请输入您要查询的百科知识:

 

词条 Ormonde Wind Farm
释义

  1. Planning

  2. Construction

  3. See also

  4. References

  5. External links

{{Infobox power station
| name = Ormonde Wind Farm
| name_official =
| image = Vattenfall REpower 5M offshore wind turbine.jpg
| image_caption = Wind turbine at Ormonde Wind Farm, March 2011
| image_alt =
| coordinates = {{coord|54|6|N|3|24|W|type:landmark_region:GB|display=inline,title}}
| country = England, United Kingdom
| location = West of Barrow-in-Furness, Irish Sea
| status = O
| construction_began = May 2010
| commissioned = February 2012
| decommissioned =
| cost =
| owner = Vattenfall
| operator =
| ps_units_operational = 30 x 5 MW
| ps_units_manu_model = REpower 5M
| wind_hub_height = {{convert|100|m|ft|0|abbr=on}}
| wind_rotor_diameter = {{convert|126|m|ft|0|abbr=on}}
| wind_rated_speed =
| wind_farm_type = Offshore
| ps_site_area = {{convert|8.7|km2|sqmi|1|abbr=on}}
| wind_offshore_depth = {{convert|17|-|21|m|ft|0|abbr=on}}
| wind_offshore_distance = {{convert|9.5|km|mi|1|abbr=on}}
| ps_electrical_capacity = 150 MW
| ps_electrical_cap_fac = 38.5 %
| ps_annual_generation = 500 GWh
| website = {{url|www.vattenfall.co.uk/en/ormonde.htm}}
| extra =
}}

The Ormonde Wind Farm is a wind farm west of Barrow-in-Furness in the Irish Sea. The wind farm covers an area of {{convert|8.7|km2}}. It has a total capacity of 150 MW and is expected to produce around 500 GWh of electricity per year.[1]

Planning

Originally the Ormonde project was planned as a hybrid wind and natural gas powered electricity generation plant supplied from the Ormonde South and Ormonde North gas fields. The project was developed by Eclipse Energy. In 2008, Vattenfall bought Eclipse Energy and the project was developed as wind energy only. The project management company throughout the project has been Offshore Design Engineering.[1]

Construction

Construction started in 2010 and was completed in August 2011.[2][3] Prysmian provided submarine power cable connections including 27 km of 33 kV inter-array cables to connect the wind turbines and a 42 km of 132 kV export cable to connect the wind farm to the substation.[4]

30 turbines each with 5 MW nameplate capacity are provided by REpower and electrical works were to be carried out by Areva.[5] Steel foundations for generators were developed and designed by OWEC Tower and produced by Burntisland Fabrications.[6] Logistics and assembly services are provided by Harland and Wolff. Generators were installed by A2SEA.[7] The first four steel foundations were delivered in July 2010,[8] and were installed by a joint venture of Scaldis and Geosea BV.

The wind farm was commissioned on 22 February 2012 and is now fully operational.[9]

See also

{{stack|{{Portal|England|Weather|Renewable energy}}}}
  • Barrow Offshore Wind Farm
  • List of tallest buildings and structures in Barrow-in-Furness
  • Wind power in the United Kingdom

References

1. ^http://www.ode-ltd.co.uk/projects/ormonde-wind-farm-11.html
2. ^{{cite news|url= http://www.rechargenews.com/energy/wind/article214033.ece|title= Vattenfall starts construction work on Ormonde wind farm|newspaper = ReCharge| publisher = NHST Media Group| first = Matthew | last = Wolstenholme|date=2010-05-04|accessdate=2010-07-16| id ={{subscription required}}}}
3. ^{{cite news|url= https://www.bbc.co.uk/news/uk-england-cumbria-14384889|title= Work on Ormonde Wind Farm off Barrow completed| agency = BBC News|date=2011-08-03|accessdate=2011-08-16}}
4. ^http://www.power-technology.com/projects/ormonde-offshore-wind-farm{{Unreliable source?|reason=domain on WP:BLACKLIST|date=June 2016}}
5. ^{{cite news |url= http://www.newenergyfocus.com/do/ecco/view_item?listid=1&listcatid=32&listitemid=2304 |title= Work contracts awarded for Ormonde offshore wind hybrid | first = Rachel | last = Johnson |work = NewEnergyFocus.com |date=2009-02-26 |accessdate=2010-07-16}}
6. ^{{cite news |url= http://www.upstreamonline.com/live/article172631.ece |title= Burntisland bags wind job |newspaper = Upstream Online | publisher = NHST Media Group |date=2009-02-20 |accessdate=2010-07-16 | id = {{subscription required}}}}
7. ^{{cite news |url= http://www.rechargenews.com/energy/wind/article216435.ece |title= A2SEA bags contract for work on Vattenfall's Ormonde project |newspaper = ReCharge | publisher = NHST Media Group | first = Karl-Erik | last = Stromsta |date=2010-06-01 |accessdate=2010-07-16 | id = {{subscription required}}}}
8. ^{{cite news |url= http://www.rechargenews.com/energy/wind/article221830.ece |title= Foundations for Vattenfall's Ormonde wind farm on the way |newspaper = ReCharge | publisher = NHST Media Group | first = Darius | last = Snieckus |date=2010-07-15 |accessdate=2010-07-16}}
9. ^businessGreen news website

External links

{{Commons category|Ormonde offshore wind farm}}
  • Ormonde Wind Farm (Vattenfall's website)
  • LORC Knowledge - Datasheet for Ormonde Wind Farm
  • Ormonde Wind Farm - Jacket Installation
  • [https://www.bbc.co.uk/news/science-environment-14412189 BBC - Three steps to build a wind farm]
  • Foundocean Project references
{{Vattenfall}}{{Wind power in the United Kingdom}}

4 : Offshore wind farms in the Irish Sea|Wind farms in England|Vattenfall wind farms|Buildings and structures in Barrow-in-Furness

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/11/11 5:22:47