{{Infobox power station
|name =Kanungu Power Station
|image =
|image_caption =
|location_map = Uganda
|location_map_caption=
| relief =
|country = Uganda
|location = Kanungu
| coordinates = {{coord|00|52|53|S|29|40|14|E|region:UG_type:landmark|display=inline,title}}
|owner = Eco Power Private Limited
|status = O
|ps_electrical_capacity = {{convert|6.6|MW}}
|commissioned = 18 March 2011
|decommissioned =
}}Kanungu Power Station is a {{convert|6.6|MW}} run-of-the-river hydroelectric power station on the Ishasha River in Uganda.[1] The station is sometimes referred to as the Ishasha Power Station.[1][2]

Location

The power station is in the Kanyantorogo sub-county of Kanungu District in southwestern Uganda, about {{convert|34|km}} by road from the district headquarters in the town of Kanungu, although the straight air distance is only about {{convert|12|km|0}}.[3] The geographical coordinates of the power station are: 0°52'53.0"S, 29°40'14.0"E (Latitude:-0.881389; Longitude:29.670556).[4]

The dam and weir on the Ishasha River are {{convert|500|m}} downstream from the boundary of the Bwindi Impenetrable National Park.[4] A {{convert|1140|m}} penstock takes water downstream to the twin-Francis turbine power station,[4] for a rated head of {{convert|91|m}}. A tailrace then takes water from the power station and returns it to the Ishasha River. Provision has been made for an open-pipe flow of 250 liters per second into the section of the river between the dam and the tailrace to ensure that local fish species are not adversely affected.[5] A {{convert|7|km}}, 33 kiloVolt transmission line connects the power station to the national grid.[5]

History

The power station was constructed by Eco Power Uganda Limited, a subsidiary of Eco Power Holdings Limited of Sri-Lanka. Construction was completed in March 2011.[2] The power plant was technically commissioned on 18 March 2011.[2] Political commissioning was performed on 22 November 2011.[1] The plant is expected to support development of industries and stimulate other areas of investment in Kanungu and the surrounding rural areas, including parts of the neighboring Democratic Republic of the Congo.[6]

Construction costs

The estimated cost of the dam and power plant is approximately UGX:40 billion (about US$14 million). Funding was provided by three Sri-Lankan financial institutions: National Development Bank of Sri-Lanka, Hatton National Bank, and Commercial Bank of Sri-Lanka.[6]

See also

  • List of power stations in Uganda

References

1. ^{{cite web |last=Oluka | url=http://www.monitor.co.ug/Business/Prosper/-/688616/893144/-/jfj6t2z/-/index.html | title=Uganda’s energy relief still a long way |first=Benon Herbert |newspaper=Daily Monitor | access-date=18 February 2016 |date=6 April 2010 | location=Kampala}}
2. ^{{cite web|title=Ishasha dam boosts grid supply |access-date=9 June 2018 |date=20 March 2011 | url=https://www.newvision.co.ug/new_vision/news/1014556/ishasha-dam-boosts-grid-supply |first=Patson |last=Baraire |newspaper=New Vision |location=Kampala}}
3. ^{{cite web|date=9 June 2018 | url=https://distancecalculator.globefeed.com/Uganda_Distance_Result.asp?fromplace=Ntungamo%2C%20Kanungu%2C%20Uganda&toplace=Kanungu%2C%20Uganda&dt1=ChIJQ79HpwCR3hkRUDUrr2hgUX0&dt2=ChIJNSlacVmU3hkRrvme4MUQGks |title=Distance between Ntungamo, Kanungu, Uganda and Kanungu, Uganda |access-date=9 June 2018 |author=Globefeed.com | publisher=Globefeed.com}}
4. ^{{google maps|access-date=9 June 2018 |title=Location of Kanungu Hydroelectric Power Station, Kanungu District, Uganda |url=https://www.google.com/maps/place/0%C2%B052'53.0%22S+29%C2%B040'14.0%22E/@-0.8807981,29.6722731,385m/data=!3m1!1e3!4m5!3m4!1s0x0:0x0!8m2!3d-0.8813889!4d29.6705556}}
5. ^{{cite web |author=UNFCC |url=https://cdm.unfccc.int/filestorage/G/8/U/G8UC9NJMY075P2QBIK3AW4D6LEOFZS/Ishasha%20PDD-Version%209%208Oct14_clean.pdf?t=aEl8cGEyanphfDCbrV_5TukCuNeD1MvOiL5h |title=Ishasha 6.6 MW Small Hydropower Project: Project design document |access-date=9 June 2018 |date=8 October 2014 |publisher=United Nations Framework Convention on Climate Change (UNFCC) |location=New York City}}
6. ^{{cite web|accessdate=18 February 2016 |location=Kampala | url=http://www.monitor.co.ug/News/National/-/688334/1277056/-/bgqsylz/-/index.html | title=Kanungu mini-hydro dam starts work today amid power outages |date=22 November 2011 |first=Perez | last=Rumanzi |newspaper=Daily Monitor}}

External links

  • [https://africanbusinessmagazine.com/sectors/energy/uganda-east-africas-hydro-powerhouse/ Uganda: East Africa’s hydro powerhouse] As at 10 March 2017.
  • Completed Kanungu Dam and Power Plant
{{Portalbar|Uganda|Water|Renewable energy}}{{Kanungu District|state=collapsed}}

5 : Dams completed in 2011|Energy infrastructure completed in 2011|Dams in Uganda|Hydroelectric power stations in Uganda|Kanungu District

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/30 2:14:22