请输入您要查询的百科知识:

 

词条 IPS/UPS
释义

  1. History

  2. UPS

  3. IPS

  4. Interconnections with other systems

  5. See also

  6. References

{{Redirect|Unified Energy System||RAO UES}}{{Use dmy dates|date=May 2012}}

The IPS/UPS is a wide area synchronous transmission grid of some CIS countries with a common mode of operation and centralized supervisory control. It has an installed generation capacity of 300 gigawatts, and produces 1,200 terawatt-hours (TWh) per year for its 280 million customers. The system spans eight time zones.[1]

History

The creation of the unified power system started in 1956 by interconnecting the power systems of Center and Middle Volga. By 1978, the unified power system included all of the Soviet Union, excluding Central Asia. In addition, in 1979–1993 the power systems of Poland, German Democratic Republic, Czechoslovakia, Hungary, Romania and Bulgaria, now part of the synchronous grid of Continental Europe (ENTSO-E), operated synchronously with the Unified Power System of USSR. Central Asian countries (excluding Turkmenistan) were included to the integrated system in 2001.[1] In 2009, Uzbekistan disconnected from the system resulting also in the disconnection of Tajikistan.[2]

UPS

The Russian portion of the interconnection is known as Unified power system of Russia (UPS) ({{lang-ru|Единая энергетическая система России}}) and includes six regional transmission operators: ECO Center, ECO South, ECO North-West, ECO Middle Volga, ECO Urals and ECO Siberia. ECO East operates in isolation from UPS of Russia.

UPS of Russia came into existence as a result of Russian Federation Decision #526 dated 11 July 2001 "On the Restructuring of the Russian Federation United Energy System". Up until 1 July 2008 RAO UES operated UPS. It is currently being operated by the Federal Grid Company (FGC UES) of Russia.

IPS

The Integrated Power System (IPS). portion of the network includes the national networks of Ukraine, Kazakhstan, Kyrgyzstan, Belarus, Azerbaijan, Tajikistan, Georgia, Moldova and Mongolia.[3]

Interconnections with other systems

IPS/UPS is synchronously interconnected with the Baltic countries. In addition, it has an interlink to the Nordic system via a back to back High Voltage Direct Current (HVDC) connection in Finland with a capacity of 1420 megawatts.[4] Russia and the EU are considering unifying the IPS/UPS network with the ENTSO-E to form a single synchronous super grid spanning 13 time zones.[1]

See also

  • European Network of Transmission System Operators for Electricity (ENTSO-E)
  • SuperSmart Grid - proposal for combining ENTSO-E, IPS/UPS and some Middle east networks with smart grid capabilities
  • Super grid
  • European super grid

References

1. ^{{cite journal |url = http://www.ucte-ipsups.org/Pdf/Download/englisch/IPSUPS_Overview_Lebed.pdf |title = IPS/UPS Overview |author = Sergei Lebed |format = pdf |publisher = UCTE-IPSUPS Study presentation |date = 2005-04-20 |location = Brussels |accessdate = 2008-12-07 |page = 5 |deadurl = yes |archiveurl = https://web.archive.org/web/20110728141249/http://www.ucte-ipsups.org/Pdf/Download/englisch/IPSUPS_Overview_Lebed.pdf |archivedate = 28 July 2011 |df = dmy-all}}
2. ^{{Cite news | title = Energy blockade reportedly costs Sangtudinskaya GES-1 at US$20 mln | first = Payrav | last = Chorshanbiyev | publisher = ASIA-Plus | url = http://news.tj/en/news/energy-blockade-reportedly-costs-sangtudinskaya-ges-1-us20-mln | date = 2010-07-30 | accessdate = 2010-11-13}}
3. ^{{cite conference |title = Reliable electricity system and requested extensions towards CIS and Baltic countries, North Africa and Middle East |last = Luther |first = Matthias |conference = TEN-E Conference: Developing a Secure and Sustainable Trans European Energy Network |year = 2004 |publisher = Union for the Co-ordination of Transmission of Electricity |url = http://www.ucte-ipsups.org/Pdf/Download/englisch/TEN_E_Conference_Brussels.pdf |format = PDF |accessdate = 2008-12-12 |deadurl = yes |archiveurl = https://web.archive.org/web/20110728141323/http://www.ucte-ipsups.org/Pdf/Download/englisch/TEN_E_Conference_Brussels.pdf |archivedate = 28 July 2011 |df = dmy-all}}
4. ^{{cite book | title=Operation of Interconnected Power Systems | chapter=Interconnected systems in Europe | chapterurl=http://www.iaew.rwth-aachen.de/cms/upload/PDF/Vorlesungen/Denzel/chapter_1.2.pdf | page=16 | format=pdf | publisher= Institute for Electrical Equipment and Power Plants (IAEW) at RWTH Aachen University | last=Haubrich | first= Hans-Jürgen |author2=Dieter Denzel | date=2008-10-30 | location=Aachen | accessdate=2008-12-06 | url=http://www.iaew.rwth-aachen.de/cms/upload/PDF/Vorlesungen/Denzel/chapter_0.1.pdf}} (See "Operation of Power Systems" link for title page and table of contents.)
{{DEFAULTSORT:Ips Ups}}

4 : Wide area synchronous grids|Electric power transmission systems in Europe|Electric power transmission systems in Asia|Electric power infrastructure in Russia

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/23 1:27:28