international nuclear fusion research and engineering megaproject, which will be the world's largest magnetic confinement plasma physics experiment. It is an experimental tokamak nuclear fusion reactor that is being built next to the Cadarache facility in Saint-Paul-lès-Durance, in Provence, southern France.[1]

ITER was proposed in 1987[2] and designed as the International Thermonuclear Experimental Reactor, according to the "ITER Technical Basis," published by the International Atomic Energy Agency, in 2002.[3] By 2005, the ITER organization abandoned the original meaning of the acronym iter, and instead adopted a new meaning, the Latin word for "the way."[4]

The ITER thermonuclear fusion reactor has been designed to produce a fusion plasma equivalent to 500 megawatts (MW) of thermal output power for around twenty minutes while 50 megawatts of thermal power are injected into the tokamak, resulting in a ten-fold gain of plasma heating power.[5]

Thereby the machine aims to demonstrate the principle of producing more thermal power from the fusion process than is used to heat the plasma, something that has not yet been achieved in any fusion reactor.

The total electricity consumed by the reactor and facilities will range from 110 MW up to 620 MW peak for 30-second periods during plasma operation.[6]

Thermal-to-electric conversion is not included in the design because ITER will not produce sufficient power for net electrical production. The emitted heat from the fusion reaction will be vented to the atmosphere.[7][8]

The project is funded and run by seven member entities—the European Union, India, Japan, China, Russia, South Korea, and the United States. The EU, as host party for the ITER complex, is contributing about 45 percent of the cost, with the other six parties contributing approximately 9 percent each.[9][10][11]

In 2016 the ITER organization signed a technical cooperation agreement with the national nuclear fusion agency of Australia, enabling this country access to research results of ITER in exchange for construction of selected parts of the ITER machine.[12]

Construction of the ITER Tokamak complex started in 2013[13] and the building costs are now over US$14 billion as of June 2015.[14] The facility is expected to finish its construction phase in 2025 and will start commissioning the reactor that same year. Initial plasma experiments are scheduled to begin in 2025, with full deuterium–tritium fusion experiments starting in 2035.[15][16] If ITER becomes operational, it will become the largest magnetic confinement plasma physics experiment in use with a plasma volume of 840 cubic meters,[17] surpassing the Joint European Torus by almost a factor of 10.

The goal of ITER is to demonstrate the scientific and technological feasibility of fusion energy for peaceful use.[18]

It is the latest and largest of more than 100 fusion reactors built since the 1950s.[18]

ITER's planned successor, DEMO, is expected to be the first fusion reactor to produce electricity in an experimental environment.

DEMO's anticipated success is expected to lead to full-scale electricity-producing fusion power stations and future commercial reactors.[19]

Background

Fusion power has the potential to provide sufficient energy to satisfy mounting demand, and to do so sustainably, with a relatively small impact on the environment.

Nuclear fusion has many potential attractions. Firstly, its hydrogen isotope fuels are relatively abundant – one of the necessary isotopes, deuterium, can be extracted from seawater, while the other fuel, tritium, would be bred from a lithium blanket using neutrons produced in the fusion reaction itself.[20] Furthermore, a fusion reactor would produce virtually no CO2 or atmospheric pollutants, and its radioactive waste products would mostly be very short-lived compared to those produced by conventional nuclear reactors.

On 21 November 2006, the seven participants formally agreed to fund the creation of a nuclear fusion reactor.[21] The program is anticipated to last for 30 years – 10 for construction, and 20 of operation. ITER was originally expected to cost approximately €5 billion, but the rising price of raw materials and changes to the initial design have seen that amount almost triple to €13 billion.[14] The reactor is expected to take 10 years to build with completion scheduled for 2019.[22] Site preparation has begun in Cadarache, France, and procurement of large components has started.[23]

When supplied with 300 MW of electrical power, ITER is expected to produce the equivalent of 500 MW of thermal power sustained for up to 1,000 seconds.[24] This compares to JET's consumption of 700 MW of electrical power and peak thermal output of 16 MW for less than a second) by the fusion of about 0.5 g of deuterium/tritium mixture in its approximately 840 m3 reactor chamber. The heat produced in ITER will not be used to generate any electricity because after accounting for losses and the 300 MW minimum power input, the

output will be equivalent to a zero (net) power reactor.[7]

Organization history

ITER began in 1985 as a Reagan–Gorbachev[25][26] initiative[26][27] with the equal participation of the Soviet Union, the European Atomic Energy Community, the United States, and Japan through the 1988–1998 initial design phases. Preparations for the first Gorbachev-Reagan Summit showed that there were no tangible agreements in the works for the summit.

One energy research project, however, was being considered quietly by two physicists, Alvin Trivelpiece and Evgeny Velikhov. The project involved collaboration on the next phase of magnetic fusion research — the construction of a demonstration model. At the time, magnetic fusion research was ongoing in Japan, Europe, the Soviet Union and the US. Velikhov and Trivelpiece believed that taking the next step in fusion research would be beyond the budget of any of the key nations and that collaboration would be useful internationally.

A major bureaucratic fight erupted in the US government over the project. One argument against collaboration was that the Soviets would use it to steal US technology and know-how. A second was symbolic — the Soviet physicist Andrei Sakharov was in internal exile and the US was pushing the Soviet Union on its human rights record. The United States National Security Council convened a meeting under the direction of William Flynn Martin that resulted in a consensus that the US should go forward with the project.

Martin and Velikhov concluded the agreement that was agreed at the summit and announced in the last paragraph of this historic summit meeting, "... The two leaders emphasized the potential importance of the work aimed at utilizing controlled thermonuclear fusion for peaceful purposes and, in this connection, advocated the widest practicable development of international cooperation in obtaining this source of energy, which is essentially inexhaustible, for the benefit for all mankind."[28]

Conceptual and engineering design phases carried out under the auspices of the IAEA led to an acceptable, detailed design in 2001, underpinned by US$650 million worth of research and development by the "ITER Parties" to establish its practical feasibility.{{citation needed|date=December 2015}} These parties, namely EU, Japan, Russian Federation (replacing the Soviet Union), and United States (which opted out of the project in 1999 and returned in 2003), were joined in negotiations by China, South Korea, and Canada (who then terminated its participation at the end of 2003). India officially became part of ITER in December 2005.

On 28 June 2005, it was officially announced that ITER would be built in the European Union in Southern France. The negotiations that led to the decision ended in a compromise between the EU and Japan, in that Japan was promised 20% of the research staff on the French location of ITER, as well as the head of the administrative body of ITER. In addition, another research facility for the project will be built in Japan, and the European Union has agreed to contribute about 50% of the costs of this institution.[29]

On 21 November 2006, an international consortium signed a formal agreement to build the reactor.[30] On 24 September 2007, the People's Republic of China became the seventh party to deposit the ITER Agreement to the IAEA. Finally, on 24 October 2007, the ITER Agreement entered into force and the ITER Organization legally came into existence.

Objectives

ITER's mission is to demonstrate the feasibility of fusion power, and prove that it can work without negative impact.[31] Specifically, the project aims to:

  • Momentarily produce a fusion plasma with thermal power ten times greater than the injected thermal power (a Q value of 10).
  • Produce a steady-state plasma with a Q value greater than 5. (Q = 1 is scientific breakeven.)
  • Maintain a fusion pulse for up to 8 minutes.
  • Develop technologies and processes needed for a fusion power station — including superconducting magnets and remote handling (maintenance by robot).
  • Verify tritium breeding concepts.
  • Refine neutron shield/heat conversion technology (most of the energy in the D+T fusion reaction is released in the form of fast neutrons).

Timeline and current status

In 1978, the European Commission, Japan, United States, and USSR joined in the International Tokamak Reactor (INTOR) Workshop, under the auspices of the International Atomic Energy Agency (IAEA), to assess the readiness of magnetic fusion to move forward to the experimental power reactor (EPR) stage, to identify the additional R&D that must be undertaken, and to define the characteristics of such an EPR by means of a conceptual design. Hundreds of fusion scientists and engineers in each participating country took part in a detailed assessment of the then present status of the tokamak confinement concept vis-a-vis the requirements of an EPR, identified the required R&D by early 1980, and produced a conceptual design by mid-1981.

In 1985, at the Geneva summit meeting in 1985, Mikhail Gorbachev suggested to Ronald Reagan that the two countries jointly undertake the construction of a tokamak EPR as proposed by the INTOR Workshop. The ITER project was initiated in 1988.[32][33]

Project milestones
Date Event
1988 ITER project officially initiated.[32][33] Conceptual design activities ran from 1988 to 1990.[34]
1992 Engineering design activities from 1992[35] to 1998.[36]
2005 India officially became part of ITER.
2006 Approval of a cost estimate of €10 billion (US$12.8 billion) projecting the start of construction in 2008 and completion a decade later.[21]
2008 Site preparation start, ITER itinerary start.[37]
2009 Site preparation completion.[37]
2010 Tokamak complex excavation starts.[33]
2013 Tokamak complex construction starts.[37]
2015 Tokamak construction starts,[38][39] but the schedule is extended by at least six years.[40]
2017 Assembly Hall ready for equipment
{{nowrap|2018-2025}}Assembly and integration[41]
2025Planned: Assembly ends; commissioning phase starts[41]
2025Planned: Achievement of first plasma.[42]
2035Planned: Start of deuterium–tritium operation.[43]

Reactor overview

{{See also|Nuclear fusion}}

When deuterium and tritium fuse, two nuclei come together to form a helium nucleus (an alpha particle), and a high-energy neutron.

{{nuclide|Deuterium}} + {{nuclide|Tritium}} → {{nuclide|Helium}} + {{SubatomicParticle|10neutron}} + {{val|17.59|ul=MeV}}

While nearly all stable isotopes lighter on the periodic table than iron-56 and nickel-62, which have the highest binding energy per nucleon, will fuse with some other isotope and release energy, deuterium and tritium are by far the most attractive for energy generation as they require the lowest activation energy (thus lowest temperature) to do so, while producing among the most energy per unit weight.

All proto- and mid-life stars radiate enormous amounts of energy generated by fusion processes. Mass for mass, the deuterium–tritium fusion process releases roughly three times as much energy as uranium-235 fission, and millions of times more energy than a chemical reaction such as the burning of coal. It is the goal of a fusion power station to harness this energy to produce electricity.

Activation energies for fusion reactions are generally high because the protons in each nucleus will tend to strongly repel one another, as they each have the same positive charge. A heuristic for estimating reaction rates is that nuclei must be able to get within 100 femtometers (1 × 10−13 meter) of each other, where the nuclei are increasingly likely to undergo quantum tunneling past the electrostatic barrier and the turning point where the strong nuclear force and the electrostatic force are equally balanced, allowing them to fuse. In ITER, this distance of approach is made possible by high temperatures and magnetic confinement.

High temperatures give the nuclei enough energy to overcome their electrostatic repulsion (see Maxwell–Boltzmann distribution). For deuterium and tritium, the optimal reaction rates occur at temperatures on the order of 100,000,000 K. The plasma is heated to a high temperature by ohmic heating (running a current through the plasma). Additional heating is applied using neutral beam injection (which cross magnetic field lines without a net deflection and will not cause a large electromagnetic disruption) and radio frequency (RF) or microwave heating.

At such high temperatures, particles have a large kinetic energy, and hence velocity. If unconfined, the particles will rapidly escape, taking the energy with them, cooling the plasma to the point where net energy is no longer produced. A successful reactor would need to contain the particles in a small enough volume for a long enough time for much of the plasma to fuse.

In ITER and many other magnetic confinement reactors, the plasma, a gas of charged particles, is confined using magnetic fields. A charged particle moving through a magnetic field experiences a force perpendicular to the direction of travel, resulting in centripetal acceleration, thereby confining it to move in a circle or helix around the lines of magnetic flux.

A solid confinement vessel is also needed, both to shield the magnets and other equipment from high temperatures and energetic photons and particles, and to maintain a near-vacuum for the plasma to populate.

The containment vessel is subjected to a barrage of very energetic particles, where electrons, ions, photons, alpha particles, and neutrons constantly bombard it and degrade the structure. The material must be designed to endure this environment so that a power station would be economical. Tests of such materials will be carried out both at ITER and at IFMIF (International Fusion Materials Irradiation Facility).

Once fusion has begun, high energy neutrons will radiate from the reactive regions of the plasma, crossing magnetic field lines easily due to charge neutrality (see neutron flux). Since it is the neutrons that receive the majority of the energy, they will be ITER's primary source of energy output. Ideally, alpha particles will expend their energy in the plasma, further heating it.

Beyond the inner wall of the containment vessel one of several test blanket modules will be placed. These are designed to slow and absorb neutrons in a reliable and efficient manner, limiting damage to the rest of the structure, and breeding tritium for fuel from lithium-bearing ceramic pebbles contained within the blanket module following the following reactions:

{{SubatomicParticle|10neutron}} + {{nuclide|Lithium|6}} → {{nuclide|Tritium}} + {{nuclide|Helium}}

{{SubatomicParticle|10neutron}} + {{nuclide|Lithium|7}} → {{nuclide|Tritium}} + {{nuclide|Helium}} + {{SubatomicParticle|10neutron}}

where the reactant neutron is supplied by the D-T fusion reaction.

Energy absorbed from the fast neutrons is extracted and passed into the primary coolant. This heat energy would then be used to power an electricity-generating turbine in a real power station; in ITER this generating system is not of scientific interest, so instead the heat will be extracted and disposed of.

Technical design

{{wide image|ITER Tokamak and Plant Systems (2016) (41783636452).jpg|1200px|alt=Drawing of the ITER tokamak and integrated plant systems|Drawing of the ITER tokamak and integrated plant systems}}

Vacuum vessel

The vacuum vessel is the central part of the ITER machine: a double walled steel container in which the plasma is contained by means of magnetic fields.

The ITER vacuum vessel will be twice as large and 16 times as heavy as any previously manufactured fusion vessel: each of the nine torus shaped sectors will weigh between 390 and 430 tonnes.[44] When all the shielding and port structures are included, this adds up to a total of 5,116 tonnes. Its external diameter will measure {{convert|19.4|m}}, the internal {{convert|6.5|m}}. Once assembled, the whole structure will be {{convert|11.3|m}} high.

The primary function of the vacuum vessel is to provide a hermetically sealed plasma container. Its main components are the main vessel, the port structures and the supporting system. The main vessel is a double walled structure with poloidal and toroidal stiffening ribs between {{convert|60|mm|in|adj=mid|-thick}} shells to reinforce the vessel structure. These ribs also form the flow passages for the cooling water. The space between the double walls will be filled with shield structures made of stainless steel. The inner surfaces of the vessel will act as the interface with breeder modules containing the breeder blanket component. These modules will provide shielding from the high-energy neutrons produced by the fusion reactions and some will also be used for tritium breeding concepts.

The vacuum vessel has 18 upper, 17 equatorial and 9 lower ports that will be used for remote handling operations, diagnostic systems, neutral beam injections and vacuum pumping.

Breeder blanket

Owing to very limited terrestrial resources of tritium, a key component of the ITER reactor design is the breeder blanket. This component, located adjacent to the vacuum vessel, serves to produce tritium through reaction with neutrons from the plasma. There are several reactions that produce tritium within the blanket. {{SimpleNuclide2|link=yes|Lithium|6}} produces tritium via n,t reactions with moderated neutrons, {{SimpleNuclide2|link=yes|Lithium|7}} produces tritium via interactions with higher energy neutrons via n,nt reactions. Concepts for the breeder blanket include helium cooled lithium lead (HCLL) and helium cooled pebble bed (HCPB) methods. Six different Test Blanket Modules (TBM) will be tested in ITER and will share a common box geometry. Materials for use as breeder pebbles in the HCPB concept include lithium metatitanate and lithium orthosilicate.[45] Requirements of breeder materials include good tritium production and extraction, mechanical stability and low activation levels.[46]

Magnet system

The central solenoid coil will use superconducting niobium-tin to carry 46 kA and produce a field of up to 13.5 teslas.

The 18 toroidal field coils will also use niobium-tin. At their maximum field strength of 11.8 teslas, they will be able to store 41 gigajoules. They have been tested at a record 80 kA. Other lower field ITER magnets (PF and CC) will use niobium-titanium for their superconducting elements. As of now the in-wall shielding blocks to protect the magnets from high energy neutrons are being manufactured and transported from the Avasarala technologies in Bangalore India to the ITER center.[47]

Additional heating

There will be three types of external heating in ITER:

  • Two Heating Neutral Beam injectors (HNB), each providing about 17MW to the burning plasma, with the possibility to add a third one. The requirements for them are: deuterium beam energy - 1MeV, total current - 40A and beam pulse duration - up to 1h. The prototype is being built at the Neutral Beam Test Facility (NBTF),[48] which is being constructed in Padua, Italy.
  • Ion Cyclotron Resonance Heating (ICRH)
  • Electron Cyclotron Resonance Heating (ECRH)

Cryostat

The cryostat is a large 3,800-tonne stainless steel structure surrounding the vacuum vessel and the superconducting magnets, in order to provide a super-cool vacuum environment. Its thickness ranging from {{convert|50|to|250|mm|in}} will allow it to withstand the atmospheric pressure on the area of a volume of 8,500 cubic meters. The total of 54 modules of the cryostat will be engineered, procured, manufactured, and installed by Larsen & Toubro Heavy Engineering in India.[49][50]

Cooling systems

The ITER tokamak will use three interconnected cooling systems. Most of the heat will be removed by a primary water cooling loop, itself cooled by water through a heat exchanger within the tokamak building's secondary confinement. The secondary cooling loop will be cooled by a larger complex, comprising a cooling tower, a {{cvt|5|km}} pipeline supplying water from Canal de Provence, and basins that allow cooling water to be cooled and tested for chemical contamination and tritium before being released into the Durance River. This system will need to dissipate an average power of {{val|450|u=MW}} during the tokamak's operation. A liquid nitrogen system will provide a further {{val|1300|u=kW}} of cooling to {{convert|80|K|lk=in}}, and a liquid helium system will provide {{val|75|u=kW}} of cooling to {{convert|4.5|K}}. The liquid helium system will be designed, manufactured, installed and commissioned by Air Liquide in France.[51][52]

Location

The process of selecting a location for ITER was long and drawn out. The most likely sites were Cadarache in Provence-Alpes-Côte-d'Azur, France, and Rokkasho, Aomori, Japan. Additionally, Canada announced a bid for the site in Clarington in May 2001, but withdrew from the race in 2003. Spain also offered a site at Vandellòs on 17 April 2002, but the EU decided to concentrate its support solely behind the French site in late November 2003. From this point on, the choice was between France and Japan. On 3 May 2005, the EU and Japan agreed to a process which would settle their dispute by July.

At the final meeting in Moscow on 28 June 2005, the participating parties agreed to construct ITER at Cadarache in Provence-Alpes-Côte-d'Azur, France. Construction of the ITER complex began in 2007, while assembly of the tokamak itself was scheduled to begin in 2015.[23]

Fusion for Energy, the EU agency in charge of the European contribution to the project, is located in Barcelona, Spain. Fusion for Energy (F4E) is the European Union's Joint Undertaking for ITER and the Development of Fusion Energy. According to the agency's website:
F4E is responsible for providing Europe's contribution to ITER, the world's largest scientific partnership that aims to demonstrate fusion as a viable and sustainable source of energy. [...] F4E also supports fusion research and development initiatives [...][53]

The ITER Neutral Beam Test Facility aimed at developing and optimizing the neutral beam injector prototype, is being constructed in Padova, Italy.[54] It will be the only ITER facility out of the site in Cadarache.

Participants

Currently there are seven parties participating in the ITER program: the European Union (through the legally distinct organisation Euratom), India, Japan, China, Russia, South Korea, and the United States.[23] Canada was previously a full member, but has since pulled out due to a lack of funding from the federal government. The lack of funding also resulted in Canada withdrawing from its bid for the ITER site in 2003. The host member of the ITER project, and hence the member contributing most of the costs, is the EU.

In 2007, it was announced that participants in the ITER will consider Kazakhstan's offer to join the program[55] and in March 2009, Switzerland, an associate member of Euratom since 1979, also ratified the country's accession to the European Domestic Agency Fusion for Energy as a third country member.[56]

The Prime Minister of the United Kingdom announced on 20 March 2017 that the UK will be withdrawing from Euratom and future involvement in the project is unclear. The future of the Joint European Torus project, which is located in the UK, is also not certain. Some type of associate membership in Euratom is considered a likely scenario, possibly similar to Switzerland.[57][58] In 2016, ITER announced a partnership with Australia for "technical cooperation in areas of mutual benefit and interest", but without Australia becoming a full member.[59]

ITER's work is supervised by the ITER Council, which has the authority to appoint senior staff, amend regulations, decide on budgeting issues, and allow additional states or organizations to participate in ITER.[60] The current Chairman of the ITER Council is Won Namkung,[61] and the ITER Director-General is Bernard Bigot.

Participants
{{div col|colwidth=18em}}
  • {{flagcountry|China}}
  • {{flagcountry|European Union}}
  • {{flagcountry|India}}
  • {{flagcountry|Japan}}
  • {{flagcountry|Russian Federation}}
  • {{flagcountry|South Korea}}
  • {{flagcountry|Switzerland}}
  • {{flagcountry|United States}}
{{div col end}}

Funding

As of 2016, the total price of constructing the experiment is expected to be in excess of €20 billion,[62] an increase of €4.6 billion of its 2010 estimate,[63] and of €9.6 billion from the 2009 estimate.[64] Prior to that, the proposed costs for ITER were €5 billion for the construction and €5 billion for maintenance and the research connected with it during its 35-year lifetime. At the June 2005 conference in Moscow the participating members of the ITER cooperation agreed on the following division of funding contributions: 45% by the hosting member, the European Union, and the rest split between the non-hosting members – China, India, Japan, South Korea, the Russian Federation and the USA. During the operation and deactivation phases, Euratom will contribute to 34% of the total costs.[65]

Although Japan's financial contribution as a non-hosting member is one-eleventh of the total, the EU agreed to grant it a special status so that Japan will provide for two-elevenths of the research staff at Cadarache and be awarded two-elevenths of the construction contracts, while the European Union's staff and construction components contributions will be cut from five-elevenths to four-elevenths.

It was reported in December 2010 that the European Parliament had refused to approve a plan by member states to reallocate €1.4 billion from the budget to cover a shortfall in ITER building costs in 2012–13. The closure of the 2010 budget required this financing plan to be revised, and the European Commission (EC) was forced to put forward an ITER budgetary resolution proposal in 2011.[66]

The U.S. withdrew from the ITER consortium in 2000. In 2006, Congress voted to rejoin, and again contribute financially.

Criticism

A technical concern is that the 14 MeV neutrons produced by the fusion reactions will damage the materials from which the reactor is built.[68] Research is in progress to determine whether and how reactor walls can be designed to last long enough to make a commercial power station economically viable in the presence of the intense neutron bombardment. The damage is primarily caused by high energy neutrons knocking atoms out of their normal position in the crystal lattice. A related problem for a future commercial fusion power station is that the neutron bombardment will induce radioactivity in the reactor material itself.[69] Maintaining and decommissioning a commercial reactor may thus be difficult and expensive. Another problem is that superconducting magnets are damaged by neutron fluxes. A new special research facility, IFMIF, is planned to investigate this problem.

Another source of concern comes from the 2013 tokamak parameters database interpolation which says that power load on tokamak divertors will be five times the expected value for ITER and much more for actual electricity-generating reactors. Given that the projected power load on the ITER divertor is already very high, these new findings mean that new divertor designs should be urgently tested.[70] However, the corresponding test facility (ADX) has not received any funding {{as of|2018|lc=on}}.

A number of fusion researchers working on non-tokamak systems, such as Robert Bussard and Eric Lerner, have been critical of ITER for diverting funding from what they believe could be a potentially more viable and/or cost-effective path to fusion power, such as the polywell reactor.[71][72]

Many critics accuse ITER researchers of being unwilling to face up to the technical and economic potential problems posed by tokamak fusion schemes.[71] The expected cost of ITER has risen from US$5 billion to US$20 billion, and the timeline for operation at full power was moved from the original estimate of 2016 to 2027.

A French association including about 700 anti-nuclear groups, Sortir du nucléaire (Get Out of Nuclear Energy), claimed that ITER was a hazard because scientists did not yet know how to manipulate the high-energy deuterium and tritium hydrogen isotopes used in the fusion process.[73]

Rebecca Harms, Green/EFA member of the European Parliament's Committee on Industry, Research and Energy, said: "In the next 50 years, nuclear fusion will neither tackle climate change nor guarantee the security of our energy supply." Arguing that the EU's energy research should be focused elsewhere, she said: "The Green/EFA group demands that these funds be spent instead on energy research that is relevant to the future. A major focus should now be put on renewable sources of energy." French Green party lawmaker Noël Mamère claims that more concrete efforts to fight present-day global warming will be neglected as a result of ITER: "This is not good news for the fight against the greenhouse effect because we're going to put ten billion euros towards a project that has a term of 30–50 years when we're not even sure it will be effective."[74]

ITER is not designed to produce electricity, but made as a proof of concept reactor for the later DEMO project.[75]

A list of ITER suppliers isn't officially published.

Responses to criticism

Proponents believe that much of the ITER criticism is misleading and inaccurate, in particular the allegations of the experiment's "inherent danger." The stated goals for a commercial fusion power station design are that the amount of radioactive waste produced should be hundreds of times less than that of a fission reactor, and that it should produce no long-lived radioactive waste, and that it is impossible for any such reactor to undergo a large-scale runaway chain reaction.[76] A direct contact of the plasma with ITER inner walls would contaminate it, causing it to cool immediately and stop the fusion process. In addition, the amount of fuel contained in a fusion reactor chamber (one half gram of deuterium/tritium fuel[23]) is only sufficient to sustain the fusion burn pulse from minutes up to an hour at most, whereas a fission reactor usually contains several years' worth of fuel.[77]

Moreover, some detritiation systems will be implemented, so that at a fuel cycle inventory level of about {{cvt|2|kg}}, ITER will eventually need to recycle large amounts of tritium and at turnovers orders of magnitude higher than any preceding tritium facility worldwide.[78]

In the case of an accident (or sabotage), it is expected that a fusion reactor would release far less radioactive pollution than would an ordinary fission nuclear station. Furthermore, ITER's type of fusion power has little in common with nuclear weapons technology, and does not produce the fissile materials necessary for the construction of a weapon. Proponents note that large-scale fusion power would be able to produce reliable electricity on demand, and with virtually zero pollution (no gaseous CO2, SO2, or NOx by-products are produced).

According to researchers at a demonstration reactor in Japan, a fusion generator should be feasible in the 2030s and no later than the 2050s. Japan is pursuing its own research program with several operational facilities that are exploring several fusion paths.[79]

In the United States alone, electricity accounts for US$210 billion in annual sales.[80] Asia's electricity sector attracted US$93 billion in private investment between 1990 and 1999.[81] These figures take into account only current prices. Proponents of ITER contend that an investment in research now should be viewed as an attempt to earn a far greater future return.{{Citation needed|date=April 2008}} Also, worldwide investment of less than US$1 billion per year into ITER is not incompatible with concurrent research into other methods of power generation, which in 2007 totaled US$16.9 billion.[82]

Supporters of ITER emphasize that the only way to test ideas for withstanding the intense neutron flux is to experimentally subject materials to that flux, which is one of the primary missions of ITER and the IFMIF,[23] and both facilities will be vitally important to that effort.[83] The purpose of ITER is to explore the scientific and engineering questions that surround potential fusion power stations. It is nearly impossible to acquire satisfactory data for the properties of materials expected to be subject to an intense neutron flux, and burning plasmas are expected to have quite different properties from externally heated plasmas.{{Citation needed|date=February 2007}} Supporters contend that the answer to these questions requires the ITER experiment, especially in the light of the monumental potential benefits.

Furthermore, the main line of research via tokamaks has been developed to the point that it is now possible to undertake the penultimate step in magnetic confinement plasma physics research with a self-sustained reaction. In the tokamak research program, recent advances devoted to controlling the configuration of the plasma have led to the achievement of substantially improved energy and pressure confinement, which reduces the projected cost of electricity from such reactors by a factor of two to a value only about 50% more than the projected cost of electricity from advanced light-water reactors.{{Citation needed|date=March 2016}} In addition, progress in the development of advanced, low activation structural materials supports the promise of environmentally benign fusion reactors and research into alternate confinement concepts is yielding the promise of future improvements in confinement.[84] Finally, supporters contend that other potential replacements to the fossil fuels have environmental issues of their own. Solar, wind, and hydroelectric power all have a relatively low power output per square kilometer compared to ITER's successor DEMO which, at 2,000 MW,[85] would have an energy density that exceeds even large fission power stations.{{Citation needed|date=January 2019}}

Similar projects

Precursors to ITER were EAST, SST-1, KSTAR, JET,[86] and Tore Supra.[87]

Similar reactors include the Wendelstein 7-X.[88]

Other planned and proposed fusion reactors include DEMO,[89] NIF,[90] HiPER,[91] and MAST,[92] as well as CFETR (China Fusion Engineering Test Reactor), a {{val|200|u=MW}} tokamak.[93][94][95][96]

See also

{{Portal|Nuclear technology|Energy|Science|France}}
  • COLEX process (isotopic separation)
  • EAST (Experimental Advanced Superconducting Tokamak)
  • Fusenet, European Fusion Education Network, 2008-2013
  • Fusion for Energy, the Domestic Agency in charge of managing EU contributions to the ITER project
  • International Fusion Materials Irradiation Facility, proposed, construction not started
  • ITER Neutral Beam Test Facility, the facility dedicated to the development of the ITER neutral beam injector prototype
  • JT-60, Japan's magnetic fusion program
  • KSTAR (Korea Superconducting Tokamak Advanced Research), one of the first research tokamaks in the world to feature fully superconducting magnets
  • National Ignition Facility, inertial confinement using lasers
  • Nuclear power in France
  • Wendelstein 7-X (German experimental fusion reactor) - a stellarator

References

1. ^[https://web.archive.org/web/20060824071609/http://www.efda.org/the_iter_project/index.htm The ITER project]. EFDA, European Fusion Development Agreement (2006).
2. ^{{cite web|url=http://www.iaea.org/inis/collection/NCLCollectionStore/_Public/21/068/21068957.pdf |title=NCL Collection Store |date= |website=www.iaea.org }}
3. ^{{cite journal|url=https://www-pub.iaea.org/books/IAEABooks/6492/ITER-Technical-Basis|title=ITER Technical Basis|last=IAEA|date=12 September 2018|accessdate=12 September 2018}}
4. ^{{cite web|url=http://www.iter.org:80/index.htm|archiveurl=https://web.archive.org/web/20050205034858/http://www.iter.org/index.htm|archivedate=5 February 2005|title=Wayback Machine|date=5 February 2005|others=Under "What is ITER?"|accessdate=12 September 2018|dead-url=yes|df=dmy-all}}
5. ^{{cite web|title=Facts & Figures|url=https://www.iter.org/factsfigures|website=ITER|accessdate=25 November 2017|language=en}}
6. ^{{cite web|title=Power Supply|url=https://www.iter.org/mach/powersupply|website=ITER|accessdate=25 November 2017|language=en}}
7. ^{{cite web|url=http://www.jt60sa.org/b/FAQ/EE2.htm|title=Will ITER make more energy than it consumes?|website=www.jt60sa.org|accessdate=12 September 2018}}
8. ^{{cite web|url=https://www.iea.org/media/workshops/2016/fpccwebinar/Item_6_EUROPE.pdf |title=Workshop |date=2016 |website=www.iaea.org }}
9. ^{{cite news |last=Amos |first=Jonathan |date=14 October 2010 |url=https://www.bbc.co.uk/news/science-environment-11541383 |title=Key component contract for Iter fusion reactor |publisher=BBC News |accessdate=21 May 2013}}
10. ^ITER – Our Contribution. Europa (web portal). Retrieved 21 May 2013.
11. ^Lengthy ITER dispute concludes in favour of France. European Commission press release. Cordis.europa.eu (28 June 2005). Retrieved 21 May 2013.
12. ^[https://www.iter.org/doc/www/content/com/Lists/list_items/Attachments/744/2016_ITER_Annual_Report.pdf ITER Annual Report 2016]. Retrieved 25 October 2017.
13. ^{{cite web |url=https://www.iter.org/proj/iterandbeyond |title=ITER & Beyond |author=ITER Organisation |year=2014 |website=ITER |deadurl=yes |archiveurl=https://web.archive.org/web/20100601070208/http://www.iter.org/proj/ITERAndBeyond |archivedate=1 June 2010 |df=dmy-all }}
14. ^{{cite web |url=http://www.iter.org/faq#Do_we_really_know_how_much_ITER_will_cost |title=facts and figures |author= ITER Organisation |year=2015 |website=ITER}}
15. ^{{Cite journal |url=http://www.nature.com/news/triple-threat-method-sparks-hope-for-fusion-1.14445 |title=Triple-threat method sparks hope for fusion |journal=Nature |volume=505 |issue=7481 |pages=9–10 |author=W Wayt Gibbs |date=30 December 2013 |bibcode=2014Natur.505....9G |doi=10.1038/505009a |pmid=24380935 }}
16. ^{{cite web |url=https://www.iter.org/proj/inafewlines |title=What is ITER? |year=2017 |website=ITER}}
17. ^{{cite web|url=https://www.iter.org/FactsFigures|title=Facts & Figures|accessdate=12 September 2018}}
18. ^{{cite journal |last1=Meade |first1=Dale |title=50 years of fusion research |journal=Nuclear Fusion |date=2010 |volume=50 |issue=1 |page=014004 |doi=10.1088/0029-5515/50/1/014004 |language=en |issn=0029-5515|bibcode=2010NucFu..50a4004M }}
19. ^{{cite web|url=https://www.iter.org/sci/iterandbeyond |title=Broader Approach agreement |publisher=Iter.org |date= |accessdate=2018-09-23}}
20. ^"Fusion fuels". ITER. Retrieved 24 October 2011.
21. ^{{cite web |title= Green light for nuclear fusion project |url=https://www.newscientist.com/article/dn10633-green-light-for-nuclear-fusion-project.html |date=21 November 2006 |website=New Scientist |accessdate=13 September 2009}}
22. ^McGrath, Matt. (29 July 2010) [https://www.bbc.co.uk/news/science-environment-10793883 Deal finalised on fusion reactor]. BBC. Retrieved 21 May 2013.
23. ^ITER website. Iter.org. Retrieved 21 May 2013.
24. ^[https://web.archive.org/web/20100310021211/http://www.iter.org/mach/Pages/Tokamak.aspx ITER – The World's Largest Tokamak]. iter.org
25. ^{{cite book|author=Educational Foundation for Nuclear Science, Inc. |title=Bulletin of the Atomic Scientists |url=https://books.google.com/books?id=wQwAAAAAMBAJ&pg=PA9 |date=October 1992 |publisher=Educational Foundation for Nuclear Science, Inc. |pages=9– |issn=0096-3402}}
26. ^{{Cite book|author1=Braams, C.M. |author2=Stott, P.E. |title=Nuclear Fusion: Half a Century of Magnetic Confinement Fusion Research |journal=Nuclear Fusion: Half a Century of Magnetic Confinement Fusion Research/ C.m. Braams and P.e. Stott. Bristol; Philadelphia: Iop ; C2002 |url=https://books.google.com/books?id=Zj4vx9O0T0YC&pg=PA250 |date=2010 |isbn=978-0-7503-0705-5 |pages=250–|bibcode=2002nfhc.book.....B }}
27. ^{{cite book|author1=Plasma 2010 Committee |author2=Plasma Science Committee |author3=National Research Council |title=Plasma Science: Advancing Knowledge in the National Interest |url=https://books.google.com/books?id=rHo6IbakG2kC&pg=PA222 |date=2007 |publisher=National Academies Press |isbn=978-0-309-10943-7 |pages=222–}}
28. ^Joint Soviet-United States Statement on the Summit Meeting in Geneva Ronald Reagan. 21 November 1985
29. ^[https://web.archive.org/web/20050823033756/http://www.asahi.com/english/Herald-asahi/TKY200506280351.html Japan cedes ITER project to France]. The Asahi Shimbun, 29 June 2005.
30. ^{{cite news |url=http://news.bbc.co.uk/1/hi/sci/tech/6165932.stm |title=States sign nuclear energy pact |publisher=BBC News | date=21 November 2006 | accessdate=5 May 2010}}
31. ^{{cite web |title=Why ITER? |url=http://www.iter.org/proj/Pages/ITERMission.aspx |website=The ITER Organization|accessdate=13 September 2009}}
32. ^"Quest for a Fusion Energy Reactor: An Insider's Account of the INTOR Workshop", Oxford University Press (2010)
33. ^{{cite web |title= The Geneva Summit |url=http://www.iter.org/proj/itermilestones |website=Milestones in the History of the ITER Project |publisher=ITER |date=November 1985 |accessdate=12 September 2012}}
34. ^{{cite web|url=http://www.iter.org/proj/itermilestones#3|title=On the road to ITER: milestones|accessdate=12 September 2018}}
35. ^{{cite web|url=http://www.iter.org/proj/itermilestones#6|title=On the road to ITER: milestones|accessdate=12 September 2018}}
36. ^{{cite web|url=http://www.iter.org/proj/itermilestones#10|title=On the road to ITER: milestones|accessdate=12 September 2018}}
37. ^{{cite web |title= Approved! Council gives project green light to proceed |url=http://www.iter.org/proj/iterandbeyond |website=ITER & Beyond. The Phases of ITER.|publisher= ITER |date=September 2012 |accessdate=12 September 2012|archive-url=https://web.archive.org/web/20120922162049/http://www.iter.org/proj/iterandbeyond |archive-date=22 September 2012 }}
38. ^{{cite web|url=http://www.iter.org/doc/www/content/com/Lists/list_items/Attachments/646/2015_11_IC-17.pdf|title=ITER Project progressing well despite delays|date=19 November 2015|author=ITER|accessdate=20 January 2016}}
39. ^[https://www.iter.org/proj/itermilestones#105 First machine components reach ITER]. December 2015, ITER.
40. ^{{cite news|url=https://www.sciencemag.org/news/2015/11/iter-fusion-project-take-least-6-years-longer-planned|title=ITER fusion project to take at least 6 years longer than planned|last=Clery|first=Daniel|date=19 November 2015|work=Science|accessdate=2016-02-16}}
41. ^[https://www.iter.org/proj/inafewlines When will experiments begin?] ITER. Accessed April 2018.
42. ^{{cite web|url=https://www.iter.org/doc/www/content/com/Lists/list_items/Attachments/735/2017_06_IC-20.pdf|title=20th ITER Council meeting recognizes strong project progress in line with the 2016 baseline|date=22 June 2017|author=ITER|accessdate=25 June 2017}}
43. ^{{Cite news|url=http://www.iter.org/faq#When_will_ITER_be_operational|title=Frequently Asked Questions|last=|first=|date=|work=ITER|access-date=2017-09-30|language=en}}
44. ^ITER Vacuum Vessel Assembly – Call for Expression of Interest. ITER. 20 Feb 2009.
45. ^{{cite journal| last1=Hanaor| first1=D.A.H.| last2=Kolb| first2=M.H.H.| last3=Gan| first3=Y.| last4=Kamlah| first4=M.| last5=Knitter| first5=R.| title= Solution based synthesis of mixed-phase materials in the Li2TiO3-Li4SiO4 system | journal= Journal of Nuclear Materials|year=2014| volume=456| pages=151–161| url=http://www.sciencedirect.com/science/article/pii/S0022311514006187| doi=10.1016/j.jnucmat.2014.09.028|arxiv = 1410.7128 |bibcode = 2015JNuM..456..151H }}
46. ^{{cite journal| last1=Gan| first1=Y| last2=Hernandez|first2=F|display-authors=etal |title=Thermal Discrete Element Analysis of EU Solid Breeder Blanket Subjected to Neutron Irradiation| journal= Fusion Science and Technology|year=2014| volume=66|issue=1| pages=83–90 | arxiv=1406.4199| doi=10.13182/FST13-727| citeseerx=10.1.1.748.6005}}
47. ^{{cite web|url=http://www.iter.org/whatsnew/print/2016/03/21 |title=What's news |date=2016 |website=www.iter.org |format=PDF}}
48. ^{{Cite web |url=https://www.igi.cnr.it/www/sites/default/files/home201511/SchedaNBTF_MIUR_EN.pdf |title=Archived copy |access-date=9 October 2016 |archive-url=https://web.archive.org/web/20161010212050/https://www.igi.cnr.it/www/sites/default/files/home201511/SchedaNBTF_MIUR_EN.pdf |archive-date=10 October 2016 |dead-url=yes |df=dmy-all }}
49. ^{{cite web |title= Larsen & Toubro Ltd will manufacture ITER Cryostat |url=http://www.iter.org/newsline/235/1287 |date=3 September 2012 |accessdate=2 January 2013}}
50. ^{{cite web |title= Nuclear fusion win for Larsen & Toubrot |url=http://www.theconstructionindex.co.uk/news/view/nuclear-fusion-win-for-larsen-and-toubro |date=12 September 2012 |accessdate=2 January 2013}}
51. ^{{cite web |title= World's largest cryogenic plant to be installed in ITER fusion reactor |url=http://www.scienceworldreport.com/articles/4344/20121228/largest-cryogenic-helium-plant-iter-fusion-reactor-tokamak.htm |publisher=Science World Report |date=December 2012 |accessdate=31 December 2012}}
52. ^{{cite web|url=http://www.iter.org/newsline/251/1431|title=EUR 83 million contract signed for Liquid Helium Plant|accessdate=31 December 2012}}
53. ^The EU's Fusion for Energy website. Fusionforenergy.europa.eu (19 April 2007). Retrieved 2013-05-21.
54. ^The Consorzio RFX website, where the ITER Neutral Beam Test Facility is host
55. ^{{cite news| url = http://www.energy-daily.com/reports/Kazakhstan_Offers_To_Join_International_Fusion_Power_Project_999.html|title = Kazakhstan Offers To Join International Fusion Power Project| agency = RIA Novosti|accessdate=14 July 2007}}
56. ^{{cite web |url=https://www.iter.org/newsline/83/531 |title=Switzerland officializes ITER participation |date=29 May 2009 |publisher=iter.org |accessdate=1 May 2014}}
57. ^{{cite web |url=https://www.newscientist.com/article/2114690-brexit-puts-europes-nuclear-fusion-future-in-doubt/ |title=Brexit puts Europe's nuclear fusion future in doubt |date=30 Nov 2016 |publisher=New Scientist |accessdate=17 Jan 2017}}
58. ^{{cite web |url=https://www.euro-fusion.org/2016/06/eurofusion-and-uk-after-brexit/ |title=EuroFusion and UK after Brexit |date=24 Jun 2016 |publisher=EuroFusion |accessdate=17 Jan 2017}}
59. ^{{cite web |url=https://www.iter.org/newsline/-/2546 |title=Welcome Australia! |date=16 Oct 2016 |publisher=iter.org |accessdate=17 Jan 2017}}
60. ^{{cite web |url=http://www.iter.org/org/Pages/Council.aspx |title=ITER Council, ITER's top authority |publisher=ITER.org}}
61. ^{{cite web|url=https://www.iter.org/doc/www/content/com/Lists/list_items/Attachments/654/2016_01_Council_Chair.pdf|title=Won Namkung takes helm of the ITER Council|date=12 January 2016|publisher=ITER.org|access-date=23 November 2016}}
62. ^{{cite web|url=https://www.bloomberg.com/news/articles/2016-06-15/world-s-biggest-science-experiment-seeks-more-time-and-money|title=World's Biggest Science Experiment Seeks More Time and Money|last=Tirone|first=Jonathan|website=Bloomberg.com|access-date=2016-07-01}}
63. ^"[https://www.bbc.co.uk/news/10614542 EU member states agree on Iter funding shortfall"], BBC, 13 July 2010.
64. ^"Fusion falters under soaring costs", BBC, 17 June 2009 (accessed 18 June 2009).
65. ^[https://archive.is/20120713083340/http://europa.eu/rapid/pressReleasesAction.do?reference=MEMO/10/165&format=H ITER & Fusion Research press release]. Europa (web portal), 5 May 2011. Retrieved 19 November 2011.
66. ^[https://www.bbc.co.uk/news/science-environment-12007965 Nuclear fusion finance plan rejected by EU Parliament], BBC, 16 December 2010 (accessed 19 December 2010).
67. ^{{cite web|url=http://www.world-nuclear.org/info/inf66.htm |title=Nuclear Fusion Power |author=World Nuclear Association |year=2005 |website= |deadurl=yes |archiveurl=https://web.archive.org/web/20090624123428/http://www.world-nuclear.org/info/inf66.htm |archivedate=24 June 2009 |df=dmy-all }}
68. ^{{cite book|doi=10.1109/FUSION.1999.849850|title=18th IEEE/NPSS Symposium on Fusion Engineering. Symposium Proceedings (Cat. No.99CH37050)|year=1999|last1=Cambi|first1=G.|last2=Cepraga|first2=D.G.|last3=Frisoni|first3=M.|last4=Carloni|first4=F.|page=330|chapter=Neutron irradiation effects on the ITER-EDA and ITER-RC first wall/blanket materials|isbn=978-0-7803-5829-4}}
69. ^ITER homepage: Hot Cell. Iter.org. Retrieved 21 May 2013.
70. ^Innovation is Key from ITER to DEMO. Dec 2013 Porkolab. MIT The FIRE Place. (PMI=Plasma Material Interaction) Compares ITER parameters with the ARIES-ACT1 and ARIES-ACT2 designs, and has 3 slides on ADX
71. ^{{cite web| url = http://video.google.com/videoplay?docid=1996321846673788606| archiveurl = https://web.archive.org/web/20070205120020/http://video.google.com/videoplay?docid=1996321846673788606| archivedate = 2007-02-05| title = Should Google Go Nuclear? Clean, cheap, nuclear power (no, really)| author = Robert Bussard (lecturer)| accessdate =23 December 2007| date = 9 November 2006| format = Flash video| website = Google Tech Talks}}
72. ^[https://web.archive.org/web/20130119114902/http://www.youtube.com/watch?v=yhKB-VxJWpg&feature=gv Focus Fusion: The Fastest Route to Cheap, Clean Energy]. YouTube
73. ^France Wins Nuclear Fusion Plant. Deutsche Welle. Dw-world.de (28 June 2005). Retrieved 21 May 2013.
74. ^Mixed reactions to ITER | EurActiv July 2005
75. ^Lev Grossman, "A Star is Born", Time Magazine, 2 November 2015, p.29.
76. ^{{Cite news|url=https://www.iter.org/sci/Fusion|title=Advantages of fusion|newspaper=ITER|access-date=2016-10-19}}
77. ^[https://web.archive.org/web/20100630030449/http://www.stpnoc.com/Fyi.htm Facts and Stats... 1/3 of fuel rods changed every 18 months]. STPNOC.com.
78. ^{{cite web |title=Detritiation Systems at ITER |url=http://www.asn.fr/sites/tritium/fichiers/Tritium_CHAP_2-5.pdf |publisher=French Nuclear Safety Authority |year=2010 |accessdate=12 August 2014 |deadurl=yes |archiveurl=https://web.archive.org/web/20140913054421/http://www.asn.fr/sites/tritium/fichiers/Tritium_CHAP_2-5.pdf |archivedate=13 September 2014 |df=dmy-all }}
79. ^{{cite journal|doi= 10.1088/0029-5515/45/2/004|title= Demonstration tokamak fusion power station for early realization of net electric power generation|year= 2005|last1= Hiwatari|first1=R.|last2= Okano|first2=K.|last3=Asaoka|first3= Y.|last4=Shinya|first4= K.|last5=Ogawa|first5=Y.|journal= Nuclear Fusion|volume= 45|page= 96|bibcode = 2005NucFu..45...96H|issue=2}}
80. ^DOE/EIA-0623 Challenges of Electric Power Industry Restructuring for Fuel Suppliers. Eia.doe.gov (September 1998). Retrieved 21 May 2013.
81. ^{{cite web|url=http://findarticles.com/p/articles/mi_qa3650/is_200207/ai_n9093799|archiveurl=https://web.archive.org/web/20090306170520/http://findarticles.com/p/articles/mi_qa3650/is_200207/ai_n9093799|archivedate=2009-03-06|title=Worldwide power - Electric Perspectives - Find Articles at BNET|date=6 March 2009|accessdate=12 September 2018}}
82. ^{{cite web|url=http://www.sefi.unep.org/fileadmin/media/sefi/docs/publications/Exec_summary.pdf|title=GLOBAL TRENDS IN SUSTAINABLE ENERGY INVESTMENT 2008|accessdate=10 October 2010|deadurl=yes|archiveurl=https://web.archive.org/web/20110721182043/http://www.sefi.unep.org/fileadmin/media/sefi/docs/publications/Exec_summary.pdf|archivedate=21 July 2011|df=dmy-all}}
83. ^Nuclear Data for Helium Production in Fusion. (PDF). Retrieved 21 May 2013.
84. ^Commentaries on criticisms of magnetic fusion, Weston M. Stacey, Georgia Institute of Technology,March 1999
85. ^{{cite web |website= Fusion for Energy |title = Demonstration Fusion Reactors|publisher = European Joint Undertaking for ITER and the Development of Fusion Energy|url = http://fusionforenergy.europa.eu/3_4_demo_en.htm|accessdate =17 November 2008}}
86. ^{{cite web |title=EFDA-JET |url=http://www.jet.efda.org/ |publisher=EFDA |year=2009 |accessdate=29 May 2009}}
87. ^{{cite web|title=Tore Supra |url=http://www-drfc.cea.fr/gb/cea/ts/ts.htm |publisher=CEA |deadurl=yes |archiveurl=https://web.archive.org/web/20121115112229/http://www-drfc.cea.fr/gb/cea/ts/ts.htm |archivedate=15 November 2012 |df=dmy }}
88. ^{{cite web |title=Wendelstein 7-X |url=http://www.ipp.mpg.de/ippcms/eng/for/projekte/w7x/index.html |publisher=Max-Planck-Institut für Plasmaphysik |date=3 April 2009 |accessdate=29 May 2009 |deadurl=yes |archiveurl=https://web.archive.org/web/20090521173232/http://www.ipp.mpg.de/ippcms/eng/for/projekte/w7x/index.html |archivedate=21 May 2009 |df=dmy-all }}
89. ^{{cite web|url=http://www.iter.org/proj/Pages/ITERAndBeyond.aspx |title=Beyond ITER |publisher=iter.org |deadurl=yes |archiveurl=https://web.archive.org/web/20090520151601/http://www.iter.org/PROJ/Pages/ITERAndBeyond.aspx |archivedate=20 May 2009 }}
90. ^{{cite web |title=National Ignition Facility & Photon Science |url=https://lasers.llnl.gov/ |publisher=Lawrence Livermore National Laboratory |accessdate=29 May 2009}}
91. ^{{cite web |title=HiPER |url=http://www.hiper-laser.org/ |publisher=HiPER Project |year=2009 |accessdate=29 May 2009}}
92. ^{{cite web |title=MAST |url=http://www.fusion.org.uk/MAST.aspx |archiveurl=https://web.archive.org/web/20100213180559/http://www.fusion.org.uk/MAST.aspx |archivedate=2010-02-13 |publisher=Mega Ampere Spherical Tokamak |year=2010 |accessdate=1 February 2010}}
93. ^{{cite web|url=http://www-naweb.iaea.org/napc/physics/meetings/TM45256/talks/Gao.pdf |title=Physics meeting |website=www-naweb.iaea.org }}
94. ^{{cite journal|url = http://www.sciencedirect.com/science/article/pii/S0920379613005620 | doi=10.1016/j.fusengdes.2013.06.008 | volume=88 | issue=11 | title=Concept design of CFETR superconducting magnet system based on different maintenance ports | year=2013 | journal=Fusion Engineering and Design | pages=2960–2966 | last1 = Zheng | first1 = Jinxing}}
95. ^{{cite journal|url=https://ieeexplore.ieee.org/document/6716984/?tp=&arnumber=6716984&url=http://ieeexplore.ieee.org/xpls/abs_all.jsp?arnumber=6716984|title=Concept Design of CFETR Tokamak Machine|first1=Y. T.|last1=Song|first2=S. T.|last2=Wu|first3=J. G.|last3=Li|first4=B. N.|last4=Wan|first5=Y. X.|last5=Wan|first6=P.|last6=Fu|first7=M. Y.|last7=Ye|first8=J. X.|last8=Zheng|first9=K.|last9=Lu|first10=X.|last10=Gao|first11=S. M.|last11=Liu|first12=X. F.|last12=Liu|first13=M. Z.|last13=Lei|first14=X. B.|last14=Peng|first15=Y.|last15=Chen|date=1 March 2014|journal=IEEE Transactions on Plasma Science|volume=42|issue=3|pages=503–509|accessdate=12 September 2018|via=IEEE Xplore|doi=10.1109/TPS.2014.2299277}}
96. ^{{cite web|url=http://aries.ucsd.edu/LIB/MEETINGS/1302-USJ-PPS/Ye.pdf |title=Meeting info |website=aries.ucsd.edu }}

External links

{{wikinews|France secures site for 10 billion euro nuclear fusion research project}}{{Commons category|ITER}}
  • {{official website|https://www.iter.org}}
  • The New Yorker, 3 March 2014, Star in a Bottle, by Raffi Khatchadourian
  • Archival material collected by Prof. McCray relating to ITER’s early phase (1979–1989) can be consulted at the Historical Archives of the European Union in Florence
  • [https://www.youtube.com/watch?v=4RDMxKdylJw "Way to New Energy" video (23:24)] at YouTube, by RT, on 6 May 2014.
  • The roles of the Host and the non-Host for the ITER Project. June 2005 The broader approach agreement with Japan.
  • [https://www.euro-fusion.org/wpcms/wp-content/uploads/2013/01/JG12.356-web.pdf Fusion Electricity - A roadmap to the realisation of fusion energy] EFDA 2012 - 8 missions, ITER, project plan with dependencies, ...
{{fusion experiments}}{{Nuclear power in France}}

10 : Buildings and structures in Bouches-du-Rhône|Fusion power|Fusion reactors|International science experiments|Nuclear energy in France|Nuclear research institutes|Plasma physics|Proposed fusion reactors|Research projects|Tokamaks

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/23 10:19:11