词条 | London Bridge station |
释义 |
| name = London Bridge | symbol = rail | manager = Network Rail | owner = | locale = Southwark | borough = London Borough of Southwark | platforms = 15 | access = yes | access_note =[1] | fare_zone = 1 | railcode = LBG | dft_category = A | image_name = London January 5 2018 (47) London Bridge Station (38813334494).jpg | caption = Main station concourse in January 2018 | coordinates = {{coord|51.5044|-0.0857|type:railwaystation_region:GB|display=inline,title}} | map_type = Central London | years1 = 14 December 1836 | events1 = Opened | events2 = | original = London & Croydon Railway | pregroup = South Eastern Railway London, Brighton & South Coast Railway | postgroup = Southern Railway
London Bridge is a central London railway terminus and connected London Underground station in Southwark, south-east London. It occupies a large area on three levels immediately south-east of London Bridge, from which it takes its name. The main line station is the oldest railway station in London fare zone 1 and one of the oldest in the world having opened in 1836. It is one of two main line termini in London to the south of the River Thames (the other being Waterloo) and is the fourth-busiest station in London, handling over 50 million customers a year. The station was originally opened by the London and Greenwich Railway as a local service. It subsequently served the London and Croydon Railway, the London and Brighton Railway and the South Eastern Railway, thus becoming an important London terminus. It was rebuilt in 1849 and again in 1864 to provide more services and increase capacity. Local services from London Bridge began to be electrified at the turn of the 20th century, and had spread to national routes by the 1930s. The station was extensively rebuilt by British Rail in the 1970s, along with a comprehensive re-signalling scheme and track alignment. It was further developed in the 2010s to better accommodate the Thameslink route which provides a connection to Gatwick Airport, Luton Airport and Crossrail. London Bridge is served by Southeastern services from Charing Cross and Cannon Street to destinations in southeast London, Kent and East Sussex and is a terminus for many Southern commuter and regional services to south London and numerous destinations in South East England. Thameslink services from Bedford, Cambridge and Peterborough to Brighton and other destinations in Sussex and Kent began serving the station in 2018. LocationThe main line station is one of 19 UK stations managed by Network Rail.[3] It has a ticket hall and entrance area with its main frontage on Tooley Street, and other entrances on Borough High Street and within the main line station concourse. It is one of two mainline London termini south of the River Thames, the other is Waterloo.[4] The Underground station is on the Jubilee line and the Bank branch of the Northern line.[5] Several London Buses routes, including 43 and RV1, pass the station; some via the bus station.[6] River buses use the nearby London Bridge City Pier.[7] HistoryLondon Bridge station was opened on 14 December 1836, making it the oldest London railway terminus that is still running.{{sfn|Jackson|1984|p=144}} It was not the earliest station in the London metropolitan area, as the London and Greenwich Railway had opened stations at Spa Road (in Bermondsey) and {{Stnlnk|Deptford}} on 8 February 1836. The completion of the line into London Bridge was postponed because of delays in constructing a bridge at Bermondsey Street. From 10 October 1836, trains were able to operate as far as the east end of this bridge, with passengers having to walk the last {{convert|300|yards}}.{{sfn|Jackson|1984|p=145}} The station has had several changes of ownership and complete rebuilds since opening.{{sfn|Jackson|1984|p=144}} London and Greenwich Railway stationThe original station had four tracks and was {{convert|60|ft}} wide and {{convert|400|ft}} long. It was approached through a pair of iron gates.{{sfn|Gordon|1910|p=187}} Three tracks led into two platforms as a stub end of a viaduct.{{sfn|Jackson|1984|p=145}} The station was entirely exposed to the weather until a tarred canvas roof was erected in 1840.{{sfn|Jackson|1984|p=145}} Sixteen columns and fourteen beams from this structure were retrieved in 2013 and given to the Vale of Rheidol Railway in Aberystwyth, Wales for use in a planned railway museum.[8] Before completing the train shed, the London and Greenwich Railway entered into an agreement with the proposed London and Croydon Railway for the latter to use its tracks from Corbett's Lane, Bermondsey, and to share its station. However, the Greenwich railway had underestimated the cost of building the long viaduct leading to London Bridge and was not able to build a sufficiently large station for the traffic for both companies, and so in July 1836 it sold some land adjacent to its station (then still under construction) to the Croydon railway to build their own independent station.{{sfn|Turner|1977|p=42}} London and Croydon Railway stationThe London and Brighton Railway and the South Eastern Railway (SER) were also planning routes from London to Brighton and Dover respectively, and the British Parliament decided that the London and Greenwich line should become the entry corridor into London from South East England. The two railways were therefore required to share the route of the London and Croydon Railway from near Norwood (which in turn shared the route of the London and Greenwich Railway from Bermondsey to London Bridge). As a result, in 1838 the London and Croydon Railway obtained powers to enlarge the station it was then constructing at London Bridge, before it had opened for traffic.{{sfn|Turner|1977|pp=26–39}} The London and Croydon Railway opened its line and began using its station on 5 June 1839; the London and Brighton Railway joined it on 12 July 1841, followed by the South Eastern Railway in 26 May 1842.{{sfn|Jackson|1984|pp=145–146}} It was soon found that the viaduct approaching London Bridge would be inadequate to deal with the traffic generated by four railways, so it was widened by the Greenwich Railway between 1840 and 1842, doubling the number of tracks to four. The new lines, intended for the Croydon, Brighton and South Eastern trains, were situated on the south side of the existing Greenwich line, whereas their station was to the north of the London Bridge site, leading to an awkward and potentially dangerous crossing of one another's lines. The directors of the companies involved decided to exchange sites; the London and Greenwich Railway would take over the newly completed London and Croydon Railway station, whilst a new joint committee of the Croydon, Brighton and South Eastern companies would demolish the first station and build a new one on its site.{{sfn|Turner|1977|pp=176–9}} Joint stationPlans for a large new station were drawn up, designed jointly by Lewis Cubitt, John Urpeth Rastrick and Henry Roberts.[9] Drawings were published in the Illustrated London News and George Bradshaw's Guide to the London and Brighton Railway 1844. They show 'a quasi-Italianate building with a picturesque campanile'.{{sfn|Ellis|1971|p=223}} It opened for business in July 1844 while only partially complete, but events were taking place which would mean that the bell tower would never be built, and the new building would only last five years.[10] In 1843 the SER and Croydon railway companies became increasingly concerned by the high tolls charged by the London and Greenwich Railway for the use of the station approaches, and gained Parliamentary approval to build their own independent line into south London to a new station at Bricklayers Arms, which was tenuously described as a "West End terminus". This line opened on 1 May 1844 and most of the services from these two companies were withdrawn from London Bridge, leaving only the Greenwich and Brighton companies using London Bridge station.{{sfn|Jackson|1984|p=147}} The Greenwich company was on the brink of bankruptcy and so was forced to lease its lines to the SER, which took effect from 1 January 1845.{{sfn|Jackson|1984|pp=150–1}} The next year the Croydon and Brighton companies, along with other small railways, merged to form the London Brighton and South Coast Railway (LB&SCR).{{sfn|Jackson|1984|p=152}} Consequently, there were only two companies serving London Bridge. The LB&SCR used the unfinished joint station until it was demolished in 1849 and a larger building constructed.{{sfn|Christopher|2015|p=152}} South Eastern Railway stationThe SER took over the second London and Greenwich station (which had been built for the London and Croydon Railway) and sought to develop that site rather than continue to invest in the former joint station, which became the property of the LB&SCR. The SER station was therefore rebuilt and enlarged between 1847 and 1850, to a design by Samuel Beazley.{{sfn|Ellis|1971|p=223}} At the same time yet further improvements were made to the station approaches, increasing the number of tracks to six, which entirely separated the lines of the two railways.{{sfn|Turner|1978|p=23}} Once these extensions were complete the SER closed its passenger terminus at Bricklayer's Arms and converted the site into a goods depot in 1852.{{sfn|Jeffs|2013|p=12}} London Bridge station remained the London terminus of the SER until 1864 when its station was again rebuilt.{{sfn|Christopher|2015|p=152}} Five of the existing platforms were converted into a through station to enable the extension of the main line into central London and the opening of Charing Cross railway station, and in 1866 to Cannon Street station.[11] In 1899 the SER entered into a working amalgamation with the London Chatham and Dover Railway (LC&DR) to form the South Eastern and Chatham Railway Companies Joint Management Committee. Junctions were laid to enable trains through London Bridge to reach the LC&DR stations at Holborn Viaduct and St Pauls.{{sfn|Jackson|1984|p=158}} London Brighton and South Coast Railway stationThe LB&SCR took over the unfinished joint station, which they demolished in 1849 and opened a temporary station in 1850.[12] This was rebuilt and enlarged in 1853-4 to deal with the additional traffic from the lines to Sydenham and {{Stnlnk|Crystal Palace}}. A three-storey box-like structure in Italian style was erected, with the name of the railway emblazoned on the top parapet.{{sfn|Jackson|1984|p=152}} In 1859 the LC&DR applied to the LB&SCR for running powers from Sydenham to London Bridge, but was refused.{{sfn|Bradley|1979|p=6}} However, some ticketing arrangement was made between the two companies as the LC&DR advertised connections to and from London Bridge in its timetables in The Times and Bradshaw's Railway Guide for July 1861.{{sfn|Bradshaw|1861|p=16}}[13][13] This arrangement was short-lived pending the construction of the LC&DR line to Holborn Viaduct.{{sfn|Jackson|1984|pp=191,195}} The LB&SCR also built the Terminus Hotel at the station in 1861. It was designed by Henry Currey, architect for St Thomas's Hospital and had 150 public rooms over seven stories.{{sfn|Jackson|1984|p=154}} It was unsuccessful because it was on the south bank of the river, so was turned into offices for the railway in 1893. It was destroyed by bombing in 1941.{{sfn|Jackson|1984|pp=156–157}} An Act of Parliament of 1862 gave the LB&SCR power to enlarge the station further.{{sfn|Thomas|1963|p=26}} Over the next few years under the direction of new Chief Engineer Frederick Banister,[14] the company built four more platform-faces in an adjoining area to the south of its existing station to cope with additional traffic generated by the completion of the South London Line and other suburban lines to Victoria station.{{sfn|Turner|1978|pp=185–193}} This had a single-span trussed-arch roof measuring {{convert|88|by|655|ft|m|abbr=on}}, and was designed by J. Hawkshaw and Banister.[14] During the first decade of the twentieth century LB&SCR station at London Bridge was again enlarged, but overall London Bridge station remained a "sprawling confusion".{{sfn|Heap|1980|p=78}} The chaotic nature of the station at the turn of the century was described in John Davidson's poem, "London Bridge": {{Quote|text=Inside the station, everything's so old, So inconvenient, of such manifold Perplexity, and, as a mole might see, So strictly what a station shouldn't be, That no idea minifies its crude And yet elaborate ineptitude. The South London Line from London Bridge to Victoria was electrified in 1909 with an experimental overhead system. It was successful and other suburban services were electrified including the line to Crystal Palace in 1912.{{sfn|Turner|1979|pp=172–179}} Because of World War I, the line to Croydon was not electrified until 1920.{{sfn|Turner|1978|pp=206–207}} Southern Railway stationThe Railways Act 1921 led to the Big Four grouping in 1923. All of the railways of southern England combined to form the Southern Railway (SR), bringing the London Bridge complex under single ownership.{{sfn|Jackson|1984|p=160}} The wall that divided the Chatham and Brighton stations was partially knocked through in 1928 to provide an easier interchange between stations. This allowed a greater range of platforms to be used for the increasingly frequent suburban rail services to London Bridge.{{sfn|Jackson|1984|p=162}} Between 1926 and 1928 the Southern Railway electrified the SE&CR suburban lines at London Bridge using a third rail system, adapting the existing LB&SCR routes to it at the same time. The first electric services ran on 25 March 1928 from London Bridge to Crystal Palace via Sydenham, followed by a peak hour service to Coulsdon North on 17 June. This was followed by electric services to Epsom Downs via West Croydon, Crystal Palace via Tulse Hill, and Streatham Hill, and to Dorking North and Effingham Junction via Mitcham on 3 March 1929.{{sfn|Jackson|1984|p=160}} At the same time as electrification, the SR installed colour light signalling. The Southern Railway electrified the Brighton Main Line services to Brighton and the South Coast, providing a full service to {{rws|Three Bridges}} on 17 July 1932. This was following by a full electric service to Brighton and West Worthing on 1 January 1933, followed by services to Seaford, {{rws|Eastbourne}} and {{rws|Hastings}} on 7 July 1935 and to {{rws|Bognor Regis}} and {{rws|Littlehampton}} on 3 July 1938.{{sfn|Jackson|1984|p=161}} By the 1930s, a regular feature of London Bridge traffic was a glut of commuter services all departing at or shortly after 5:00 pm. A typical timetable included 12-car services to Brighton, Eastbourne and Littlehampton, all between 5:00 and 5:05. "The fives" continued to run until the mid-1970s.{{sfn|Jackson|1984|p=161}} Both the London Bridge stations were badly damaged by bombing in the London Blitz in December 1940 and early 1941. The shell of the two stations was patched up but the former Terminus Hotel, then used as railway offices, was rendered unsafe and demolished.{{sfn|Ellis|1971|p=223}} British Railways stationBritish Railways (BR) took over responsibility for the station in 1948 following nationalisation of the railways. They did not consider London Bridge a priority at first, and the war-torn damage of the station remained into the 1960s.{{sfn|Jackson|1984|p=167}} Electrification of the lines into London Bridge continued during the 1950s and 1960s, with the final steam service running in 1964, when the line to Oxted and Uckfield was replaced by diesel / electric multiple units.{{sfn|Jackson|1984|pp=166–167}} By the early 1970s the station could no longer cope with the volume of traffic. Between 1972 and 1978, BR significantly redeveloped the station and its approaches.{{sfn|Eddolls|1983|pp=31–32}} This included a £21 million re-signalling scheme, and a new station concourse designed by N. D. T. Wikeley, regional architect for the Southern Region. This was opened 14 December 1978. New awnings were added over the former SER platforms, but the arched Brighton roof was left. It has been described by The Oxford companion to British Railway History as "one of the best modern station reconstructions in Britain".{{sfn|Simmons|Biddle|1997|p=291}} Patronage to London Bridge tailed off from a peak in the early 1970s. The station remained popular for through routes to the City and the West End, but the number of terminal trains declined significantly by the early 1980s.{{sfn|Jackson|1984|p=356}} The bridge over the station's north end became Grade II listed in January 1988, while Platforms 9–16 (the former LB&SCR side) became listed the same that December.[16][17] In 1991, a "Thameslink 2000" project was proposed that would improve services between London Bridge and the Great Northern lines.{{sfn|Gourvish|Anson|2004|p=314}} It was originally hoped the work would be complete by 1997.[18] A £500 million refurbishment programme was announced by Railtrack in 1999, which would have seen the station complex rotated by 90 degrees, and large amount of shopping space added.[19] Thameslink Programme{{See also|Thameslink Programme}}The station was comprehensively redeveloped between 2009 and 2017 with the rebuilding of all platforms, the addition of two major new street-level entrances, and changes to passenger concourses and retail facilities.[20] The Shard opened next to the station in 2012. It included a new entrance and roof for the terminal level concourse, and a larger bus station was constructed in front of the building.{{sfn|Network Rail|2005b|p=17, paragraph 2.25}}[21] This was followed by a major transformation programme known as Masterplan, linked to the Thameslink programme.[22] Work began in 2012 with the terminal platforms adjacent to St Thomas Street, reducing the number from nine to six and extending them to accommodate longer 12-car trains.[23] Through platforms were increased from six to nine, all of which catered for 12-car trains.{{efn|Historically, platforms 4, 5 & 6 served services to and from both Charing Cross station and the Thameslink core, creating conflicting moves and capacity problems during peak hours.}} In the redeveloped station, Charing Cross services were assigned four new dedicated platforms (6, 7, 8 and 9), and Thameslink services to platforms 4 and 5.[24] The existing platforms for Cannon Street services on the north side of the station were also rebuilt.[25] During the works, Charing Cross trains did not call at the station for most of 2015–16 as the platforms were rebuilt, followed by Cannon Street trains from 2016–17.[26][27] Thameslink services to/from the Thameslink core did not stop between 2015 and May 2018, when an all day service with significantly enhanced frequency began as the programme of works was completed.[28] As part of the rebuilding works, the listed northern wall of the terminus train-shed was demolished and replaced with a new retaining wall, and the listed bays of the roof over the terminating platforms were dismantled and stored.{{sfn|Network Rail|2005b|p=17, paragraph 2.27}} Each of the rebuilt platforms has its own full length platform canopy.[29] The footbridge dating from the 1970s that linked platforms for passenger interchange was also demolished, replaced by an interchange concourse underneath the platforms accessed by lift, stairs and escalator. This required the demolition of brick vaults between Stainer and Weston Streets, which were pedestrianised and became part of the new concourse. A wider route was created through the Western Arcade to Joiner Street and the underground station by relocating existing shops in to renovated barrel vaults.{{sfn|Network Rail|2005b|p=17, paragraph 2.26}} Two major new street level entrances were opened to the south on St Thomas Street, and to the north, on Tooley Street.{{sfn|Network Rail|2005b|p=17, paragraph 2.24}} This required demolishing the 1893 SER office building.[30] The refurbished station was officially opened by Prince William, Duke of Cambridge on 9 May 2018. The total estimated value of the project was around £220 million.[31] {{Clear}}National Rail stationThe station's platform configuration is:
The platforms are linked together by a large street-level concourse, offering a ticket office, retail facilities and waiting areas, with entrances on St Thomas Street and Tooley Street. Services{{Railways around South Bank RDT}}London Bridge is the fourth busiest station in the United Kingdom, serving around 54–56 million passengers a year.[32][33] Typical services from the station are:
The typical weekday off-peak service in trains per hour (tph) is:
The typical weekday off-peak service in trains per hour (tph) is:
The typical weekday off-peak services in trains per hour (tph) is:[35]
The Thameslink timetable through London Bridge was introduced in May 2018. The typical weekday off-peak service in trains per hour (tph) is:[36][37]
Thameslink |next={{stn|East Croydon}} or {{rws|Norwood Junction}} or {{rws|Deptford}} |col={{TL colour}} }}{{rail line one to two|previous={{rws|Waterloo East}} |route1=Southeastern South Eastern Main Line |next1={{rws|Orpington}}|col={{SE colour}}|route2=Southeastern SE Metro (London Charing Cross) |next2={{stn|Lewisham}}}}{{rail line one to two|previous={{rws|London Cannon Street}}|route1=Southeastern Greenwich Line |next1={{rws|Deptford}} |col={{SE colour}}|route2=Southeastern SE Metro via New Cross |next2={{rws|New Cross}}}}{{rail line one to four|route1=Southern Brighton Main Line, Tattenham Corner Line and Redhill routes |next1={{rws|Norwood Junction}} or {{stn|East Croydon}}|route2=Southern London Bridge – Uckfield |next2={{stn|East Croydon}}|route3=Southern SN Metro via New Cross Gate |next3={{rws|New Cross Gate}}|route4=Southern SN Metro via Peckham Rye|next4={{rws|South Bermondsey}} |col={{Southern colour}}}}{{Historical Rail Insert}}{{rail line|previous={{rws|London Cannon Street}} or {{rws|Waterloo East}}|next=Spa Road|route=South Eastern and Chatham Railway Greenwich line |col={{SECR colour}} }}{{rail line|previous=Blackfriars Road|next=Spa Road|route=South Eastern Railway South Eastern Main Line |col={{SER colour}} }}{{s-rail|title=LUL}}{{s-line|system=LUL|line=Jubilee|previous=Southwark|next=Bermondsey|type2=Stratford}}{{s-line|system=LUL|line=Northern|previous=Borough|next=Bank|type=Morden|type2=NorthBank|notemid=City Branch}}{{s-end}}{{Clear}} London Underground station{{Infobox London station| name = London Bridge | symbol = underground | image_name = London Bridge tube stn Tooley Street entrance.JPG | caption = Tooley Street entrance | manager = London Underground | access = yes | access_note =[38] | fare_zone = 1 | locale = Borough | borough = London Borough of Southwark | years1 = 1900 | years2 = 7 October 1999{{sfn|Day|Reed|2010|p=207}} | events1 = Opened | events2 = Jubilee line started | original = City & South London Railway | platforms = 4 The Underground station is served by the Jubilee line and the Bank branch of the Northern line. In {{Tubeexits list|year}}, it was the {{tubeexits list rank|London Bridge station}} station on the network with {{Tubeexits list|London Bridge station}} million users. It is the only station on the London Underground network with "London" in its name (while the NR termini are named, for instance, "London Waterloo" the Underground station is simply named "Waterloo").[39][40] There are two platforms on each line and two main sets of escalators to and from the Tooley Street ticket hall. All four platforms are directly accessible from the Borough High Street entrance/exit. There is an emergency exit to Joiner Street.[41] Northern lineThe first underground station at London Bridge was part of the second section of the City & South London Railway (C&SLR). The company had been formed on 28 July 1884 with the intention of constructing a line under the Thames from {{LUL stations|station=King William Street}} to Stockwell via Elephant and Castle and Kennington, which opened on 18 December 1890.{{sfn|Day|Reed|2010|pp=40, 43, 44}}{{sfn|Rose|1999}} No station was provided at London Bridge; the first station south of the river was at Borough. King William Street was found to be badly placed owing to a steep incline towards the station from underneath the Thames, which limited its capacity.{{sfn|Day|Reed|2010|p=46}} When the decision was made to extend the C&SLR northwards to Moorgate, a new pair of tunnels was constructed from north of Borough station on a new alignment providing a more convenient route and the opportunity to open a station at London Bridge. The tunnels to King William Street and the station were closed and the extension and London Bridge station opened on 25 February 1900.{{sfn|Rose|1999}}{{sfn|Day|Reed|2010|p=46}} The station entrance was originally at Three Castles House on the corner of London Bridge Street and Railway Approach, but has since been moved to Borough High Street and Tooley Street. The original entrance remained standing until March 2013 when it was demolished.[42] In the aftermath of the King's Cross fire in 1987, an independent report recommended that London Underground investigate "passenger flow and congestion in stations and take remedial action".{{sfn|Fennell|1988|p=169}} As a consequence, the congested Northern line platforms were rebuilt during the late 1990s, increasing the platform and circulation areas for the opening of the Jubilee Line Extension.[43] The station is arranged for right-hand running because it is in a stretch of the Northern line (from just south of Borough to just south of {{LUL stations|station=Moorgate}}) where the northbound line is to the east of the southbound, instead of to the west.[44] Jubilee lineThe Jubilee line station is between {{LUL stations|station=Southwark}} and {{LUL stations|station=Bermondsey}}. It opened on 7 October 1999 as part of the Jubilee Line Extension, although trains had been running through non-stop from the previous month.{{sfn|Horne|2000|p=80}}{{sfn|Day|Reed|2010|p=207}} It took months of major engineering works to relocate buried services in the surrounding streets to enable the Jubilee line's construction.{{sfn|Day|Reed|2010|p=201}} A new ticket hall was created in the arches under the main-line station, with entrances at Joiner Street and Borough High Street.{{sfn|Day|Reed|2010|p=210}} During excavations a variety of Roman remains were found, including pottery and fragments of mosaics; some of these are now on display in the station.[45] The Jubilee line platforms have been fitted with platform screen doors in common with all other stations on the extension.[46] There is a facing crossover to the west of the station enabling trains to terminate here.[47][48] Accidents and incidentsThere have been several recorded accidents at London Bridge station, though relatively few of these have caused fatalities.[49] The most serious accidents were:
ReferencesNotes{{notelist}}Citations1. ^{{citation step free south east rail}} Sources{{refbegin|30em}}2. ^This figure was decreased by 2.270 million due to methodological changes. Without the changes, the figure would have been 56.121 million. 3. ^{{cite web|url=http://www.networkrail.co.uk/managed-stations/ |title=Commercial information |date=April 2014 |work=Our Stations |publisher=Network Rail |location=London |page= |accessdate=12 April 2014 |deadurl=yes |archiveurl=https://web.archive.org/web/20140410040141/http://www.networkrail.co.uk/managed-stations/ |archivedate=10 April 2014 |df= }} 4. ^{{cite web|url=https://www.google.co.uk/maps/place/London+Bridge/@51.5045728,-0.0882424,17z/data=!3m1!4b1!4m5!3m4!1s0x487603509c580b6f:0x335af388238f54bc!8m2!3d51.5045728!4d-0.0860537|title=London Bridge station|publisher=Google Maps|accessdate=18 October 2017|at=Select StreetView to examine the various entrances}} 5. ^{{cite web|url=http://content.tfl.gov.uk/standard-tube-map.pdf|title=Standard Tube Map|publisher=Transport for London|accessdate=9 April 2018}} 6. ^{{cite web|url=http://content.tfl.gov.uk/bus-route-maps/key-bus-routes-in-central-london.pdf|title=Key bus routes in central London|publisher=Transport for London|accessdate=18 October 2017}} 7. ^{{cite web|url=https://tfl.gov.uk/maps/river?intcmp=29736|title=River Services Map|publisher=Transport for London|accessdate=14 February 2018}} 8. ^{{cite news|url=https://www.bbc.co.uk/news/uk-wales-mid-wales-22706442|title=London Bridge station roof set for Aberystwyth museum|date=31 May 2013|work=BBC News Wales|access-date=4 October 2016}} 9. ^{{cite journal | last = Cole | first = David | title = Mocatta's stations for the Brighton Railway | journal = Journal of transport history | volume =5 | pages =149–157 | publisher =Manchester University Press | location =Manchester | date =1958 | issn = 0022-5266 }} 10. ^{{Cite journal | title = A notable station centenary | journal = The Railway Gazette| pages = 966–7 | date = 11 December 1936}} 11. ^{{cite book |year=1983 |title= London Railways Track Map for 1870 Establishment and growth |page=23 |publisher= Quail Map Company |location= London}} 12. ^{{cite journal|title=Railway Gazette|date=11 December 1936|p=966}} 13. ^1 The Times Wednesday, 5 December 1860, p.2. 14. ^1 {{cite web|url=http://www.gracesguide.co.uk/Frederick_Dale_Banister|title=Federick Dale Banister|publisher=GracesGuide.co.uk|accessdate=10 February 2013}} 15. ^{{cite book | first = John| last = Davidson |year = 1909| month = | title = Fleet Street and Other Poems| chapter = | editor = | others = | pages = | publisher = | location = London| ISBN= | url = }} 16. ^{{NHLE|num=1385629|desc=Bridge Over North End, London Bridge Station|date=8 January 1988|accessdate=16 February 2018}} 17. ^{{NHLE|num=1385808|desc=London Bridge Station, Platforms 9–16 (Brighton Side)|date= 19 December 1988|accessdate=16 February 2018}} 18. ^{{cite news|first=Michael|last=Dynes|title=Faster London rail links planned|newspaper=The Times|location=London, England|date=25 September 1991|p=3|accessdate=16 February 2018|url=http://find.galegroup.com/ttda/infomark.do?&source=gale&prodId=TTDA&userGroupName=kccl&tabID=T003&docPage=article&searchType=BasicSearchForm&docId=IF501883326&type=multipage&contentSet=LTO&version=1.0}} 19. ^{{cite news|first=Saeed|last=Shah|title=London Bridge station set for £500m redesign|newspaper=Times|location=London, England|date=20 November 1999|p=26|accessdate=16 February 2018|url=http://find.galegroup.com/ttda/infomark.do?&source=gale&prodId=TTDA&userGroupName=kccl&tabID=T003&docPage=article&searchType=BasicSearchForm&docId=IF500989906&type=multipage&contentSet=LTO&version=1.0}} 20. ^{{cite web|url=https://www.networkrail.co.uk/spotlight-christmas-thameslink-programme/|title=Spotlight on Christmas 2017: Thameslink Programme|work=Network Rail|year=2017|accessdate=16 February 2018}} 21. ^{{cite web |url=http://www.networkrail.co.uk/uploadedFiles/networkrailcouk/Contents/Improvements/London_Bridge/Documents/LondonBridgeRedevelopment_leaflet.pdf |title=London Bridge Redevelopment |accessdate=11 December 2016|archiveurl=https://web.archive.org/web/20130806235154/http://www.networkrail.co.uk/uploadedFiles/networkrailcouk/Contents/Improvements/London_Bridge/Documents/LondonBridgeRedevelopment_leaflet.pdf|archivedate=6 August 2013}} 22. ^{{cite web|last1=Somers|first1=Mark|title=THAMESLINK PROGRAMME|url=http://www.infrarail.com/_downloads/presentations/IF14_Thameslink.pdf|website=www.infrarail.com|publisher=Network Rail|accessdate=15 February 2018|date=7 May 2014}} 23. ^{{cite web |url=http://test2.ice.org.uk/ICE_Web_Portal/media/eastofengland/Thameslink-KO2-London-Bridge-Presentation.pdf |title=Thameslink KO2 Presentation |accessdate=11 December 2016}} 24. ^{{cite web |url=https://www.southeasternrailway.co.uk/travel-information/thameslink-programme |title=Thameslink Programme |accessdate=11 December 2016}} 25. ^{{cite web|url=http://www.thameslinkprogramme.co.uk/london-bridge-rebuild-moves-final-phase|title=London Bridge rebuild moves into final phase|work=Thameslink Programme|date=6 September 2016|accessdate=9 April 2018}} 26. ^{{cite web|url=http://www.thameslinkprogramme.co.uk/charing-cross-trains-call-london-bridge-rail-station-monday-changes-planned-weekend|title=No Charing Cross trains to call at London Bridge rail station from Monday|website=www.thameslinkprogramme.co.uk}} 27. ^{{cite web|url=https://www.thameslinkrailway.com/about-us/the-thameslink-programme/major-service-changes-2015-2018-during-london-bridge-work|title=Major service changes until January 2018|website=www.thameslinkrailway.com}} 28. ^{{cite web|url=https://www.thameslinkrailway.com/about-us/the-thameslink-programme/major-service-changes-2015-2018-during-london-bridge-work|title=Major Service changes until 2018 during London Bridge work|publisher=Thameslink Railway|accessdate=16 February 2018}} 29. ^{{cite web|url=http://www.london-se1.co.uk/news/view/7345|title=First new platforms of rebuilt London Bridge Station take shape|work=london-se1.co.uk}} 30. ^{{cite news|url=http://www.huffingtonpost.co.uk/rooksana-hossenally/britsh-heritage-versus-future-enterprise_b_1204776.html|title=How Far Should We Go in Sacrificing Our Heritage For 21st Century Enterprise?|date=16 January 2012|work=Huffington Post}} 31. ^{{cite press release|url=https://balfourbeatty.com/news/balfour-beatty-proud-to-be-part-of-the-transformation-of-london-bridge-station/?year=2018&parentId=1247|title=Balfour Beatty proud to be part of the transformation of London Bridge station|work=Balfour Beatty|date=10 May 2018|accessdate=15 June 2018}} 32. ^{{cite news|url=https://www.networkrailmediacentre.co.uk/news/new-station-control-office-unites-rail-staff-at-london-bridge-as-concourse-opening-approaches|title=New station control office unites rail staff at London Bridge as concourse opening approaches|work=Network Rail Media Centre|date=2 June 2016|accessdate=14 February 2018}} 33. ^{{cite web|url=https://www.networkrail.co.uk/running-the-railway/our-routes/south-east/london-bridge-improvements/|title=London Bridge improvements|publisher=Network Rail|accessdate=14 February 2018}} 34. ^{{cite web|url=https://www.southeasternrailway.co.uk/travel-information/live-travel-information/may-timetable|title=May timetable|publisher=South Eastern Railway|accessdate=20 June 2018}} 35. ^{{cite web|url=https://www.railplan2020.com/timetables|title=Timetables|publisher=RailPlan20/20|accessdate=20 June 2018}} 36. ^{{cite web|url=https://www.thameslinkrailway.com/travel-information/plan-your-journey/thameslink-services-to-new-destinations|title=New Train Routes|publisher=Thameslink Railway|accessdate=20 June 2018}} 37. ^{{cite web|url=http://www.thameslinkprogramme.co.uk/key-dates-service-changes|title=Key dates and service changes|publisher=Thameslink Railway|accessdate=20 June 2018}} 38. ^{{citation step free tube map}} 39. ^{{Citation LU usage 2007 onwards}} 40. ^{{cite web|url=http://content.tfl.gov.uk/standard-tube-map.pdf|title=Standard Tube Map|publisher=Transport for London|accessdate=26 August 2017}} 41. ^{{cite map|url=https://www.ianvisits.co.uk/blog/wp-content/uploads/2015/07/london-bridge.jpg|title=London Bridge Axonometric Map|publisher=Transport for London|accessdate=16 June 2018}} 42. ^{{cite book|title=Labyrinth: A Journey Through London's Underground by Mark Wallinger|editor=Louise Coysh|p=95|publisher=Art / Books|year=2014|isbn=978-1-908-97016-9}} 43. ^{{Cite book|url=https://www.worldcat.org/oclc/51945284|title=Jubilee Line extension : from concept to completion|last=Eng.|first=Mitchell, Bob, C.|p=23|date=2003|publisher=Thomas Telford|isbn=0727730282|location=London|oclc=51945284}} 44. ^{{cite book |last=Yonge |first=John |editor-last=Jacobs |editor-first=Gerald |title=Railway Track Diagrams 5: Southern & TfL |edition=3rd |date=November 2008 |origyear=1994 |publisher=Trackmaps |location=Bradford on Avon |isbn=978-0-9549866-4-3 |at=map 39B |ref=harv }} 45. ^{{cite journal|url=https://www.newscientist.com/article/mg14820001-000-boudicca-rampaged-through-the-streets-of-south-london/|title=Boudicca rampaged through the streets of south London|work=New Scientist|date=21 October 1995|accessdate=1 October 2017}} 46. ^{{cite web|url=https://www.railway-technology.com/features/feature49489/|title=Mind The Gap|work=Railway Technology|date=9 February 2009|accessdate=16 February 2018}} 47. ^{{cite web|url=https://www.whatdotheyknow.com/request/175555/response/438758/attach/3/LU%20Track%20Map.pdf?cookie_passthrough=1|title=Inter Infraco Track Boundaries}} 48. ^{{cite web|url=http://carto.metro.free.fr/cartes/metro-tram-london/|title=Detailed London transport map}} 49. ^{{cite web|url=http://www.railwaysarchive.co.uk/eventlisting.php?location=701&page=4&submit=Go|title=Accident Archive :: The Railways Archive|website=www.railwaysarchive.co.uk}} 50. ^1 {{cite book | first = Tom| last = Middlemass| authorlink = | author2 = | year =1995 | month = | title = Stroudley and his Terriers| chapter = Chapter 5| editor = | others = | edition = | pages = | publisher = Pendragon| location = York| isbn = 1-899816-00-3| url = }} 51. ^{{cite book |last=Trevena |first=Arthur |title=Trains in Trouble |volume= Vol. 1 |year=1980 |publisher=Atlantic Books |location=Redruth |isbn=0-906899-01-X |page=34 }} 52. ^{{cite book |title=Southern Electric 1909–1979 |first=G. T. |last=Moody |origyear=1957 |year=1979 |edition=Fifth |publisher=Ian Allan Ltd |location=Shepperton |page=37 |isbn=0 7110 0924 4}} 53. ^{{cite book|first= G. T. |last= Moody |year= 1960 |title=Southern Electric: the history of the world's largest suburban electrified system |edition=3rd |page=138 |publisher=Ian Allan |location= Hampton Court}} 54. ^{{cite web |url=https://www.nsers.org/jan-dec-89.html |title=January 1989 to December 1989 |publisher=Network South East Railway Society |first=John P |last=McCrickard |date=6 October 2016 |accessdate=26 June 2018}} 55. ^{{Cite news |last= Tendler |first= Stewart |title= IRA rush-hour bomb injures 29 at station |newspaper= The Times |location= London |date=29 February 1992}} 56. ^{{cite web|url=https://www.theguardian.com/uk-news/2017/jun/03/london-bridge-closed-after-serious-police-incident-reports|title=Police race to establish if London Bridge attackers were part of network|first1=Robert|last1=Booth|first2=Vikram|last2=Dodd|first3=Lisa|last3=O'Carroll|first4=Matthew|last4=Taylor|date=4 June 2017|publisher=|via=The Guardian}}
External links{{Commons category}}
21 : Jubilee line stations|London Underground Night Tube stations|Northern line stations|Tube stations in the London Borough of Southwark|Former City and South London Railway stations|Railway stations opened in 1900|Railway termini in London|Railway stations in the London Borough of Southwark|Network Rail managed stations|Former London, Brighton and South Coast Railway stations|Former South Eastern Railway (UK) stations|Railway stations opened in 1836|Thameslink railway stations|Railway stations served by Southern|Railway stations served by Southeastern|Charles Henry Driver railway stations|Henry Roberts railway stations|Lewis Cubitt railway stations|Railway stations located underground in the United Kingdom|London station group|1836 in London |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。