请输入您要查询的百科知识:

 

词条 FS Class E.330
释义

  1. History

  2. References

{{one source|date=December 2014}}{{Infobox locomotive
|name = Class E.330
|powertype = electric
|image =Mus Scienza Tecnica loco E.330.JPG
|caption =
|builder = Società Italiana Ernesto Breda and Società Italiana Westinghouse
|serialnumber =
|buildmodel =
|builddate = 1914
|totalproduction = 16
| aarwheels = 1-C-1
| uicclass=1'C1'
|gauge = {{track gauge|sg|allk=on}}
|leadingdiameter =
|driverdiameter = {{convert|1,630|mm|in|2|abbr=on}}
|trailingdiameter =
|wheelbase =
|length ={{convert|11.008|m|ftin|frac=8|abbr=on}}
|width =
|height =
|frametype =
|weightondrivers = {{convert|51|t|abbr=on}}
|locoweight = {{convert|73|t|abbr=on}}
|electricsystem = Three-phase 3.6 kV 16.7 Hz Catenary
|collectionmethod = Bow collector
|primemover =
|enginetype =
|transmission =
|maxspeed = {{convert|100|km/h|abbr=on}}
|poweroutput = {{convert|2000|kW|abbr=on}}
|tractiveeffort = {{convert|84|kN|abbr=on}}
|factorofadhesion =
|locobrakes =
|trainbrakes =
|operator = FS
|operatorclass =
|numinclass =
|fleetnumbers =
|officialname =
|nicknames =
|locale =
|deliverydate =
|firstrundate =1914
|lastrundate =
|retiredate =1963
|restoredate =
|scrapdate =
|currentowner =
|disposition =
}}

The FS Class E.330 was a small class of three-phase electric locomotive used in Italy, introduced in the 1910s.

History

In the late 1900s, the success of the three-phase electrification on mountain lines such the Valtellina line, the Simplon Tunnel and the Giovi Pass line, led the newly formed Ferrovie dello Stato, under the direction of Riccardo Bianchi, to extend the electrification to other lines, where electric locomotives gave better performance. For the new lines to be electrified, three batches of electric locomotives were ordered, including the E.330 and the E.550 (a type E.551 was ordered but not built).

Unlike the previous electric locomotives used on mountain lines, the new locomotives had to be able to vary their speed, a capability which at the time was difficult to achieve, due to the fact that the three-phase motor spins at constant speed set by the feeding current frequency. The E.330 was designed to have four speeds (where the E.430 had only one and the contemporary E.550 two); this capability was obtained thanks to two patents by the German engineer Manu Stern and the Hungarian engineer Maurice Milch.[1] The wheel arrangement chosen was 1-C-1, similar to that adopted on the contemporary 685 class of steam locomotives.

The production contract was signed in 1913, construction of the new units beginning at Società Italiana Westinghouse, which had designed the locomotive under the direction of Kálmán Kandó. The mechanical parts were co-built with Società Italiana Ernesto Breda.

The locomotives were assigned to the Valtellina and Ligurian coast lines. The E.330s became operational in the Spring 1914. They were later used also in Lombardy on the local three-phase lines, until, from 1962, the railroads were adapted to the now standard 3,000 V direct current electrification.

All the E.330s were phased out during the 1960s.

References

1. ^{{cite journal|last=Mascherpa|first=Erminio |year=1979|title=Nascita dell'E.330|journal=Italmodel ferrovie |volume=29|issue=224-227|pages=14–22}}
{{commons category|FS E.330}}{{FS locos}}

6 : 1′C1′ locomotives|Ferrovie dello Stato Italiane electric locomotives|Railway locomotives introduced in 1914|Three-phase AC locomotives|Breda locomotives|Standard gauge locomotives of Italy

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/28 15:20:03