请输入您要查询的百科知识:

 

词条 Lone Star Wind Farm
释义

  1. References

{{Infobox power station
| name = Lone Star Wind Farm
| name_official =
| image =
| image_size =
| image_caption =
| image_alt =
| location_map = USA Texas
| location_map_size =
| location_map_caption =
| coordinates = {{coord|32|16|22.12|N|99|27|22|W|type:landmark|display=inline,title}}
| coordinates_ref =
| country =
| location =
| status =
| construction_began =
| commissioned =
| decommissioned =
| cost =
| owner =
| operator =
| ps_units_operational = 200
| ps_units_manu_model =
| wind_hub_height =
| wind_rotor_diameter =
| wind_rated_speed =
| wind_farm_type =
| wind_site_elevation =
| wind_site_usage =
| wind_site_area =
| wind_offshore_depth =
| wind_offshore_distance =
| ps_electrical_capacity = 400 MW
| ps_electrical_cap_fac =
| website =
| extra =
}}

The Lone Star Wind Farm in Shackelford and Callahan Counties in Texas was officially opened by Horizon Wind Energy in June 2008, with an installed generating capacity of 400 MW. The site's 200 Gamesa 2 MW wind turbines produce enough electricity for at least 120,000 homes, with environmental benefits claimed to be equivalent to taking about 90,000 cars off the road.[1]

References

1. ^Horizon cuts the ribbon at Lone Star wind farm {{webarchive|url=https://web.archive.org/web/20080716205451/http://energycurrent.com/index.php?id=3 |date=2008-07-16 }}
{{stack|{{Portal|Texas|Weather|Renewable energy}}}}{{Wind power in the United States}}

4 : Energy infrastructure completed in 2008|Wind farms in Texas|Buildings and structures in Callahan County, Texas|Buildings and structures in Shackelford County, Texas

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/14 2:36:24