词条 New Savannah Bluff Lock and Dam
释义

  1. Purpose

  2. History

  3. Current uses

  4. Structure

  5. Gallery

  6. Notes

  7. References

  8. External links

{{Infobox dam
| name = New Savannah Bluff Lock and Dam
| image = NSBLDDCP 5167 054.jpg
| image_caption =
| name_official =
| dam_crosses = Savannah River
| res_name = Savannah River
| plant_turbines = 0
| plant_capacity = 0 MW
| plant_annual_gen =
| location =Richmond County, Georgia / Aiken County, South Carolina, United States
| operator = Army Corps of Engineers
| dam_length = 360 ft (379 m)
| dam_height = 15 feet
| dam_width_base =
| construction_began =
| opening = 1937
| cost =
| res_capacity_total =
| res_catchment =
| res_surface =
| extra =
}}

New Savannah Bluff Lock and Dam is a dam with inactive lock at the site of the dead town of New Savannah, Georgia on the Savannah River south of Augusta, Georgia.

Purpose

The dam was constructed by the Army Corps of Engineers for commercial navigation purposes to serve the city of Augusta, located approximately {{convert|13|mi|km}} upstream. It does not serve a hydroelectric power generation or flood control function.[1]

History

Located at river mile 187.4, the lock and dam was authorized by the 1930 and 1935 Rivers and Harbors Acts to facilitate commercial navigation on the upper reaches of the Savannah River. The structure was completed in 1937. The last commercial shipping to use the lock ceased in 1979 and the structure and upstream channel fell into disuse.[1] In 1999 the Corps of Engineers proposed demolishing and removing the dam, but local outcry over the resulting impact to users of the impounded pool resulted in the United States Congress declaring in 2000 that the dam would be repaired and then turned over to a local government to be maintained, however the work never received funding.[2]

The Water Infrastructure Improvements for the Nation Act (the WIIN Act), deauthorized the lock and dam and directed the Army Corps to construct fish passage across the existing dam while maintaining the impoundment of water. The deepening of the Savannah River to allow Neopanamax-sized ships reach the Port of Savannah caused saltwater to damage spawning grounds of the endangered shortnose sturgeon near the mouth of the river. Allowing fish passage upriver of the New Savannah Bluff dam to historic spawning grounds was identified as a mitigation to this damage. {{As of|2018|06}}, the Army Corps presented five alternatives to allow fish passage and expects to select a plan in 2019 and begin construction in 2021.[3]

Current uses

The dam serves water supply users including one municipality, five industries, and one

sod farm; water-related recreation opportunities such as general boating and fishing and

specialized rowing and powerboat race events; and regional economic development and tourism. It is also operated to pass some migratory anadromous fish species. The upstream pool extends through downtown Augusta to near the I-20 bridges.[1]

Structure

This project consists of a lock chamber, dam, operation building, and a {{convert|50|acre|m2|adj=on}} park and recreation area. The dam is {{convert|360|ft|m}} long with five vertical lift gates. Each gate is {{convert|60|ft|m}} long and located between concrete piers. The two gates on each end of the dam are {{convert|12|ft|m}} high, overflow type. The three middle gates are {{convert|15|ft|m}} high, non-overflow type. All are remotely controlled from the J. Strom Thurmond project. The lock is on the Georgia side of the river adjacent to the dam. The lock’s usable chamber is {{convert|56|ft|m}} wide and {{convert|360|ft|m}} long and the lift height is approximately {{convert|15|ft|m}}. Construction of this concrete gravity structure supported by timber piles was completed in 1937.[1]

Gallery

Notes

This article contains public domain text from the Corps of Engineers.

References

1. ^  New Savannah Bluff Lock and Dam Project; Savannah River Georgia and South Carolina; Section 216; Disposition Study; Final Report; September 8, 2000
2. ^  Pavey, Rob. Stimulus bill could aid dam; Augusta Chronicle; January 22, 2009
3. ^{{cite web |url=http://www.augustachronicle.com/news/20180703/corps-unveils-options-for-lock-and-dam |title=Corps unveils options for Lock and Dam |last=Corwin |first=Tom |date=July 3, 2018 |website=augustachronicle.com |publisher=Gatehouse Media |access-date=July 6, 2018 |archiveurl=https://web.archive.org/web/20180707004212/http://www.augustachronicle.com/news/20180703/corps-unveils-options-for-lock-and-dam |archivedate=July 6, 2018 |quote= }}

External links

  • Construction General; New Savannah Bluff Lock and Dam; US Army Corps of Engineers
  • New Savannah Bluff Lock & Dam Park; City of Augusta
{{coord|33.37263|-81.94079|format=dms|display=title|type:landmark}}{{Savannah River dams}}

7 : Dams in Georgia (U.S. state)|Transport infrastructure completed in 1937|Buildings and structures in Richmond County, Georgia|Buildings and structures in Aiken County, South Carolina|United States Army Corps of Engineers dams|Dams completed in 1937|Dams on the Savannah River

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/16 14:00:11