请输入您要查询的百科知识:

 

词条 Munich–Augsburg railway
释义

  1. History

     Upgrade  Dates and facts 

  2. Operations

  3. References

  4. External links

{{Infobox rail line
| name = Munich–Augsburg railway
| routenumber = 980, 999.3, 999.4
| linenumber = * 5503 (Munich–Augsburg)
  • 5543 (Munich–Mammendorf)
  • 5581 (Olching–Augsburg)

| owner = DB Netz
| linelength_km = 61.9
| gauge = {{Track gauge|sg|allk=on}}
| electrification = 15 kV/16.7 Hz AC catenary
| speed = {{Convert|230|km/h|mph|abbr=on}} (maximum)
| tracks = 4 or more
| locale = Bavaria, Germany
| map ={{Routemap|inline=1 |title =no |footnote = Source: German railway atlas[1]|map=

STR\\STR\\STR~~ ~~ ~~from Nuremberg, from Ulm

DST\\BHF\\BHF~~61.9~~Augsburg Hbf

SBRÜCKEa\\SBRÜCKEm\\SBRÜCKEe~~ ~~Gögginger Brücke~~(planned station)

STRr!~KRWl\\KRWg+r\\STR~~ ~~ ~~to Buchloe

\\ABZgr\\STR~~ ~~ ~~and Landsberg am Lech

BS2c2\\BS2lr\\BS2r

HST\\HST~~60.2~~Augsburg Haunstetterstraße

WBRÜCKE1\\WBRÜCKE1~~ ~~ ~~Lochbach

BRÜCKE1\\BRÜCKE1~~ ~~ ~~B 300

WBRÜCKE1\\WBRÜCKE1~~ ~~ ~~Spitalbach

STR\\ABZgl~~ ~~ ~~Augsburg local railway freight railway

STR\\eHST~~59.1~~Augsburg-Spickel~~(closed 1974)

WBRÜCKE1\\WBRÜCKE1~~ ~~ ~~Augsburg Eiskanal

hKRZWae\\hKRZWae~~ ~~ ~~Lech

BS2+l\\BS2+lc\\BS2+r

HST\\DST\\BHF~~56.9~~Augsburg-Hochzoll~~Keilbahnhof

STR\\STR\\STRl~~ ~~ ~~Paar Valley Railway to Ingolstadt

BS2l\\BS2lc\\BS2c3

BHF\\STR~~52.0~~Kissing

HST\\STR~~48.0~~Mering-St Afra

WBRÜCKE1\\WBRÜCKE1~~ ~~ ~~Paar

BHF\\STR~~46.1~~Mering

d\\dSTRr+1h\\BS2+rc\\BS2+r~~Ammersee Railway to Weilheim

\\HST\\STR~~39.8~~Althegnenberg

\\BHF\\STR~~36.7~~Haspelmoor

KSBHFa\\BHF\\STR~~31.0~~Mammendorf~~(beginning of {{ÖPNV München|S3|10}})

SHST\\STR\\STR~~27.8~~Malching (Oberbayern)

SBHF\\STR\\DST~~24.8~~Maisach~~(S-Bahn double track)

SHST\\STR\\STR~~21.6~~Gernlinden

SHST\\STR\\STR~~20.4~~Esting

SBHF\\DST\\DST~~19.0~~Olching

STR\\KRWg+l\\KRWgr

eKRZu\\eKRZu\\xABZql~~ ~~ ~~Munich North Ring

SHST\\STR\\~~15.6~~Gröbenzell

SBHF\\DST\\~~12.3~~Munich-Lochhausen

BRÜCKE1\\BRÜCKE1\\~~ ~~ ~~A 99

SHST\\STR\\~~10.0~~Munich-Langwied

KRZo\\KRZo\\STR+r~~ ~~ ~~from Munich-Pasing Bbf

ABZg+r\\STR\\STR~~ ~~ ~~{{BSsplit|flying junction of the Allgäu Railway| from Buchloe}}

ABZg+r\\ABZg+l\\STRr~~ ~~ ~~from Herrsching

STR\\ABZgl\\STR+r~~ ~~ ~~and from Garmisch-Partenkirchen

WBRÜCKE1\\WBRÜCKE1\\WBRÜCKE1~~ ~~ ~~Würm

S+BHF\\BHF\\DST~~7.4~~München-Pasing~~ ~~{{Höhe|527}}

STR\\ABZgl\\ABZg+l~~ ~~ ~~to/from München-Pasing freight yard

STR\\STR\\STRl~~ ~~ ~~to München-Laim marshalling yard

ABZg2\\STR3u\\~~ ~~ ~~(flying junction of the S-Bahn)

ABZg+1u\\STR2+4\\STR3u+l~~ ~~ ~~from Ingolstadt, from Regensburg

STR\\STR+1u\\STR+4

STR\\STR\\ABZg+l~~ ~~ ~~S-Bahn from Petershausen and Freising

STR\\STR\\SBHF~~4.1~~München-Laim

KRZo\\KRZo\\KRZo~~ ~~ ~~Munich South Ring

STR\\STR\\SHST~~2.8~~München Hirschgarten

ABZg+r\\STR\\STR~~2.2~~ ~~from ICE-Werk München

STR\\KRWgl\\KRWg+r~~2.0~~München-Neuhausen junction

ABZg+r\\STR\\STR~~ ~~ ~~from Rosenheim

KRZo\\KRZo\\ABZg+r~~ ~~ ~~from Holzkirchen

STR\\STR\\SBHF~~1.6~~München Donnersbergerbrücke

STR\\STR\\SBHF~~0.8~~München Hackerbrücke

STR\\STR\\tSTRa~~ ~~ ~~{{BSsplit|City Tunnel entrance|(S-Bahn trunk line)}}

KBHFe\\KBHFe\\tSHST~~0.0~~Munich Hbf

\\\\tSTR~~ ~~ ~~to Munich East


}}
}}

The Munich–Augsburg line connects Munich and Augsburg in the German state of Bavaria. It was built by the Munich-Augsburg Railway Company and opened in 1840. It was nationalised in 1846 and extended to Ulm in 1854. The line between Augsburg and Munich is a major traffic axis and part of the Magistrale for Europe from Budapest through Vienna to Paris.

History

{{main|Munich-Augsburg Railway Company}}

The line was built by the Munich-Augsburg Railway Company (German: München-Augsburg Eisenbahn-Gesellschaft) and opened in 1839 and 1840. The Munich-Augsburg Railway Company was nationalised on 1 June 1846 and taken over by the Royal Bavarian State Railways (Königlich Bayerische Staats-Eisenbahnen). The line became part of Bavarian Maximilian’s Railway (Bayerische Maximiliansbahn) and was extended to Ulm on 1 May 1854. After the nationalisation of the line in 1846 a new Augsburg station was built at Rosenauberg along with new rail facilities in nearby Oberhausen. The old stations at the Roten Tor (Red Gate) and in Oberhausen were abandoned.[2]

Between 26 June 1965 and 3 October 1965, two pairs of trains per day using Class E 03 locomotives ran at 200 km/h on the line for the 1965 International Transport Exhibition in Munich, taking 26 minutes to complete the run. From May 1968 two trains, "Blauer Enzian" and "Rheinblitz", ran on the same route at a scheduled speed of 200 km/h.

In 1977 the 42.7 km long section between Lochhausen and Augsburg-Hochzoll, was put into operation with a regular permitted speed of 200 km/h. For the first time in Germany numerous trains could reach this speed in regular commercial operations.

Upgrade

The 43 km section between Augsburg and Olching line was rebuilt to four-tracks between 1998 and 2011 to carry significantly more traffic. One pair of tracks was dedicated to regional services (RB, RE) and goods traffic and the other to (IC/EC) and high-speed traffic (ICE) services. Heavy and more slowly running freight trains no longer obstruct the passage of faster ICEs. The permitted speed on the high-speed tracks is now 230 km/h.[3] Infrastructure for regional trains allows operations at 160 km/h.[3] On the line between Olching and Munich, freight, regional trains, and the Munich S-Bahn have their own tracks.

The railway upgrading work was divided into six sections for planning purposes. Work began on the western section between Augsburg and Kissing in February 1998[4] and the new tracks were brought into service in 2003. A new bridge was built over the Lech in Augsburg in 2002 and in the same year work began on the eastern section between Mering and Olching.

On 6 June 2011, the conversion of the line to four-track operation was completed,[5] but the two high-speed tracks were not yet passable at 230 km/h. On 10 December 2011 the railway was dedicated with a new speed limit of 230 km/h after 13 years of building.[6]

Dates and facts

  • Length of the Augsburg–Munich line: {{convert|61|km|mi|sigfig=2|abbr=on}}
  • Length of the line being upgraded: {{convert|44|km|mi|sigfig=2|abbr=on}}
  • Line speed: {{convert|230|km/h|mph|sigfig=2}} for ICE traffic; {{convert|160|km/h|sigfig=2}} for regional and goods traffic
  • Completion date: 2011

The upgrading involved: acquisition of 95.3 hectares of land, 43 km of additional railway embankment, 7.5 km of new retaining walls, 116 km of new track and 104 points moved, 52 railway and 19 road bridges reconstructed or adapted, 46 km of noise barriers, nine island platforms and three passing lines adapted or rebuilt

In the federal transport investment plan for 2010, federal funding for the project was estimated to be € 556 millions for the first stage of development (2006 prices). € 303.5 millions had been spent up to 2005. € 215 million of federal funds were to be invested between 2006 and 2010. Beyond this period a shortfall of € 37.6 millions had to be made up.[7]

Operations

The line between Augsburg and Munich is a major traffic axis and part of the Magistrale (trunk line) for Europe from Budapest through Vienna to Paris. It is used daily by about 300 trains and is one of Germany’s busiest line with a mixture of goods trains, regional passenger trains and long-distance high-speed trains.

Each hour an Intercity-Express train and an InterCity train run from Munich via Ulm to Stuttgart. Additional ICE trains run from Munich to Augsburg, branching to Nuremberg or Würzburg and on to further destinations. A similar service pattern also operates in the reverse direction.

Regional-Express trains also run hourly between Munich and Augsburg, alternating to/from Ulm and Donauwörth.

From Mammendorf to Munich central station the line runs parallel to line S3 of the Munich S-Bahn of the MVV.

References

1. ^{{cite book|title=Eisenbahnatlas Deutschland (German railway atlas) |publisher= Schweers + Wall | year= 2009 |isbn= 978-3-89494-139-0|pages=106–7, 163–6}}
2. ^{{cite book|author=Wolfgang Klee |title=Bayerische Eisenbahngeschichte - part 1: 1835-1875, Bayern Report 1| publisher=Hermann Merker Verlag|location= Fürstenfeldbruck |year=1994|language=German}}
3. ^{{cite book|editor=DB ProjektBau GmbH|title=Ausbaustrecke Augsburg–München. Bauen bei der Deutschen Bahn |publisher= DVV Media Group |location= Hamburg 2011, {{ISBN|978-3-7771-0434-8}} |pages= 26 f, 29–32, 38. |language=German}}
4. ^{{cite book|publisher=Deutscher Bundestag |url=http://dip21.bundestag.de/dip21/btd/16/117/1611730.pdf |title=Umsetzung von Projekten des Neubaus, Ausbaus und der Erhaltung der Bundesschienenwege in Bayern |postscript= (Federal Government response to question from Dr. Anton Hofreiter, Bettina Herlitzius, Winfried Hermann, other MPs and Alliance '90/The Greens, printed material 16/11730) |date=27 January 2009|language=German|accessdate=20 January 2013}}
5. ^{{cite journal|journal=Today's Railways Europe|page=53|issue=188|date=August 2008|title=München–Augsburg quadrupling}}
6. ^{{cite web |url= http://www.br.de/themen/aktuell/inhalt/bahnstrecke-augsburg-muenchen100.html |title= München - Augsburg: Ein Feuerwerk für die "Rennstrecke" |date= 10 December 2011 |language= German |accessdate= 15 December 2011 |deadurl= yes |archiveurl= https://web.archive.org/web/20120107122807/http://www.br.de/themen/aktuell/inhalt/bahnstrecke-augsburg-muenchen100.html |archivedate= 7 January 2012 |df= }}
7. ^{{cite web |publisher= Bundesministerium für Verkehr, Bau und Stadtentwicklung |url= http://www.bmvbs.de/cae/servlet/contentblob/28080/publicationFile/125/investitionsrahmen-plan-bis-2010-fuer-die-verkehrsinfrastruktur-des-bundes-irp.pdf |title= Investitionsrahmenplan bis 2010 für die Verkehrsinfrastruktur des Bundes |format= PDF |date= April 2007 |language= German |accessdate= 15 December 2011 |deadurl= yes |archiveurl= https://web.archive.org/web/20120314014616/http://www.bmvbs.de/cae/servlet/contentblob/28080/publicationFile/125/investitionsrahmen-plan-bis-2010-fuer-die-verkehrsinfrastruktur-des-bundes-irp.pdf |archivedate= 14 March 2012 |df= }}

External links

{{commons category|Bahnstrecke München-Augsburg|Munich–Augsburg railway}}{{Magistrale for Europe}}{{coord missing|Bavaria}}{{DEFAULTSORT:Munich-Augsburg railway}}

8 : Railway lines in Bavaria|High-speed railway lines in Germany|Rail transport in Augsburg|Rail transport in Munich|Railway lines opened in 1840|1840 establishments in Bavaria|Buildings and structures in Fürstenfeldbruck (district)|Buildings and structures in Aichach-Friedberg

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/22 5:34:16