请输入您要查询的百科知识:

 

词条 Nenjiang–Greater Khingan Forest railway
释义

  1. Line Description

  2. History

  3. Rail connections

  4. See also

  5. References

Nenjiang–Greater Khingan Forest railway or Nenlin railway ({{zh|s=嫩林铁路|t=嫩林鐵路|p=nènlín tiělù}}), is a single-track railroad in northeastern China between Nenjiang and the town of Gulian, in Mohe County. It is also known as the Nenjiang–Mohe railway or Nenmo railway (嫩漠铁路). Both of the railway's terminals are located in Heilongjiang Province. In between, the line traverses the Greater Khingan range of Inner Mongolia. Much of the line is located within the jurisdiction of the Greater Khingan Forest District, a special forestry prefecture that covers parts of both Inner Mongolia and Heilongjiang.

The line has a total length of {{convert|667|km|0|abbr=on}}.[1] It was built and completed in four sections from 1964 to 1972. Major cities and towns along route include Nenjiang, Jiagedaqi, the prefectural seat, and Mohe, the northernmost county in China.

Line Description

In the south, the Nenlin railway begins in Nenjiang on the eastern bank of the Nen River. After crossing the river, the line enters Hulunbuir, a prefectural city and formerly a League of Inner Mongolia. The line heads north and gradually climbs into the Greater Khingan Range. After following the Gan River to Jiagedaqi, the railroad turns north and reenters Heilongjiang at Tayuan. It turns northwest at Tahe and follows the panhandle to Mohe, the northernmost county in China.[1] In the north, the line terminates at Gulian, a town just west of Mohe's county seat.

At Nenjiang, the line intersects with the Fuyu–Nenjiang (Funen) and Nenjiang–Heishanbao railways. In recent year, the Nenlin and Funen railroads have been collectively referred to as the Fuyu - Xilinji railway (富西铁路).[1]

History

The Nenjiang–Greater Khingan Forest railway was built by the People's Liberation Army's Corps of Engineers. Construction began in 1964.[1] The Jiagedaqi to Tahe section was the first to open, in 1966, followed by the Jiagedaqi to Nenjiang section in 1967.[1] The Tahe to Zhangling section followed in 1968 and the northernmost section from Tahe to Gulian opened in 1972.[2] In all, 156 soldiers lost their lives during the construction. They are buried in martyr's cemeteries in Jiagedaqi and Tahe.[3]

Rail connections

  • Nenjiang: Fuyu–Nenjiang railway

See also

{{Portal|Railways}}
  • List of railways in China
  • Rail transport in Inner Mongolia

References

1. ^(Chinese) 富西线铁路将进行扩能改造 2009-11-06
2. ^(Chinese) 铁道兵修建的主要铁路(二) Accessed on 2010-05-29
3. ^(Chinese) 铁道兵修建的铁路-嫩林铁路(五) Accessed on 2010-05-29
{{DEFAULTSORT:Nenjiang-Greater Khingan Forest Railway}}

3 : Railway lines in China|Rail transport in Heilongjiang|Rail transport in Inner Mongolia

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/30 22:27:04