词条 | Hau Nui Wind Farm |
释义 |
| name = Hau Nui Wind Farm | image = Hau Nui Wind Farm stage 1 from Range Road.JPG | image_caption = The seven stage 1 turbines from Range Road | location_map = New Zealand | coordinates = {{coord|41|21|42|S|175|29|2|E|type:landmark|display=inline,title}} | coordinates_ref = | country = New Zealand | location = south-east of Martinborough, Wellington region | status = O | construction_began = | commissioned = {{start date|1996}}, 2004 | decommissioned = | cost = | owner = Genesis Energy | operator = | ps_units_operational = 15 | ps_units_manu_model = Enercon: E-40 | wind_hub_height = {{Convert|46|m|ft|0|abbr=on}} | wind_rotor_diameter = {{Convert|40|m|ft|0|abbr=on}} | wind_rated_speed = | wind_farm_type = Onshore | wind_site_elevation = | wind_site_usage = | wind_site_area = | ps_electrical_capacity = 8.65 MW | ps_electrical_cap_fac = 29.0% | ps_annual_generation = 22 GWh | website = {{URL|https://www.genesisenergy.co.nz/hau-nui-wind-farm}} }} The Hau Nui Wind Farm is a 15-turbine wind farm located approximately {{convert|21|km}} south-east of Martinborough, in the South Wairarapa District of New Zealand. Hau Nui (Māori for "big wind") was the first wind farm built in New Zealand.[1] The wind farm was built in two stages and the completed capacity is 8.65 MW.[2] SiteHau Nui wind farm is located on a ridge adjacent to White Rock Road, the main road between Martinborough and White Rock. Stage 1 is situated on Range Road near its intersection with White Rock Road. Stage 2 is located approximately one kilometre south of Stage 1 on Range Road. The site has an average wind speed of {{convert|9.2|-|9.5|m/s}}. TurbinesHau Nui has a total of fifteen Enercon E-40 wind turbines. The seven Stage 1 turbines are third-generation turbines, delivering 550 kW each. The eight Stage 2 turbines are later versions of the same Enercon E-40 model, each generating 600 kW each. The turbines in both stages are {{convert|46|m|0}} tall to the hub, and have rotor diameters of {{convert|40|m|0}}. TransmissionElectricity generated by Hau Nui is injected into the local distribution grid. The 400V electricity generated by each turbine is stepped up by transformers at the base of the turbine - to 11,000V for stage 1 turbines and 33,000V for stage 2 turbines. 33kV lines from stage 2 take electricity {{convert|24|km}} to Martinborough to supply the town. Stage 1 turbines connect to 11 kV lines to supply the local area, or connect to the Stage 2 to Martinborough 33 kV lines through a 750 kVA transformer to the north side of the stage. During peak demand, electricity generated by Hau Nui is used by Martinborough and the eastern South Wairarapa district. During off-peak, Hau Nui electricity can supply the entire South Wairarapa district via 33kV lines connecting Martinborough with Featherston, Greytown, and Pirinoa. If local demand is low, some electricity may be exported to the national grid through Transpower's Greytown substation. See also{{stack|{{Portal|New Zealand|Weather|Renewable energy}}}}
References1. ^{{cite web| url=http://www.med.govt.nz/upload/59482/00_EDF-June2008.pdf|publisher=Ministry of Economic Development| title=New Zealand Energy Data File| date=June 2008}} 2. ^{{cite web| url=http://www.windenergy.org.nz/hau-nui-wind-farm| publisher=New Zealand Wind Energy Association| title=Hau Nui Wind Farm}} External links
2 : Wind farms in New Zealand|Buildings and structures in the Wairarapa |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。