请输入您要查询的百科知识:

 

词条 Kığı Dam
释义

  1. See also

  2. References

{{Infobox dam
| name = Kığı Dam
| name_official = Kığı Baraji
| image =
| image_size =
| image_caption =
| image_alt =
| location_map = Turkey
| location_map_size =
| location_map_caption =
| coordinates = {{coord|39|22|06|N|40|21|07|E|type:landmark|display=inline,title}}
| country = Turkey
| location = Bingöl
| status = Dam complete; reservoir impounding
| construction_began = 1998
| opening = 2016
| demolished =
| cost =
| owner = Turkish State Hydraulic Works
| dam_type = Embankment, rock-fill
| dam_height =
| dam_height_thalweg ={{Convert|150|m|ft|0|abbr=on}}
| dam_height_foundation={{Convert|170|m|ft|0|abbr=on}}
| dam_length =
| dam_width_crest = {{Convert|585|m|ft|0|abbr=on}}
| dam_width_base =
| dam_volume = {{Convert|23000000|m3|cuyd|0|abbr=on}}
| dam_elevation_crest =
| dam_crosses = Peri River
| spillway_count =
| spillway_type =
| spillway_capacity = {{Convert|4500|m3/s|ft3/s|0|abbr=on}}
| res_name =
| res_capacity_total = {{Convert|1200000000|m3|acre feet|0|abbr=on}}
| res_capacity_active =
| res_capacity_inactive=
| res_catchment =
| res_surface = {{Convert|8.35|km2|mi2|0|abbr=on}}[1]
| res_elevation =
| res_max_depth =
| res_max_length =
| res_max_width =
| res_tidal_range =
| plant_name = Kığı HES
| plant_coordinates = {{coord|39|18|3.76|N|40|22|17.09|E|type:landmark}}
| plant_operator =
| plant_commission = 2016 (est.)
| plant_decommission =
| plant_type =
| plant_turbines = 3 x 60 MW Francis-type
| plant_capacity = 180 MW[2]
| plant_annual_gen =
| website =
| extra =
}}Kığı Dam is a rock-fill embankment dam on the Peri River (a tributary of the Euphrates) in Bingöl Province, Turkey. Its primary purpose is hydroelectric power generation and is the first dam in the Peri River cascade, serving as the headwaters. Construction began in 1998 and is backed by the Turkish State Hydraulic Works. When commissioned, it will support a 180 MW power station. Water from the reservoir will be diverted to an underground power station downstream via an {{Convert|8.5|km|mi|abbr=on}} long tunnel.[2] In August 2015, suspected Kurdistan Workers' Party militants set fire to three cement trucks associated with the dam construction site.[3] In January 2016, the dam was completed and the reservoir began to impound water.[4]

See also

{{stack|{{Portal|Turkey|Water|Renewable energy}}}}
  • Yedisu Dam - located downstream
  • List of dams and reservoirs in Turkey

References

1. ^{{cite web|title=Bingol Regional Office|url=http://www2.dsi.gov.tr/bolge/dsi9/bingol.htm|publisher=State Hydraulic Works|accessdate=24 November 2011|language=Turkish}}
2. ^{{cite web|title=Kigi Dam and HEPP |url=http://www.ozaltin.com.tr/page.php?lang=tr&ID=205&sub&project&PID=12 |publisher=Ozaltin |accessdate=24 November 2011 |deadurl=yes |archiveurl=https://web.archive.org/web/20120508050605/http://www.ozaltin.com.tr/page.php?lang=tr&ID=205&sub&project&PID=12 |archivedate= 8 May 2012 |df= }}
3. ^{{cite news|title=PKK burned cement truck|url=http://www.ulusalkanal.com.tr/yurt/pkklilar-cimento-kamyonlarini-yakti-h35397.html|accessdate=15 February 2015|agency=Ulusal Kanal|date=26 August 2014|language=Turkish}}
4. ^{{cite news|title=Begun at the Impoundment Dam Kiğı|url=http://www.haberler.com/kigi-baraji-nda-su-tutulmaya-baslandi-8042274-haberi/|accessdate=16 February 2016|agency=Haberler|date=8 January 2016|language=Turkish}}
{{GeoGroupTemplate}}{{Dams and reservoirs in Turkey}}{{DEFAULTSORT:Kigi Dam}}{{Turkey-dam-stub}}{{Turkey-powerstation-stub}}

6 : Dams in Bingöl Province|Hydroelectric power stations in Turkey|Dams completed in 2016|Dams in the Euphrates River basin|Rock-filled dams|Dams on the Peri River

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/10 23:44:34