请输入您要查询的百科知识:

 

词条 Line 3 (Beijing Subway)
释义

  1. Stations (Phase I)

  2. History

  3. References

{{Infobox rail line
| name =
| other_name = M3 (planned name)
| logo = {{huge|{{rint|beijing|3}}}}
| logo_width =
| color = {{BJS color|3}}
| image = Construction site of L3 Workers' Stadium Station (20180110174056).jpg
| image_width =
| image_alt =
| caption = Construction site of Workers' Stadium station in January 2018
| type = Rapid transit
| system = Beijing Subway
| status = Under Construction (Phase I)
| locale =
| start = Dongsi Shitiao
| end = Caogezhuang North
| stations = 15 (Phase I)
| routes =
| planopen = 2022
| open =
| close =
| owner =
| operator =
| character = Fully underground[1]
| depot =
| stock =
| linelength = 21.9 km (Phase I)
| tracklength =
| gauge = {{RailGauge|1435mm}}
| speed =
| elevation =
| website =
| map = {{Beijing Subway/3}}
| map_state = collapsed
}}

Line 3 of the Beijing Subway ({{zh|s=北京地铁3号线|p=běijīng dìtiě sān hàoxiàn}}) is a rapid transit rail line under construction in Beijing.

Phase I of Line 3 is 21.9 km with 15 stations. It is fully underground.[1] It will be opened by the end of 2022[1].

Stations (Phase I)

Station NameConnectionsDistance
{{small|km
EnglishChinese
Dongsi Shitiao}}{{lang|zh-cn|东四十条}}}}beijing|2}}  
Workers' Stadium}}{{lang|zh-cn|工人体育场}}}}beijing|17}}  
Tuanjiehu}}{{lang|zh-cn|团结湖}}}}beijing|10}}  
Chaoyang Park}}{{lang|zh-cn|朝阳公园}}}}beijing|14}}  
Shifoying}}{{lang|zh-cn|石佛营}}}}   
Xinghuo railway station{{lang|zh-cn|星火站}}}}{{rint|cn|rail|link=Xinghuo railway station}} XUP}}  
Chaoyang Sports Center}}{{lang|zh-cn|朝阳体育中心}}}}   
Pingfangcun}}{{lang|zh-cn|平房村}}}}   
Dongbazhongjie}}{{lang|zh-cn|东坝中街}}}}   
Dongfeng{{lang|zh-cn|东风}}}}beijing|12}}  
Guanzhuangluxikou}}{{lang|zh-cn|管庄路西口}}}}beijing|12}}  
Louzizhuangqiao West}}{{lang|zh-cn|楼梓庄桥西}}}}   
Louzizhuang}}{{lang|zh-cn|楼梓庄}}}}   
Gaoxinzhuang}}{{lang|zh-cn|高辛庄}}}}   
Caogezhuang North}}{{lang|zh-cn|曹各庄北}}}}  

History

Line 3's route has undergone substantial changes on the planners' drawing board. In the late 1990s, one draft of the subway plan showed Line 3 running from Xiaomeichang to Cuigezhuang. Half of that route was then folded into Line 6.[4][2] In 2010 and 2011, Line 3 was mentioned in the development plans of other subway lines.[3]

  • The plan for Line 16 as of May 2011 indicated that the Ganjiakou station (formerly known as Fuwai Dajie station) will be a transfer station for Line 3.[4]
  • The plan for Line 9 as of September 2011 indicated that the Baiduizi station will be a transfer station for Line 3.[5]

By January 2012, the Line 3's western section was slated to run east from Tian Cun station in Haidian District under Fushi Road to Fuchengmen station.[6] In March 15, 2012, Line 3 was reportedly planned to run from Tian Cun station to the eastern suburbs of Beijing in Gaoxinzhuang and Pingfang and to be built by 2020.[7]

In June 2012, Beijing media reported the station plan of Line 3.[8]

In January 2013, subway planners were examining whether to extend the Line 3 through the city centre given the concentration of historic relics in the area.[9][10] In January 2014, it was reported that Line 3 will have 27 stations, with up to 16 transfer stations, including Ganjiakou station on Line 16 and Zhangzizhonglu on Line 5.[11] The station plan for Ganjiakou had been released in 2013 by Beijing Municipal Commission of Urban Planning, which depicted the Line 3 platform built over that of Line 16.[12] In February 2014, an official was quoted as saying that "Line 3 would run along Di'anmen Street, not Jingshan Front Street, with paralleling from Ping'anli to Nanluoguxiang."[13][10] Line 3 originally planned to use 6 car B type trains, but was revised to use high capacity 8 car A type trains to cope with the high passenger demand projected for the line.[14] On April 19, 2016, the first phase of Line 3 started construction.[15]

References

1. ^http://www.bjzdb.gov.cn/bjzdxmb/gdjt/2019-01/07/content_1054226.shtml
2. ^{{cite web |language=zh-hans |url=http://www.gmw.cn/content/2009-01/15/content_878748.htm |script-title=zh:北京地铁西郊线确定设五站 |publisher=The Beijing News |date=January 15, 2009}}
3. ^{{cite web |language=zh-hans |url=http://news.sina.com.cn/o/2010-03-23/022717256397s.shtml |script-title=zh:6号线一期开始“挖地道” |publisher=The Beijing News |date=2010-03-23}}
4. ^{{cite web |language=zh-hans |url=http://www.bj.xinhuanet.com/bjpd_sdzx/2011-05/06/content_22694975.htm |script-title=zh:北京地铁16号线设10个地下换乘站 |date=2010-05-06}}
5. ^{{cite web |language=zh-hans |url=http://news.sina.com.cn/c/2011-09-22/043323196458.shtml |script-title=zh:北京地铁9号线南段将空载试运行 年底有望通车 |publisher=北京晨报 |date=2011-09-22}}
6. ^{{cite web |language=zh-hans |url=http://zhengwu.beijing.gov.cn/gzdt/bmdt/t1213294.htm |script-title=zh:2015年轨道交通长度达708公里 4条“增强版”地铁线2012年开建 |publisher=Beijing Daily |date=2012-01-13}}
7. ^{{cite web |language=zh-hans |url=http://travel.people.com.cn/GB/17390635.html |script-title=zh:首都第二机场地铁或达160公里/时 新设地铁新线3号线 |publisher=The Beijing News |date=2012-03-15}}
8. ^{{cite web |language=zh-hans |url=http://www.bjnews.com.cn/news/2012/06/16/205055.html |script-title=zh:北京将再增3条新地铁 |publisher=The Beijing News |date=2012-06-16}}
9. ^{{cite web |language=zh-hans |url=http://news.xinhuanet.com/energy/2013-01/04/c_124182938.htm |script-title=zh:北京地铁3号线东段将延伸至东坝 |publisher=The Beijing Evening News |date=2013-01-04}}
10. ^{{cite web |language=zh-hans |url=http://news.xinhuanet.com/energy/2013-02/14/c_124345440.htm |script-title=zh:北京地铁3号线有望明年底开工 北京青年报 |date=2013-02-14}}
11. ^{{cite web |language=zh-hans |url=http://www.bjnews.com.cn/news/2014/01/11/301413.html |script-title=zh:京地铁3号线最快年底开建 |publisher=The Beijing News |date=2014-01-11}}
12. ^{{cite web |language=zh-hans |url=http://www.bjghw.gov.cn/web/dtfazs16/jtfa.html |script-title=zh:北京地铁16号线车站设计方案展示 |date=2013-04-25}}
13. ^{{cite web |language=zh-hans |url=http://jx.legaldaily.com.cn/content/2014-02/11/content_5263746.htm?node=34723 |script-title=zh:北京地铁17号线年内开工 2017年通到望京 |publisher=Legal Daily |date=2014-02-11}}
14. ^{{Cite web|url=http://www.morningpost.com.cn/2016/0420/1371978.shtml |script-title=zh:规划60年后 地铁3号线开工_北京_新闻中心_北京晨报网|last=lj|website=www.morningpost.com.cn|language=zh-CN|access-date=2017-05-26}}
15. ^{{Cite web|url=http://finance.ifeng.com/a/20160420/14333562_0.shtml |script-title=zh:地铁3号线开工 拟2020年通车|website=finance.ifeng.com|access-date=2017-12-28}}
{{Beijing transit}}{{Beijing Subway}}

3 : Beijing Subway lines|Proposed public transport in China|Proposed buildings and structures in Beijing

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/21 6:05:39