词条 | North Bank tunnel |
释义 |
|name = North Bank tunnel project |image = |location = Waitaki River, New Zealand |owner = Meridian Energy |status = Proposed |th_fuel_primary = Hydropower |th_combined_cycle = |ps_electrical_capacity= {{convert|200|MW|abbr=on}} |commissioned = |decommissioned = }} The North Bank tunnel concept was a hydroelectric scheme being developed by Meridian Energy on the Waitaki River in Canterbury, New Zealand. The $993 million project was expected to produce an additional {{convert|1100|to|1400|GWh}} per annum, and take up to {{convert|260|m3/s}} of water from Lake Waitaki. The project would have resulted in a {{convert|275|GWh}} per annum reduction in output from the Waitaki hydro station.[1] Discovery of geological faultlines prompted a rethink of the project, including consideration of using a canal instead of a tunnel.[2] Work on the project was suspended in January 2013 due to a forecast of flat demand for electricity for the next five years.[3] This project is at a similar location to Project Aqua, a hydroelectric power proposal abandoned by Meridian in 2004. Resource consent processIn December 2008, Environment Canterbury granted water use consents for this project.[4] Appeals against this decision were made by Ngai Tahu, Ngai Tahu Fishers People Inc, the Lower Waitaki River Management Society and Black Point farmer Garth Dovey.[5] The appeal hearings were held in the Environment Court during June and July 2009,[6] with water rights being granted in September 2009.[7] See also{{stack|{{Portal|New Zealand|Water|Renewable energy}}}}
References1. ^{{cite news|url=http://www.odt.co.nz/the-regions/north-otago/63515/meridian-outlines-details-link-dam|title=Meridian outlines details, link to dam|last=Bruce|first=David|date=1 July 2009|publisher=Otago Daily Times|accessdate=1 July 2009}} 2. ^{{cite news|url=http://www.nzherald.co.nz/business/news/article.cfm?c_id=3&objectid=10673853|title=Faultlines spark redesign in Waitaki power project|publisher=New Zealand Herald|date=16 September 2010}} 3. ^{{cite news| url=http://www.oamarumail.co.nz/news/meridian-suspends-land-negotiations/1723832/| title=Meridian suspends land negotiations| date=20 January 2013| first=Jacquie |last=Webby| publisher=Oamaru Mail | archiveurl=https://web.archive.org/web/20130212130003/http://www.oamarumail.co.nz/news/meridian-suspends-land-negotiations/1723832/ | archivedate=12 February 2013}} 4. ^{{cite news|url=http://www.odt.co.nz/the-regions/north-otago/37276/meridian-gains-approval-tunnel-power-scheme|title=Meridian gains approval for tunnel power scheme|first=David|last=Bruce|date=24 December 2008|publisher=Otago Daily Times|accessdate=2008-12-24}} 5. ^{{cite web|url=http://www.odt.co.nz/the-regions/north-otago/41463/four-appeals-received-against-tunnel-scheme|title=Four appeals received against tunnel scheme|publisher=Otago Daily Times|first=David|last=Bruce|date=31 January 2009}} 6. ^{{cite news|url=http://www.odt.co.nz/the-regions/north-otago/47426/appeals-may-take-5-weeks|title=Appeals may take 5 weeks|first=David|last=Bruce|publisher=Otago Daily Times|date=14 March 2009}} 7. ^{{cite news|url=http://www.stuff.co.nz/timaru-herald/news/2905561/Meridian-wins-water-rights-for-hydro-project|title=Meridian wins water rights for hydro project|last=Cogle|first=Fleur|date=26 September 2009|publisher=Timaru Herald|accessdate=2009-09-26}} External links{{coord missing|New Zealand}} 5 : Hydroelectric power stations in New Zealand|Tunnels in New Zealand|Proposed hydroelectric power stations|Proposed power stations in New Zealand|Buildings and structures in Canterbury, New Zealand |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。