词条 | Line 2 Bloor–Danforth |
释义 |
| name = Line 2 Bloor–Danforth | logo = {{rail-interchange|toronto|2|size=35}} | image = Old Mill TTC 9481074784.jpg | image_width = 250px | caption = Trains crossing the Humber River near {{ttcs|Old Mill}} | type = Rapid transit | system = Toronto subway | status = | locale = Toronto, Ontario | start = {{ttcs|Kipling}} | end = {{ttcs|Kennedy}} | stations = 31 (1 approved)[1] | routes = | daily_ridership = 527,640 (2018 weekday average)[2] | open = February 26, 1966 | close = | owner = Toronto Transit Commission | operator = Toronto Transit Commission | character = | depot = {{plainlist|
}} | stock = T1 | linelength = {{convert|26.2|km|mi|abbr=on}} ({{convert|7.6|km|mi|abbr=on}} extension approved) | tracklength = | tracks = | gauge = {{Track gauge|4ft10.875in}} | electrification = Third rail, 600 V DC | signalling = Automatic block signaling | speed = | elevation = | map = {{Line 2 Bloor–Danforth}} | map_state = collapsed }} Line 2 Bloor–Danforth is a subway line in the Toronto subway system, operated by the Toronto Transit Commission (TTC).[3] It has 31 stations and is {{convert|26.2|km|mi|1}} in length. It opened on February 26, 1966,[4][5] and extensions at both ends were completed in 1968 and again in 1980. The most travelled part of the line is located in Old Toronto's midtown area known as Yorkville.[6] In this area, the subway also connects to Line 1 Yonge–University at {{ttcs|Spadina}}, {{ttcs|St. George}} and Yonge stations. Towards the east, the line runs parallel to Danforth Avenue serving areas such as Greektown and the East Danforth, it then continues further to the east through a very short stretch in East York to its eastern terminus in Scarborough, where it connects to Line 3 Scarborough. To the west, the line continues along Bloor Street serving many communities such as The Annex, Bloor West Village, an extremely short stretch in York, and the area surrounding the line's western terminus located in Etobicoke. The line runs primarily a few metres north of Bloor Street from its western terminus at Kipling Avenue to the Prince Edward Viaduct east of Castle Frank Road, after which the street continues as Danforth Avenue. Just east of Main Street, the line begins to deviate northeast from Danforth Avenue and runs grade-separated until its eastern terminus, slightly east of Kennedy Road on Eglinton Avenue. The subway line is closed nightly for maintenance, when Blue Night Network bus routes serve the route.[7] NameWhen the Bloor–Danforth line, the second subway line in the city, opened in 1966, it necessitated renaming the first subway line to the Yonge line. Unofficially, the subway lines were already numbered, but in October 2013, the TTC announced plans to give the lines an official number to help riders and visitors to navigate the system. The new signage reflecting this change began being installed in March 2014, with {{ttcs|Bloor–Yonge}} and {{ttcs|St. George}} being the first two stations updated.[6][7] The subway used to be internally known as route 601.[8] Since the mid-2010s, it is publicly referred to as "Line 2 Bloor–Danforth".[9] HistoryPre-subway eraThe earliest mention of rapid transit along the Bloor–Danforth line's route was made in a 1910 report that was prepared by an American firm of transit consultants. This study had been commissioned by a special commission, which included City Controller Horatio Clarence Hocken and Mayor of Toronto Joseph Oliver. In their final report, the consultants suggested that the Prince Edward Viaduct, which spans the Don River Valley, should include a lower deck for a future subway.[10] The lower deck was built, but the first plan for a line to use it was not made until June 15, 1933, when the TTC published a report which suggested construction of a subway and an expressway broadly following Bloor Street and Danforth Avenue. The estimated cost of the project was {{CAD|120{{nbsp}}million|link=yes}}, but the plan was not implemented. Plans for a somewhat longer route, running east to west from Victoria Park Avenue to the Humber River, were proposed by the Toronto Planning Board in December 1943, although the report did not include costings.[13] During the fall of 1911, the City of Toronto put out a tender for the construction of concrete tubes to carry a subway. However, when the cost of the subway was put to a referendum, the construction of the subway tunnels was rejected.[11] Before the subway was built, the Bloor streetcar line operated along the route between Jane Street and Luttrell Avenue (located near Shoppers World Danforth). Paired PCC streetcars or multiple units (MUs) operated from 1950 to the opening of the subway line in 1966.[12] The TTC favoured this route because the Prince Edward Viaduct made it easier to build a subway across the Don Valley, and the streetcar that ran along the route was filled with passengers travelling from East York and Scarborough. To provide relief to this streetcar line and to make it easier to expand into the suburbs, the line was built under Bloor street and Danforth Avenue.[13] Subway constructionDuring the period after World War II, rapid development created a need for more public transit. A referendum on whether a subway should be constructed along Yonge Street was held on January 1, 1946, and this proposal received majority support.[14] The opening of the Yonge subway in 1954 resulted in another plan by the TTC for a Bloor–Danforth line, this time without an expressway, costing $146{{nbsp}}million. The line was approved, but was not built.[15] In the 1950s, there was intense debate over where the second Toronto subway line would run as it would affect how bus routes in Toronto's suburbs would operate.[16] There were two main plans. While both shared the same route at the outer ends, the TTC favoured a route that continued eastwards from Christie station to Pape station. This plan was championed by the TTC chairman, Allan A. Lamport, and also included an extension of the Yonge line from Union station northwards to meet the new line at St. George station. The other plan, which was proposed by the city's planning department and endorsed by the Metro Toronto chairman, Fred Gardiner, had a large "U"-shaped diversion in the centre. From Christie, it ran south to Queen Street West, and after following Queen Street eastwards to Pape Avenue, turned north to rejoin the east–west route at Pape station.[17] The eastern routing is similar to the Relief Line subway proposal of the 2010s. In 1956, Toronto's midtown area was starting to experience growth.[12] There was a public debate about the two schemes between the two chairmen and the municipalities that made up Metropolitan Toronto. The extension of the Yonge line along University Avenue, and the east–west Bloor–Danforth line extension were authorized on September 5, 1958[15] by the Ontario Municipal Board which sought a compromise between the involved communities.[18] The financing of the project was controversial. For the first time, financing was to be split between the TTC and Metro Toronto, incurring a property tax increase. This was opposed by Etobicoke, Long Branch, Mimico, New Toronto and Scarborough, who wanted the project to be funded solely by the TTC. The battle to stop the project went to the Supreme Court of Canada.[19] The University line opened in 1963, and the Bloor–Danforth line opened from Keele station in the west to Woodbine station in the east on February 26, 1966.[5] Nine men died during its construction. Most of the line is underground and built using the cut-and-cover method, with some sections built using a tunnel boring machine. Other parts of the line are above ground in grade separated rail corridors. The line was {{convert|12.9|km|mi}} long,[15] and ran about {{convert|20|to|40|m}} north of Bloor Street and Danforth Avenue.[20] The cost of the initial section was $200{{nbsp}}million[5] (${{#expr:{{inflation|CA|200|1959}}/1000}}{{nbsp}}billion in {{Inflation-year|CA}} dollars).{{inflation-fn|CA}} Once the line started full operation, construction of extensions to the Bloor–Danforth line began. The extensions to Islington station in the west and Warden station in the east opened simultaneously on May 11, 1968.[21] These were completed at a cost of $77{{Nbsp}}million[22] (${{inflation|CA|77|1968}}{{nbsp}}million in {{Inflation-year|CA}} dollars).{{inflation-fn|CA}} On November 21, 1980, the line was extended to the current terminal stations of Kipling station in the west and Kennedy station in the east at a further cost of $110 million[23][24] (${{inflation|CA|110|1980}}{{nbsp}}million in {{Inflation-year|CA}} dollars).{{inflation-fn|CA}} Subway operationsUpon opening, the Bloor–Danforth line was well received: a survey taken four months later showed that the subway was used by 10,000 riders per hour. As a result, many bus and streetcar routes were either discontinued or shortened.[25] Various bus and streetcar routes that connected to the subway stations allowed the line to continue to grow and become more sustainable.[26] The line carries an average of 503,060 passengers on weekdays during the 2015 operating year.[2] For the first six months of operation, the subway was operated as a single system, with trains from Eglinton station running through to either Keele or Woodbine station, while other trains connected the latter two points. However, the manoeuvre made operation of both lines more difficult, and the practice was abandoned after the initial trial period,[15] leaving Lower Bay station abandoned.[27] In 1971, Metro Council insisted that the zone fare system be removed to allow residents of the suburbs to travel anywhere with a single fare.[28] Prior to this, stations west of {{ttcs|Old Mill}} and east of {{ttcs|Victoria Park}} were geographically part of Zone 2 for fare purposes, but the subway used a flat fare system, so they were treated as being part of zone 1. This created problems when transferring from the subway to the buses, which were in different zones at the same location. The solution was a change in political thinking, where the subway was seen as a subsidized public service, instead of a utility that needed to balance its books.[29] On October 15, 1976, an arsonist lit a fire on a subway train at Christie station. The fire destroyed four subway cars and some wall tiles, and resulted in a section of the subway being closed for a few days.[40] On September 19, 2007, the station modernization program was started.[30] This program would result in making the subway system more accessible,[42] add new bus and streetcar platforms,[43] and improve the connections to regional buses and GO trains.[31] Stations{{Further|List of Toronto subway stations}}Kipling station, the western terminus of Line 2 Bloor–Danforth, is located near Kipling Avenue and Dundas Street West. After going east for {{convert|12|km|mi}}, it meets the University segment of Line 1 at both {{ttcs|Spadina}} and St. George stations. It also meets the Yonge Street line at Yonge station. The route's eastern terminus is located at Kennedy station, which is also the southern terminus of Line 3 Scarborough.[32] The line does not run under Bloor Street or Danforth Avenue, except at the Prince Edward Viaduct; otherwise, it is offset to the north. In some areas, it runs under parks and parking lots behind the businesses on the north side of the street, while other sections run under side streets.[33] Most stations on the Bloor–Danforth line have side platforms.[34] At the surface, some stations are designed to be a part of a shopping area, which are located above the subway.[35] Other stations are large facilities on the surface that also contain bus and/or streetcar platforms[43] to allow transfers to take place.[50] DesignsThe pre-1980 subway stations of the Bloor–Danforth line follow a two-colour background and trim theme and use the unique Toronto Subway font on the stations' walls.[36] The tiling theme was influenced by the Broad Street Subway in Philadelphia and used a cycle that was similar to the design employed on the Yonge subway.[37] This design consists of two colours for the tiles, one for main wall tiles and another for trim tiles near the ceiling of the stations. The station names on the main wall tiles use the colour of the trim tiles and vice versa, except that some of the station names of the trim tiles are white instead of the main wall tile colour for readability.[53] This pattern is based on a design similar to the stations along the University line, which follow a regular pattern with some small variances, which are the result of multiple events.[53] One of these tiling variances is located at Christie station, where some of the original tiles were replaced following the 1976 arson attack. The replacement trim tiles were differently coloured due to the lack of extra green trim tiles.[38] Other variations to the pattern can be observed at Islington and Warden stations, which both have a tricolour design. The current terminus stations of Kipling and Kennedy stations, upon initial opening in 1980, resemble the second version of Union subway station. When they opened, Kipling and Kennedy stations were the only Line 2 stations not to use the Toronto Subway font.[39] However, in late 2017, Kipling station was redesigned to use the Toronto Subway font as well, leaving Kennedy station being the sole station on Line 2 not to use the font.[40] Station modernization programAs the stations on the line have begun to show signs of aging, the TTC has initiated a station modernization program aimed at improving accessibility and appearances at several subway stations. These modernizations include new and updated wall finishes, signage, lighting and public art, as well as the installation of elevators for accessibility needs. {{ttcs|Pape}} and {{ttcs|Dufferin}} stations are the first slated for modernization under this project, and Islington will also be modernized under larger capital projects aimed at greater accessibility and reconstruction of bus loading platforms.[41][42] Construction of a second access route at Broadview station was completed in 2007. This work provided direct access to bus platforms and a new streetcar platform, improving traffic control within the station.[43] Victoria Park's modernization project was completed between 2008 and 2011 to make the station more functional, attractive, better connected to the surrounding community, and fully accessible. The second exit program was also included in station modernization projects after a fire safety audit revealed several at-risk stations with only one means of access and egress from the subway platform level to the street.[44] Some stations with only one entrance/exit received a second means of access/egress during major overhauls at stations such as Pape[45] and Dufferin.[46] Other stations such as {{ttcs|Donlands}} and {{ttcs|Greenwood}} are scheduled to receive second exits for egress only. Due to the potential for land expropriation and construction of the exit structures in residential neighbourhoods, this portion of the program has become controversial, as some houses need to be removed to accommodate these secondary exits.[47] However, plans to add a second exit for Donlands, Greenwood, and Woodbine stations have been deferred since late February 2011, due to lack of funding.[48] Fare collection{{Main|Toronto Transit Commission fares}}All types of TTC fares are accepted and sold at Line 2 stations at the on-site collector booths, while Presto cards can be purchased and loaded with money or digital monthly TTC passes via automatic fare vending machines.[49] The Presto card is accepted at all TTC subway station entrances.[50] [51] All Line 2 stations except Chester connect to surface TTC bus or streetcar routes during regular operating hours. Some connections require proof-of-payment. Valid proof-of-payment includes paper transfers – free supplementary tickets obtained at the point of entering the transit system that allow the rider to transfer to another route on a one-way continuous direction with no stopovers or backtracking permitted – and Presto cards, which provide unlimited 2-hour transfers in any direction across the TTC network.[52][53] ServiceFrequencyThe frequency for this line is 2–3 minutes during peak periods and 4–5 minutes during off-peak periods. The 300 Bloor–Danforth bus provides late-night service to the area around the stations when the subway is not in operation. This service operates frequently along Bloor Street and Danforth Avenue between East/West Mall and Kennedy station via Danforth Road, Brimley Road, Eglinton Avenue East, North/South Service Road, Transway Crescent and Kennedy Road. On Sundays, these routes operate through the early morning hours, because the subway starts service at 8:00 a.m. instead of the usual 6:00 a.m.[54] Frequency is 6–30 minutes. CapacityAs of 2016, Line 2 was running at capacity with almost 26,000 peak-hour riders. Upgraded signalling would allow for more frequent trains and expand peak-hour capacity to almost 33,000 riders by 2031.[55] Rolling stockThe first trains to operate on Line 2 were the M1-series subway trains, which were among the first subway trains to be manufactured in Canada.[56] At the time of construction, these subway cars were the longest in the world.[57] As a result of camshaft propulsion controls,[58] the increased speed provided by the M-series trains and the H-series trains allowed the Bloor–Danforth line to operate efficiently between Islington and Warden without the need for a larger subway fleet. As a result, the G-series subway trains were exclusively confined to the Yonge–University line. In the 1980s, as the H-series trains took over, the M-series trains were only used during rush hour as the trains were linked to be made up of vehicles of a single class.[56] With the introduction of the T1-series subway trains (which had been used exclusively on the Yonge–University–Spadina line during their first years of service in the late 1990s), the M1-series trains were retired from service between 1998 and 1999.[59] Due to the opening of the Bloor–Danforth line and the additional services that were required, a new set of trains were purchased from the Hawker Siddeley group. These trains, which were a part of the H series, were similar to the M1-series trains with newer features such as electrically operated doors.[60] With the introduction of the T1-series subway trains, the H1 and H2 trains were retired from service, while the remaining H4 trains (along with some earlier T1 series trains) were shifted to the Bloor–Danforth line.[61] Following the introduction of the Toronto Rocket subway trains on the Yonge–University and Sheppard lines, all of the T1-series trains were transferred to the Bloor–Danforth line, where they replaced the remaining H4- and H6-series subway trains. The T1s are now the only trains operating on the line.[62] The remaining H-4 trains were retired from revenue service throughout the fall of 2011, and the last cars were decommissioned on January 27, 2012. They were the last version of TTC trains that were not equipped with air-conditioning systems (but instead used ceiling fans); they were also the last of which to be outfitted with larger orange upholstered bench seating and were mainly used on weekdays, most often during rush hour several years before their retirement. The H-4s also had a similar interior design based from the H-2 subway cars. The H6-series trains (which had bright orange doors and panels, individual seats, along with light brown floors, cream walls and brown simulated wood grain panels) were retired from service between 2013 and 2014; the final run for the last H6-series train took place on June 20, 2014. In the summer of 2016, a few TR trains were used on Line 2 because of an air conditioning malfunction in numerous individual T1 cars, combined with a hotter than average summer. The TTC estimated that the T1 fleet's useful life would end in 2026. In 2017, the TTC planned to replace the T1 fleet with 62 new trains, possibly using the TR type from Bombardier to eliminate the time needed to prototype a different model.[81] However, in March 2019, the TTC changed tack and planned to delay the purchase of new train sets by refurbishing the T1 fleet to extend its life by 10 years. The cost of refurbishment was estimated at $715{{nbsp}}million, versus $1.86{{nbsp}}billion required to replace the T1 fleet. Refurbishment would not include installing automatic train control (ATC) equipment on the T1 fleet, while new train sets would have included this feature, and this choice will thus delay the implementation of ATC on Line 2 by 10 years. It was concurrently revealed the TTC lacked the facilities to store and maintain a new fleet as a new Kipling carhouse, which was originally planned to open in the mid-2020s, was now scheduled to open in 2031.[63][64] DepotMost trains that serve the Bloor–Danforth line are stored at the Greenwood Yard, which opened with the first segment of the line. Before the yard was built, the land was occupied by a quarry and a garbage dump. Due to its location next to the Canadian National Railway tracks, it was possible for trains to be delivered directly to the subway.[65] The CN rail tracks were converted to allow for the storage of more subway trains as the T1-series trains were shifted from Yonge–University–Spadina line to the Bloor–Danforth line.[66] In addition to providing storage for subway trains, the Greenwood yard is also used to maintain vehicles which operate on Line 3 Scarborough, as the McCowan Yard is only equipped for vehicle storage and to perform basic maintenance of vehicles.[65] The Keele Yard is a small facility located between Keele station and Dundas West station. It provides for the storage and cleaning of subway trains but not for maintenance.[67] Since June 18, 2017, the yard stores and services four trains overnight with the remaining yard capacity used to store work equipment.[68] The TTC is planning to build a new subway yard on the site of a former CPR freight yard, southwest of Kipling station. When the TTC replaces the T1 subway fleet, it will need space to store the new trains as they are delivered as well as new shops to service them. The Greenwood Yard will be inadequate as it is completely full with no room to expand, and because its facilities are optimized for 2-car train sets rather than the 6-car train sets of the proposed new fleet. The estimated cost of the new yard was $500{{nbsp}}million, of which only $7{{nbsp}}million for planning work was included in the Capital Budget as of July 2017.[69] {{as of|2017|03}}, the TTC estimated that the Kipling Yard would open in 2031.[63] Expansion plansScarborough Subway ExtensionThe Scarborough Subway Extension (SSE) is a proposal to replace Line 3 Scarborough with an eastward extension of Line 2. Earlier historyIn 1983, there was discussion of a rapid transit extension from Kennedy to Scarborough City Centre. As multiple types of technologies were examined many politicians requested a subway extension instead of the then proposed streetcar line. Instead, a medium-capacity rail system, known as the Scarborough RT was built.[70] In 2005, Toronto City Council again proposed to extend the line northeastward as a replacement for the aging Scarborough RT. In 2006, this proposal was then altered when Scarborough councillors agreed to support plans to refurbish the existing line using other light-metro options for Scarborough. Using heavy-rail rapid transit like the rest of the Toronto subway in Scarborough was not yet examined.[71] In 2007, mayor David Miller included the refurbishment of the Scarborough RT using modern light rail transit as part of his Transit City plan. During his 2010 mayoralty campaign, Rob Ford denounced the idea of light rail transit and instead proposed to replace the Scarborough RT with an extension of the Bloor–Danforth line.[72] However, on March 31, 2011, Ford agreed with the provincial government that the province's Metrolinx agency would replace the Scarborough RT with an elevated light rail line as part of a proposed "Eglinton–Scarborough Crosstown line" instead.[73] In June 2012, the idea of a Scarborough subway extension was a key part of Toronto's proposed OneCity transit plan. This plan was later rejected by the provincial government and Mayor Rob Ford.[74] Three-stop proposal{{See also|Line 3 Scarborough#Replacement with alternate transit}}On September 4, 2013, the province of Ontario announced that it would fund two-thirds of the {{convert|6.4|km|mi}} extension of the Bloor–Danforth line from Kennedy to Scarborough City Centre at Scarborough Centre station.[75] The federal government of Canada would fund the remaining one-third. Toronto City Council approved the extension by a vote of 24–20 on October 8, 2013. The subway route would extend eastward towards McCowan Road, via Eglinton Avenue and Danforth Road, and proceeding north towards the intersection of McCowan Road and Sheppard Avenue, via Scarborough City Centre. There would be three new stations at Lawrence Avenue East, Scarborough Town Centre and Sheppard Avenue East. The city would also raise property taxes annually over the next three years. Digging of the extension was expected to begin as early as 2018, with a completion within five years.[76][77] In December 2014, Councillor Glenn De Baeremaeker, one of the city's deputy mayors, proposed a fourth stop along the Scarborough subway extension, at Danforth Road and Eglinton Avenue to reduce the station spacing between Kennedy station and the next stop from about {{convert|4|km|abbr=on}} to {{convert|2|km|abbr=on}}. At that time, he was told the extra station would add $100{{nbsp}}million to $150{{nbsp}}million to the cost of the extension.[78] However, a subsequent city staff report indicated that the proposed stations at Lawrence and Sheppard avenues had "little development potential" nearby and were too close to planned SmartTrack stations.[100] In May 2018, Doug Ford – during his campaign to become premier of Ontario – pledged to work on and pay for the three-stop proposal.[79] The TTC, however, is still focusing on building the one-stop proposal. The cost of the three-stop proposal is estimated to be $4.6{{nbsp}}billion.[80] One-stop proposal{{Line 2 SSE}}On January 20, 2016, City Staff issued a proposal to eliminate two of the three stops on the planned Scarborough Subway Extension and to terminate Line 2 Bloor–Danforth at Scarborough Town Centre. The planned intermediate stop at Lawrence Avenue would be eliminated along with the proposed stretch to Sheppard Avenue. This revised plan would prevent the subway from competing for ridership with SmartTrack's branch to Markham.[81] Also, the proposed change was to reduce the cost of the extension from $3.5{{nbsp}}billion to $2.5{{nbsp}}billion, where the $1{{nbsp}}billion saved would be used to extend Line 5 Eglinton east- and northwards to University of Toronto Scarborough.[82][83][84] (However, most of the $1{{nbsp}}billion saved was subsequently diverted back to the SSE to cover additional estimated construction costs for the one-stop subway.)[85] City planning staff estimate that the peak ridership of the one-stop extension to be 7,300 in the peak hour and peak direction, about half of the 15,000 peak ridership considered the low end to justify a subway. With the original three-stop extension, the peak ridership estimate was 9,500 to 14,000; however, that estimate was reduced to 7,300 because of competition from the proposed SmartTrack and by the elimination of two of the three original stops. Mayor John Tory and Scarborough Councillor Glenn De Baeremaeker say a peak ridership of 7,300 would still be acceptable as it is still greater than the 6,000 peak at terminal station Kipling.[86] However, a Toronto Star article points out there is only one station within 6 kilometres of Scarborough Town Centre but more stations are within 6 kilometres of other terminal stations to boost ridership. The SSE would carry an estimate 31,000 riders per day as compared to 66,355 riders from Kipling to Jane (five stations) and 96,660 riders from Finch to York Mills (four stations). The SSE performs better in ridership only against the terminal of the underperforming Sheppard line.[55] In June 2016, the estimated cost of the one-stop SSE was revised from $2{{nbsp}}billion to $2.9{{nbsp}}billion because tunnels need to be deeper than expected in some places, with the new terminal station being 45 to 90 per cent deeper. An additional cost factor is that a high water table would require more concrete.[87] There is also a $300{{nbsp}}million maintenance cost to keep Line 3 Scarborough operating until the SSE's opening resulting in a total project cost of $3.2{{nbsp}}billion.[88] In February 2017, city staff reported that the estimated cost of the extension will increase by $150{{nbsp}}million to $3.35{{nbsp}}billion in order to build a 34-bay bus terminal at Scarborough Town Centre, to be the largest bus terminal on the TTC system.[89] Also, the projection for new riders for the extension has been revised downwards to 2,300 per day,[90] down from the 4,500 new riders estimated in the summer of 2016.[91] In March 2017, city staff estimated the extension will take six years to construct with an expected opening in the second quarter of 2026.[92] The project is funded.[93] On March 28, 2017, City Council approved the design of the {{convert|6.2|km|mi|adj=on}} extension via McCowan Road.[94] According to transit advocate Steve Munro, the SSE will be built to use only automatic train control (ATC). This would preclude the operation of T1 subway cars on the extension as it would be too expensive to convert T1 cars to ATC.[95] West to MississaugaThe TTC's Rapid Transit Expansion Study, published in 2001, identified three possible western extensions to the line. The first was a {{convert|3.2|km|mi|adj=on}} link to Sherway Gardens, with a station added at the East Mall at a later date. The second included an additional {{convert|1.4|km|mi}} from Sherway Gardens to Dixie Road, while a further section from Dixie Road to Mississauga City Centre, which included three stations, was considered but rejected due to cost and planning considerations.[96] This was replaced by a planned Dundas LRT run by MiWay going from Kipling to Hurontario Street, linking to the planned Hurontario LRT as part of the MoveOntario 2020 transit plan.[97] This plan was revived, along with the Jane LRT, the Finch West LRT extensions, the Waterfront LRTs, and others, by the "Feeling Congested?" report by the City of Toronto in 2013, as an "Unfunded Future Rapid Transit Project"—which means it will be constructed sometime in the future.[1] See also{{portal|Toronto Transit Commission|Toronto|Trains}}
References1. ^1 http://www.toronto.ca/legdocs/mmis/2013/pg/bgrd/backgroundfile-64550.pdf 2. ^1 {{cite web |url=https://www.ttc.ca/PDF/Transit_Planning/Subway%20ridership%20-%202018.pdf |title=Toronto Transit Commission Subway ridership – 2018 |publisher=Toronto Transit Commission |accessdate=9 March 2019}} 3. ^{{cite web |url=http://www.ttc.ca/Subway/index.jsp |title=Subway |work=Schedules & Maps |publisher=Toronto Transit Commission |quote=Line 2 Bloor–Danforth has 31 stations |accessdate=February 3, 2017}} 4. ^{{cite web |title=The TTC once knew how to move people but now we spend more time arguing than building subways |url=https://nationalpost.com/news/canada/the-ttc-once-knew-how-to-move-people-but-now-we-spend-more-time-arguing-that-building-subways |date=July 19, 2013 |work=National Post |accessdate=February 26, 2018}} 5. ^1 2 {{cite web |title=Bloor–Danforth Subway Official Opening, 1966 |url=https://www.ttc.ca/Coupler/Back_Track/More_History/50_years_ago_bloor-danforth.jsp |date=February 25, 2016 |work=TTC |accessdate=February 26, 2018}} 6. ^{{cite web |url=http://toronto.ctvnews.ca/ttc-tests-new-numerical-signage-system-1.1710500 |title=TTC tests new numerical signage system |date=March 2, 2014}} 7. ^{{Cite web |url=http://i.imgur.com/BREE2L2.jpg |title=New TTC Signage at Eglinton Station}} 8. ^Toronto Transit Commission, Scheduled Service Summary, Board Period Commencing Sunday, July 21, 1991 9. ^{{cite web |url=http://www3.ttc.ca/Subway/index.jsp |title=Subway/RT Information |publisher=Toronto Transit Commission |accessdate=February 19, 2012}} 10. ^{{cite book |title=Unbuilt Toronto: a history of the city that might have been |last=Osbaldeston |first=Mark |year=2008 |publisher=Dundurn Press |isbn=1-55002-835-9}} 11. ^{{cite web |title=Early Subway Proposals |work=Transit Toronto |date=November 10, 2006 |url=http://transit.toronto.on.ca/subway/5101.shtml |accessdate=July 31, 2012}} 12. ^1 2 {{cite journal |last1=Dewees |first1=D.N. |year=2004 |title=The effect of a subway on residential property values in Toronto |journal=Journal of Urban Economics |volume=3 |issue=4 |pages=357–369 |doi=10.1016/0094-1190(76)90035-8}} 13. ^{{cite web |title=A History of Subways on Bloor and Queen Streets |work=Transit Toronto |date=November 29, 2009 |url=http://transit.toronto.on.ca/subway/5104.shtml |accessdate=August 1, 2012}} 14. ^{{cite web |title=A History of the Original Yonge Subway |work=Transit Toronto |date=April 21, 2012 |url=http://transit.toronto.on.ca/subway/5102.shtml |accessdate=July 31, 2012}} 15. ^1 2 3 4 {{cite book |title=TTC Story: The First Seventy-Five Years |authorlink=Mike Filey |last=Filey |first=Mike |year=1996 |publisher=Dundurn Press |isbn=1-55002-244-X |page=111 |ref=harv}} 16. ^{{cite journal |last1=Kaplan |first1=Harold |year=1967 |title=The Toronto Transit Commission: A Case Study of the Structural-Functional Approach to Administrative Organizations |journal=The Canadian Journal of Economics and Political Science |volume=33 |issue=2 |pages=171–189 |publisher=Blackwell Publishing |doi=10.2307/139770 |jstor=139770}} 17. ^{{harvnb |Filey |1996 |pp=110–111}} 18. ^{{cite web |title=Land Use Planning – Ontario Municipal Board |publisher=Ministry of Municipal Affairs and Housing |url=http://www.mah.gov.on.ca/Page1755.aspx |accessdate=July 31, 2012}} 19. ^{{cite news |title=Historicist: Opposing the Subway |url=https://torontoist.com/2013/05/historicist-opposing-the-subway/ |accessdate=March 24, 2019 |work=The Torontoist |date=May 11, 2013}} 20. ^{{harvnb |Filey |1996 |p=110}} 21. ^{{cite web |title=The Abandoned Streetcar Shuttle Connection Passages |work=Transit Toronto |date=November 10, 2006 |url=http://transit.toronto.on.ca/subway/5118.shtml |accessdate=May 10, 2008}} 22. ^{{cite news |work=The Globe and Mail |title=Subway rolls to the suburbs |first=Douglas |last=Sagi |date=May 11, 1968 |p=1}} 23. ^{{cite journal |author=Filion, Pierre |year=200 |title=Balancing concentration and dispersion? Public policy and urban structure in Toronto |journal=Environment and Planning C: Government and Policy |volume=18 |issue=2 |pages=163–189 |publisher=Pion |doi=10.1068/c2m}} 24. ^{{cite web |url=https://transit.toronto.on.ca/subway/5104.shtml |title=A History Of Subways on Bloor and Queen Streets |accessdate=March 26, 2019}} 25. ^{{cite web |url=http://www.stevemunro.ca/wp-content/uploads/2006/03/BloorDanforthSuccessStory.pdf |title=The Bloor–Danforth Subway 40 Years After Opening. Why Was It So Successful? |first=Steve |last=Munro |date=March 14, 2006 |accessdate=August 1, 2012 |authorlink=Steve Munro |deadurl=yes |archiveurl=https://web.archive.org/web/20071019033127/http://www.stevemunro.ca/wp-content/uploads/2006/03/BloorDanforthSuccessStory.pdf |archivedate=October 19, 2007}} 26. ^{{cite book |title=Transport For Suburbia: Beyond The Automobile Age |last=Mees |first=Paul |year=2010 |publisher=Earthscan |location=New York, New York |isbn=978-1-84407-740-3}} 27. ^{{cite web |title=Toronto's Lost Subway Stations – Transit Toronto – Content |url=http://transit.toronto.on.ca/subway/5006.shtml |website=Transit Toronto |accessdate=November 9, 2014}} 28. ^{{cite web |title=Toronto at A Crossroads, and How It Got Here |publisher=The World Bank Group |last=Frisken |first=Frances |url=http://info.worldbank.org/etools/docs/library/115504/toronto99/assets/t-frisken-mod01.pdf |page=11 |accessdate=April 6, 2012}} 29. ^{{cite web |url=http://transit.toronto.on.ca/spare/0021.shtml |title=A history of fares on the TTC |work=Transit Toronto |date=April 21, 2012}} 30. ^{{cite web |url=http://m.ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2007/Sept_19_2007/Other/Station_Modernizatio.jsp |title=Station Modernization Program Funding Status |publisher=Toronto Transit Commission |date=September 19, 2007 |accessdate=August 1, 2012}} 31. ^{{cite web |url=http://www.urbantoronto.ca/news/2010/08/kipling-subway-stations-east-entrance-its-way |title=Kipling Subway Station's East Entrance On Its Way |first=Craig |last=White |date=August 5, 2010 |work=urbantoronto.ca |accessdate=August 1, 2012}} 32. ^{{cite web |title=Subway/RT Map |publisher=Toronto Transit Commission |url=http://www.ttc.ca/Subway/interactivemap.jsp |accessdate=July 31, 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20120805074213/http://www.ttc.ca/Subway/interactivemap.jsp |archivedate=August 5, 2012}} 33. ^{{cite map |publisher=North York : Metro Corporate and Human Resources |title=Transit stations, Metropolitan Toronto [cartographic material] / Metro Corporate and Human Resources |date=April 1996 |scale=1:62,500 |accessdate=July 31, 2012}} 34. ^{{cite web |url=http://www.balancefba.org/living/oandm/bloor_danforth.html |title=Bloor–Danforth Subway Line |publisher=Balance for Blind Adults |accessdate=August 3, 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20111009063845/http://www.balancefba.org/living/oandm/bloor_danforth.html |archivedate=October 9, 2011 |df=mdy-all}} 35. ^{{cite web |url=http://www.bloor-yorkville.com/Finding-Us.aspx |title=Finding Us Line |publisher=Bloor-Yorkville BIA |accessdate=August 3, 2012}} 36. ^{{cite web |url=http://transit.toronto.on.ca/archives/data/200503251440.shtml |last=LeBlanc |first=Dave |title='Subway Chic' Inspires Graphic Designers |work=The Globe and Mail |date=March 25, 2005 |accessdate=April 5, 2012}} 37. ^{{cite web |last=Brader |first=Mark |url=http://transit.toronto.on.ca/subway/5009.shtml |title=An Essay on Original Subway Station Design |work=Transit Toronto |date=January 10, 2008 |accessdate=July 28, 2012}} 38. ^1 {{cite web |last=Erret |first=Joshua |url=http://torontoist.com/2005/11/at_christie_its/ |title=At Christie, It's Two-Parts Escalator and One-Part Stairs |work=Torontoist |date=November 16, 2005 |accessdate=April 5, 2012}} 39. ^1 2 {{cite web |last=Blackett |first=Matthew |url=http://spacingtoronto.ca/2008/03/25/ride-the-rainbow-of-bloor-danforth/ |title=Ride the Rainbow of the Bloor–Danforth |work=Spacing Toronto |date=March 25, 2008 |accessdate=April 5, 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20111130054941/http://spacingtoronto.ca/2008/03/25/ride-the-rainbow-of-bloor-danforth/ |archivedate=November 30, 2011 |df=mdy-all}} 40. ^https://transit.toronto.on.ca/subway/stations/002-bloor-danforth-subway/kipling.shtml 41. ^1 {{cite web |url=http://www3.ttc.ca/Service_Advisories/Construction/Pape_Station.jsp |title=Service Advisories – Pape Station |publisher=Toronto Transit Commission |accessdate=February 19, 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20120404020702/http://www3.ttc.ca/Service_Advisories/Construction/Pape_Station.jsp |archivedate=April 4, 2012}} 42. ^{{cite web |url=http://www3.ttc.ca/Service_Advisories/Construction/Dufferin_Station_Modernization.jsp |title=Service Advisories – Dufferin Station Modernization |publisher=Toronto Transit Commission |accessdate=February 19, 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20120404020706/http://www3.ttc.ca/Service_Advisories/Construction/Dufferin_Station_Modernization.jsp |archivedate=April 4, 2012}} 43. ^1 2 {{cite web |url=http://swanboatsteve.wordpress.com/2007/12/18/broadview-station-the-end-is-nigh |title=Broadview Station: The End Is Nigh? |authorlink=Steve Munro |last=Munro |first=Steve |date=December 18, 2007 |accessdate=June 19, 2012 |archivedate=March 4, 2015 |archiveurl=https://web.archive.org/web/20150304003611/http://stevemunro.ca/2007/12/18/broadview-station-the-end-is-nigh/ |deadurl=no}} 44. ^{{cite web |url=http://www.toronto.ca/legdocs/mmis/2010/gm/bgrd/backgroundfile-32726.pdf |title=Real Estate Acquisitions – TTC Woodbine Station –Easier Access and Second Exit Program |date=July 28, 2010 |publisher=City of Toronto |accessdate=June 21, 2012}} 45. ^{{cite web |url=http://www.ttc.ca/Service_Advisories/Construction/Pape_Station.jsp |title=Pape Station Modernization Project |publisher=Toronto Transit Commission |accessdate=June 25, 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20120711125121/http://www.ttc.ca/Service_Advisories/Construction/Pape_Station.jsp |archivedate=July 11, 2012}} 46. ^{{cite web |url=http://www.ttc.ca/Service_Advisories/Construction/Dufferin_Station_Modernization.jsp |title=Dufferin Station Modernization Project |publisher=Toronto Transit Commission |year=2010 |accessdate=June 25, 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20120509053846/http://ttc.ca/Service_Advisories/Construction/Dufferin_Station_Modernization.jsp |archivedate=May 9, 2012}} 47. ^{{cite news |url=https://www.thestar.com/news/gta/ttc/article/830325--residents-protest-demolishing-homes-for-subway-exits |location=Toronto |work=The Star |first=Carola |last=Vyhnak |title=Residents protest demolishing homes for subway exits |date=June 29, 2010}} 48. ^{{cite news |url=https://www.thestar.com/news/article/945553--ttc-slams-door-on-second-exit-at-donlands-subway |location=Toronto |work=Toronto Star |first=John |last=Goddard |title=TTC slams door on second exit at Donlands subway |date=March 2, 2011 |accessdate=June 19, 2012}} 49. ^{{cite web |url=http://www3.ttc.ca/Fares_and_passes/Prices/Buying_tickets_tokens_and_passes.jsp |title=Buying Tickets, Tokens and Passes |publisher=Toronto Transit Commission |accessdate=July 6, 2012}} 50. ^{{cite web |url=http://www3.ttc.ca/Fares_and_passes/Fare_information/Presto_Fare_System/index.jsp |title=TTC PRESTO Fare System |publisher=Toronto Transit Commission |accessdate=July 6, 2012}} 51. ^{{cite web |last=Kretzel |first=Lasia |date=July 5, 2012 |url=http://news.nationalpost.com/2012/07/05/ttc-set-to-spend-570k-to-put-debit-machines-in-collector-booths/ |title=TTC set to spend $570K to put debit machines in collector booths |work=The National Post |accessdate=July 6, 2012}} 52. ^1 {{cite web |url=http://www3.ttc.ca/WheelTrans/Paying_the_Fare/index.jsp |title=Paying the Fare |publisher=Toronto Transit Commission |accessdate=August 1, 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20120716015939/http://www3.ttc.ca/WheelTrans/Paying_the_Fare/index.jsp |archivedate=July 16, 2012}} 53. ^{{cite web|url=http://www3.ttc.ca/Fares_and_passes/Fare_information/Transfers/index.jsp|title=Transfers|publisher=Toronto Transit Commission|accessdate=June 25, 2012}} 54. ^1 {{cite web |title=Blue Night Network Map |publisher=Toronto Transit Commission |url=http://www3.ttc.ca/images/fixedImages/TTC-bluenight.pdf |accessdate=July 31, 2012}} 55. ^1 {{cite news |url=https://www.thestar.com/news/gta/2016/06/16/putting-scarborough-subway-claims-to-the-test.html |title=Putting Scarborough subway claims to the test |newspaper=Toronto Star |author1=Jennifer Pagliaro |author2=Ben Spurr |date=June 16, 2016 |accessdate=June 16, 2016}} 56. ^1 {{cite web |url=http://transit.toronto.on.ca/subway/5502.shtml |title=The Montreal Series (M-1) Cars (1963–1999) |date=February 16, 2011 |work=Transit Toronto |accessdate=June 27, 2012}} 57. ^{{cite web |url=http://www.hcry.org/collection_1961_5300.html |title=Toronto Transit Commission 5300–5301 |publisher=Halton County Radial Railway |accessdate=June 27, 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20090910051705/http://www.hcry.org/collection_1961_5300.html |archivedate=September 10, 2009 |df=mdy-all}} 58. ^{{cite web |last=Muc |first=A.M. |url=http://www.rhsc.ca/TransEMF.pdf |title=Electromagnetic Fields Associated With Transportation Systems |publisher=Radiation Health and Safety Consulting |accessdate=June 27, 2012}} 59. ^{{cite web |url=http://transit.toronto.on.ca/subway/5602.shtml |title=Montreal Series Retirement Charter – February 28, 1999 |work=Transit Toronto |date=February 16, 2011 |accessdate=June 27, 2012}} 60. ^{{cite web |url=http://transit.toronto.on.ca/subway/5503.shtml |title=The Camshaft Control Hawkers (Series H1, H2, H3 and H4) |date=June 16, 2012 |work=Transit Toronto |accessdate=June 27, 2012}} 61. ^{{cite web |url=http://transit.toronto.on.ca/subway/5505.shtml |title=The T-1 (Toronto) Series Cars (1997–?) |work=Transit Toronto |date=March 4, 2012 |accessdate=June 28, 2012}} 62. ^{{cite web |url=http://stevemunro.ca/2012/01/26/goodbye-to-the-h4-trains/ |last=Munro |first=Steve |title=Goodbye to the H4 Trains |date=January 26, 2012 |accessdate=June 28, 2012 |authorlink=Steve Munro |archivedate=March 4, 2015 |archiveurl=https://web.archive.org/web/20150304012033/http://stevemunro.ca/2012/01/26/goodbye-to-the-h4-trains/ |deadurl=no}} 63. ^1 {{cite news |url=https://www.thestar.com/opinion/star-columnists/2019/03/24/relief-is-a-long-way-off-for-riders-on-the-bloor-danforth-subway.html |title=Relief is a long way off for riders on the Bloor-Danforth subway |newspaper=Toronto Star |first=Edward |last=Keenan |date={{date|2019-03-24|mdy}} |accessdate={{date|2019-03-26|mdy}}}} 64. ^{{cite web |url=https://stevemunro.ca/2019/03/18/ttc-2019-fleet-capacity-plans-part-i-subway/ |title=TTC 2019 Fleet and Capacity Plans Part I: Subway |publisher=Steve Munro |first=Steve |last=Munro |date={{date|2019-03-18|mdy}} |accessdate={{date|2019-03-26|mdy}} }} 65. ^1 {{cite web |url=http://transit.toronto.on.ca/subway/5302.shtml |title=The Greenwood Subway Yards |work=Transit Toronto |date=June 7, 2011 |accessdate=July 24, 2012}} 66. ^{{cite web |url=http://www3.ttc.ca/About_the_TTC/Commission_reports_and_information/Commission_meetings/2012/June_29/Reports/Chief_Executive_Offi.pdf |title=Chief Executive Officer's Report (April 1 – April 28, 2012) |date=June 29, 2012 |publisher=Toronto Transit Commission |accessdate=July 24, 2012}} 67. ^{{cite web |url=http://transit.toronto.on.ca/subway/5303.shtml |title=The Vincent Subway Yards |work=Transit Toronto |date=November 10, 2006 |accessdate=July 24, 2012}} 68. ^{{cite web |url=https://swanboatsteve.files.wordpress.com/2017/06/20170524_ttc-notice-keele-yard.pdf |title=Keele Yard reopens to operation |publisher=Toronto Transit Commission |date={{date|2017-05-24|mdy}} |accessdate={{date|2017-06-04|mdy}} }} 69. ^1 {{cite web |url=https://stevemunro.ca/2017/07/13/ttc-board-discovers-cost-of-bloor-danforth-subway-renovation/ |title=TTC Board "Discovers" Cost of Bloor–Danforth Subway Renovation |publisher=Steve Munro |first=Steve |last=Munro |date={{date|2017-07-13|mdy}} | accessdate={{date|2017-07-15|mdy}} }} 70. ^{{harvnb |Filey |1996 |p=137}} 71. ^{{cite journal |author=York University |title=Three 'model schools' reimagine their role with York's help |journal=YFile |date=August 29, 2006 |url=http://yfile.news.yorku.ca/2006/08/29/three-model-schools-reimagine-their-role-with-york%E2%80%99s-help/ |accessdate=June 19, 2012 |deadurl=yes |archiveurl=https://web.archive.org/web/20160107083407/http://yfile.news.yorku.ca/2006/08/29/three-model-schools-reimagine-their-role-with-york%E2%80%99s-help/ |archivedate=January 7, 2016 |df=mdy-all}} 72. ^{{cite news |url=http://www.cbc.ca/canada/toronto/story/2010/12/01/toronto-ford.html |work=CBC News |title=Rob Ford: 'Transit City is over' |date=December 1, 2010 |deadurl=yes |archiveurl=https://web.archive.org/web/20101205051232/http://www.cbc.ca/canada/toronto/story/2010/12/01/toronto-ford.html |archivedate=December 5, 2010}} 73. ^{{cite web |url=http://news.ontario.ca/opo/en/2011/03/ontario-and-toronto-moving-forward-on-public-transit.html |title=Ontario And Toronto Moving Forward On Public Transit |publisher=Ontario Newsroom |date=March 31, 2011}} 74. ^{{cite news |url=http://www.cbc.ca/news/canada/toronto/story/2012/06/29/toronto-ontario-not-backing-onecity.html |work=CBC News |title=Toronto's OneCity transit plan rejected by province |date=June 29, 2012 |accessdate=July 7, 2012}} 75. ^{{cite news |url=http://news.ontario.ca/mto/en/2013/09/province-to-extend-bloor-danforth-subway-line.html |work=MTO |title=Province To Extend Bloor–Danforth Subway Line |date=September 4, 2013 |accessdate=September 4, 2013}} 76. ^Scarborough subway route still in debate 77. ^City Council votes in favour of Scarborough subway 78. ^{{cite news |url=https://www.thestar.com/news/city_hall/2014/12/23/deputy_mayor_glenn_de_baeremaeker_wants_to_change_scarborough_subway_plan.print.html |title=Deputy Mayor Glenn De Baeremaeker wants to change Scarborough subway plan |newspaper=Toronto Star |author=Daniel Dale |date=December 13, 2014 |accessdate=November 20, 2015}} 79. ^{{Cite news |url=https://toronto.citynews.ca/2018/05/09/doug-ford-scarborough-subway-plan/ |title=Doug Ford wants to return to 'original' Scarborough subway plan |newspaper=CityNews |author=News Staff |date=May 9, 2018 |accessdate=July 6, 2018}} 80. ^{{Cite news |url=https://www.thestar.com/news/city_hall/2018/07/06/design-changes-to-scarborough-subway-come-with-unknown-costs.html |title=Design changes to Scarborough subway come with unknown costs |newspaper=Toronto Star |author=Jennifer Pagliaro |date=July 6, 2018 |accessdate=July 6, 2018}} 81. ^{{cite news |url=https://www.thestar.com/news/gta/transportation/2016/01/20/revised-scarborough-subway-plan-eliminates-2-stations.html |title=New Scarborough transit plan 'buys peace in the land' |newspaper=Toronto Star |first=Jennifer |last=Pagliaro |date=January 20, 2016 |accessdate=January 20, 2016}} 82. ^1 {{cite news |url=http://www.cp24.com/news/new-plan-for-scarborough-subway-will-allow-city-to-get-on-with-project-tory-1.2746220 |title=New plan for Scarborough subway will allow city to 'get on' with project: Tory |newspaper=CablePulse 24 |first=Chris |last=Fox |date=January 21, 2016 |accessdate=January 21, 2016}} 83. ^{{cite news |url=https://www.theglobeandmail.com/news/toronto/major-revamp-of-contentious-scarborough-subway-plan-includes-fewer-stops/article28280303/ |title=Scarborough subway would shrink under plan to extend Eglinton Crosstown |newspaper=The Globe and Mail |first1=Oliver |last1=Moore |first2=Marcus |last2=Gee |date=January 20, 2016 |accessdate=January 20, 2016}} 84. ^ 85. ^{{cite news |url=https://www.theglobeandmail.com/news/toronto/toronto-city-council-shows-support-for-scarborough-subway-expansion/article30910103/ |title=Toronto City Council approves planning for raft of transit projects |newspaper=The Globe and Mail |first=Oliver |last=Moore |date=July 13, 2016 |accessdate=July 14, 2016}} 86. ^{{cite news |url=https://www.thestar.com/news/city_hall/2016/06/01/shrunken-scarborough-subway-ridership-projections-a-huge-concern.html |title=Mayor Tory defends Scarborough subway extension despite new ridership data |newspaper=Toronto Star |first1=Ben |last1=Spurr |first2=Jennifer |last2=Pagliaro |date=June 1, 2016 |accessdate=June 1, 2016}} 87. ^{{cite news |url=https://www.theglobeandmail.com/news/toronto/scarborough-subway-cost-rises-by-900-million/article30499113/ |title=Scarborough subway cost rises by $900-million |newspaper=The Globe and Mail |first=Oliver |last=Moore |date=June 17, 2016 |accessdate=June 17, 2016}} 88. ^{{cite news |url=https://www.thestar.com/news/gta/2016/10/05/scarborough-subway-might-already-be-off-track.html |title=Scarborough subway might already be off track |newspaper=Toronto Star |first=Ben |last=Spurr |date=October 5, 2016 |accessdate=October 5, 2016}} 89. ^{{cite news |url=https://www.thestar.com/news/city_hall/2017/02/28/cost-of-scarborough-subway-extension-rises-to-335b.html |title=Cost of Scarborough subway extension rises to $3.35{{nbsp}}billion as number of new riders fall |newspaper=Toronto Star |first1=Ben |last1=Spurr |first2=Jennifer |last2=Pagliaro |date=February 28, 2017 |accessdate=March 2, 2017}} 90. ^{{cite news |url=https://www.theglobeandmail.com/news/toronto/scarborough-subway-will-cost-more-but-attract-fewer-people-reports-find/article34159618/ |title=Scarborough subway will cost more but attract fewer people, reports find |newspaper=The Globe and Mail |first=Oliver |last=Moore |date=February 28, 2017 |accessdate=March 2, 2017}} 91. ^{{cite news |url=https://www.thestar.com/news/gta/2016/06/02/priority-should-be-alternative-transit-routes-into-downtown-keenan.html |title=Priority should be alternative transit routes into downtown: Keenan |newspaper=Toronto Star |first=Edward |last=Keenan |date=June 2, 2016 |accessdate=June 5, 2016}} 92. ^{{cite news |url=https://www.thestar.com/news/city_hall/2017/03/15/subway-lrt-srt-what-we-know-about-transit-in-scarborough.html |title=Subway, LRT, SRT? What we know about transit in Scarborough |newspaper=Toronto Star |first=Jennifer |last=Pagliaro |date=March 15, 2017 |accessdate=March 29, 2017}} 93. ^{{cite news |url=https://www.thestar.com/news/gta/2016/06/26/mayor-john-torys-transit-priorities-face-financial-political-challenge-analysis.html |title=Mayor John Tory's transit priorities face financial, political challenge: analysis |newspaper=Toronto Star |first1=Ben |last1=Spurr |first2=Jennifer |last2=Pagliaro |date=June 26, 2016 |accessdate=July 20, 2016}} 94. ^{{cite news |url=https://www.thestar.com/news/city_hall/2017/03/28/council-discuss-next-steps-on-scarborough-subway-extension.html |title=Scarborough subway moves forward as Tory rejects value-for-money analysis |newspaper=Toronto Star |first=Jennifer |last=Pagliaro |date=March 28, 2017 |accessdate=March 29, 2017}} 95. ^{{cite web |url=https://stevemunro.ca/2016/10/04/ttc-capital-program-review/ |title=TTC Capital Program Review |first=Steve |last=Munro |authorlink=Steve Munro |date=October 4, 2016 |accessdate=October 5, 2016}} 96. ^{{cite web |url=http://transit.toronto.on.ca/archives/reports/rtes2002.pdf |title=Rapid Transit Expansion Study |author=Toronto Transit Commission |date=August 2001 |pages=8–9 |accessdate=June 19, 2012 |ref=harv}} 97. ^{{cite web |url=http://www.mississauga.ca/file/COM/Hurontario-Main_LRT_Project.pdf |title=Hurontario-Main LRT Project |author=City of Missisauga |date=March 14, 2012 |accessdate=July 31, 2012 |ref=harv}} External links{{Commons category}}{{Attached KML |display=title,inline}}
3 : Toronto rapid transit|Railway lines opened in 1966|4 ft 10⅞ in gauge railways |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。