  1. Planning

  2. Gode Wind 1 & 2

  3. See also

  4. References

  5. External links

{{Infobox power station
| name = Gode Wind Farm
| name_official =
| image =
| image_size =
| image_caption =
| image_alt =
| location_map = North Sea
| location_map_size =
| location_map_caption = Location of the Gode projects in the North Sea
| coordinates = {{coord|54|3|0|N|7|1|48|E|type:landmark_region:DE|display=inline,title}}
| coordinates_ref =
| country = Germany
| location = North Sea
| status = O
| construction_began =
| commissioned =
| decommissioned =
| cost =
| owner = Ørsted
| operator =
| ps_units_operational = 55 (Gode Wind 1)
42 (Gode Wind 2)
| ps_units_manu_model = Siemens Wind Power: 6 MW direct-drive
| wind_hub_height =
| wind_rotor_diameter =
| wind_rated_speed =
| wind_farm_type = Offshore
| wind_offshore_depth =
| wind_offshore_distance = {{convert|40|km|abbr=on}}
| ps_electrical_capacity = 582 MW (total)
330 MW (Gode Wind 1)
252 MW (Gode Wind 2)
[1]
| ps_electrical_cap_fac =
| website =
| extra =
}}

Gode Wind 1, 2, and 3 are offshore wind farms located north-west of Norderney in the German sector of North Sea. They are owned by Ørsted.[2] Gode Wind 1 and 2 are operational, while Gode Wind 3 is being developed.

The projects were originally developed by PNE Wind AG who had received approvals for Gode Wind 1 and 2 from Germany's Federal Agency for Marine Shipping and Hydrography.[3] In August 2012, the projects were acquired by Dong Energy.[2]

Planning

The combined capacity of the three projects will be up to 900 MW.[2]

Gode 1 has a capacity of 332 MW, Gode 2 has a capacity of 252 MW, and Gode 3 will have a capacity of 316 MW.

Originally REpower Systems was to supply 54 6-MW turbines for Gode 1 and Vestas was to supply 84 3-MWturbines for Gode 2.

These deals were re-tendered by DONG Energy,[4][5] which has contracted 154 direct-drive 6MW turbines from Siemens Wind Power.[6][7]

The cable connection is 900 MW HVDC, capable of connecting other wind farms,[8] and connection to shore grid is guaranteed by TenneT.[11]

The underwater noise was monitored during construction.[9]

The platform called Dolwin Beta was installed in August 2015.[10]

Gode Wind 1 & 2

On 18 November 2013, DONG announced the decision to invest €2.2 billion in Gode 1 & 2. The wind farm is eligible for the Stauchungsmodell support regime, and the electricity price is fixed for 10 years.[11][12] Bladt Industries will supply the foundations, with a diameter of 6 meters.[13] Gode 1 & 2 consist of a total of 97 Siemens SWT-6.0-154 turbines generating up to 582 MW.[14] The projects were officially commissioned in June 2017.[15]

See also

{{stack|{{Portal|Germany|Weather|Renewable energy}}}}
  • Wind power in Germany
  • List of offshore wind farms

References

1. ^{{cite web|title=Offshore wind farm Gode Wind 2 started producing power and feeding into the grid|url=http://www.dongenergy.com/en/media/newsroom/news/articles/offshore-wind-farm-gode-wind-2-started-producing-power-and-feeding-into-the-grid|website=www.dongenergy.com|accessdate=5 July 2017}}
2. ^{{Cite news | work = Offshore.no International | publisher = Offshore Media Group | url= http://www.offshore.no/international/article/DONG_acquires_three_wind_development_projects | title = DONG acquires three wind development projects | first = Stein | last = Tjelta | date = 14 August 2012 | accessdate= 8 September 2012}}
3. ^PNE's Gode II Offshore Wind Farm Approved
4. ^{{Cite news | work = Windpower Monthly | url= http://www.windpowermonthly.com/news/rss/1147003/Dong-re-tender-Gode-Wind-projects/ | title = Dong to re-tender Gode Wind projects | first = Jan | last = Dodd | date = 1 September 2012 | accessdate= 8 September 2012}}
5. ^{{cite news |url= http://www.rechargenews.com/energy/wind/article319832.ece |title=Update: Dong to hold new turbine tender for 900MW Gode Wind trio |newspaper = ReCharge | publisher = NHST Media Group | first = Karl-Erik | last = Stromsta |date= 14 August 2012 |accessdate= 8 September 2012}}
6. ^Ben Miller. "Gunfleet Sands III officially opened" Windpower Offshore, 12 September 2013. Accessed: 26 September 2013.
7. ^Jessica Shankleman. "DONG Energy hails world's first Siemens 6MW offshore wind turbines" BusinessGreen, 12 September 2013. Accessed: 26 September 2013.
8. ^Danko, Pete. Offshore Wind Link Deals for ABB, Siemens Earth Techling, 12 August 2011. Accessed: 10 December 2011.
9. ^{{cite web|url= http://www.renewableenergyworld.com/articles/print/volume-18/issue-4/features/wind/did-you-hear-that-reducing-construction-noise-at-offshore-wind-farms.html |title=Did You Hear That? Reducing Construction Noise at Offshore Wind Farms |date=21 July 2015 |first=Dr. Federica |last=Pace |work=www.renewableenergyworld.com |accessdate=29 October 2017}}
10. ^Nå er havvind-kjempen på plass utenfor Tyskland Teknisk Ukeblad
11. ^"DONG Energy to build Gode Wind 1 and 2 offshore wind farms in Germany" DONG, 18 November 2013. Accessed: 18 November 2013.
12. ^"[https://www.wsj.com/article/PR-CO-20131118-901577.html?dsk=y Dong Energy To Build Gode Wind 1 And 2 Offshore Wind Farms In Germany]" Wall Street Journal, 18 November 2013. Accessed: 18 November 2013.
13. ^"Bladt wins XL prize at Gode Wind" reNews, 18 November 2013. Accessed: 18 November 2013.
14. ^Gode Wind 1 and 2 4C.
15. ^4COffshore. Retrieved 15th July 2017.

Gode 1, 2 and 3 on 4C.

External links

  • Photos: World's biggest WTG monopiles

3 : Offshore wind farms in the North Sea|Wind farms in Germany|Proposed wind farms

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/10 15:52:58