请输入您要查询的百科知识:

 

词条 Liffey Service Tunnel
释义

  1. Project

  2. Tunnel design

  3. References

  4. External links

{{refimprove|date=November 2017}}{{Infobox tunnel
|name = River Liffey Service Tunnel
|location = Dublin, Ireland
|coordinates =
| image = Recovery of the TBM after tunnel completion on April 17, 2008.jpg
| caption = Recovery of the TBM after tunnel completion
|startwork = 2006
|opened = 2008
|owner = Dublin City Council
|construction= Pipe Jacking
|length = 260m
|height = 2.5m ID
}}

The Liffey Service Tunnel is a service tunnel for various pipelines in Dublin, Ireland, owned by Dublin City Council.

Project

The tunnel was designed by British company Atkins[1] and constructed by a joint venture of the German contractor Züblin and the Irish contractor Cleary & Doyle of Wexford. Its construction took place from September 2006 until October 2008.{{cn|date=November 2017}}

Tunnel design

The tunnel is 260 metres long and consists of a single bore of diameter 2.96 metres. It was built in pipe-jacking using a Herrenknecht tunnel-boring machine and 2.5-metre-long precast reinforced-concrete pipes. The tunnel leads from the southern edge of the East Link Bridge, underneath the River Liffey towards the North Quay Wall, approximately 150 metres west of 3Arena. The drive and reception shafts are respectively 19 m and 22 m deep, leaving the tunnel passing approximately 8 m below the shipping channel of the river.{{cn|date=November 2017}}

{{clear}}

References

1. ^{{cite web|url=http://www.atkinsireland.ie/engineering/liffey-services-tunnel-dublin|title=Liffey Services Tunnel, Dublin|publisher=Atkins|accessdate=2017-11-29}}

External links

  • Project manager's page
{{coord|53|20|48|N|6|13|49|W|region:IE-D_type:landmark_source:kolossus-dewiki|display=title}}

2 : Tunnels in the Republic of Ireland|Tunnels completed in 2008

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/21 8:15:01