词条 | Plutonium Finishing Plant |
释义 |
The Plutonium Finishing Plant (PFP), also known as 'Z Plant', was part of the Hanford Site nuclear research complex in Washington, US.[1][2][3][4][5] OperationsThe plant began in 1949 with the purpose of on-site production of plutonium metal in a form suitable for weapons at Hanford.[1][2] It also participated in programs to recycle plutonium. One of the projects was the use of mixed plutonium-oxide uranium-oxide (MOX) fuel in the Fast Flux Test Facility (FFTF). For that project, one of the PFP's tasks was to perform quality assurance for the fuel pins that had been constructed for the FFTF by outside vendors, such as Kerr-McGee, NUMEC, and Babcock & Wilcox.[1][5] The major activities at PFP generally included:
DivisionsPlutonium Conversion Facility
Cleanup and demolitionBefore the last four major facilities at the plant could be demolished, approximately 20 years of work was completed to stabilize approximately 20 tons (nearly 18 metric tons) of plutonium-bearing material by 2004;[6] remove legacy plutonium from plant systems by 2005;[7] ship all weapons-grade plutonium out of the plant and to the Savannah River Site by 2009;[8] remove 238 large pieces of contaminated equipment, including glove boxes and fume hoods, and approximately 50 plutonium processing tanks;[9] and demolish numerous plant support facilities, including the vault complex used for secure storage of plutonium by 2012.[10] That preparatory work has been called the most hazardous cleanup work at the Hanford Site and PFP has been called Hanford's most hazardous building.[11] The Department of Energy's PFP Closure Project intends to have the entire facility cleaned and destroyed down to a concrete slab in 2017[12], with all contaminated materials moved to other sites.[1] Open-air demolition of the plant's last four remaining major facilities began in November 2016[13] on the plant's Plutonium Reclamation Facility. Demolition of the second major facility, the Americium Recovery Facility, also known as the "McCluskey Room" because of a facility accident in 1976, began in January 2017[14] and was completed in March 2017.[15] Demolition of the third remaining major facility, the ventilation stack and fan house, was completed in July 2017.[16] Demolition of the last of four major remaining facilities, the Main Processing Facility, began in July 2017. [17] As of December 2017, all demolition is on hold, after contamination was found as far away as 10 miles from the site, and found in two car air filters that were checked by a Hanford contractor and deemed clean, but rechecked by an independent lab and were found to have small amounts of radioactive contamination.[18] See also
Notes1. ^1 2 3 4 {{cite web | title = Plutonium Finishing Plant | url = http://www.hanford.gov/rl/uploadfiles/FACT_PFP_0606.pdf | publisher = Hanford / US Govt | accessdate = 2009-01-20 | deadurl = yes | archiveurl = https://web.archive.org/web/20060926023643/http://www.hanford.gov/rl/uploadfiles/FACT_PFP_0606.pdf | archivedate = 2006-09-26 | df = }} "From 1949 to 1989, U.S. Department of Energy contractors operated the Plutonium Finishing Plant (PFP) to process plutonium nitrate solutions into a solid form (hockey puck-sized “buttons” or oxide powder) for shipment to the nation’s weapons production facilities." 2. ^1 2 3 4 5 6 7 {{cite web | url = http://gc.energy.gov/NEPA/nepa_documents/EIS/eis0244f/eis0244f_a.html | title = Final Environmental Impact Statement - Plutonium Finishing Plant Stabilization, May 1996 EIS-0244F | accessdate = 2009-10-01 | publisher = US DOE}} 3. ^1 {{cite journal | url = http://www.redorbit.com/news/science/551586/nuclear_incinerator_torn_down_at_plutonium_finishing_plant/index.html | author = Cary, Annette | journal = Tri-City Herald, Kennewick, Wash. | title = Nuclear Incinerator Torn Down at Plutonium Finishing Plant | date = 2006-06-27 | accessdate = 2009-10-01 }} 4. ^1 2 {{ cite web | url = http://www.osti.gov/energycitations/servlets/purl/805998-ZttWY8/native/805998.pdf | title = History of Hanford Site Defense Production (Brief) | author = Gerber, M.S. | date = Feb 2001 | accessdate = 2009-10-01 |publisher = Fluor Hanford / US DOE }} 5. ^1 {{cite web | title = Plutonium Finishing Plant | url = http://www.hanford.gov/rl/uploadfiles/FACT_PFP_0606.pdf | publisher = Hanford / US Govt | accessdate = 2009-01-20 | author = Lini, D.C. and L. H. Rodgers | deadurl = yes | archiveurl = https://web.archive.org/web/20060926023643/http://www.hanford.gov/rl/uploadfiles/FACT_PFP_0606.pdf | archivedate = 2006-09-26 | df = }} 6. ^{{Cite journal|last=Gerber|first=M. S.|date=2004-01-14|title=Plutonium Finishing Plant (pfp) Stabilization & Packaging Project|url=https://www.osti.gov/scitech/biblio/821208-W2lOje/native/|language=English}} 7. ^{{Cite journal|last=Charboneau|first=S. L.|date=2006-02-01|title=The Deactivation Decontamination & Decommissioning of the Plutonium Finishing Plant (pfp) a Former Plutonium Processing Facility at Doe Hanford Site|url=https://www.osti.gov/scitech/servlets/purl/875914|language=English|location=Richland, WA}} 8. ^{{Cite news|url=http://www.tri-cityherald.com/news/local/hanford/article32178795.html|title=Timeline: 25 years of Hanford cleanup|work=tri-cityherald|access-date=2017-08-10|language=en}} 9. ^{{Cite news|url=http://www.tri-cityherald.com/news/local/hanford/article35937831.html|title=Most hazardous Hanford plant nears start of tear down|work=tri-cityherald|access-date=2017-08-10|language=en}} 10. ^{{Cite news|url=http://www.seattletimes.com/seattle-news/hanford-vault-complex-that-stored-weapons-plutonium-demolished/|title=Hanford vault complex that stored weapons plutonium demolished|date=2012-04-17|work=The Seattle Times|access-date=2017-08-10|language=en-US}} 11. ^{{Cite news|url=http://www.tri-cityherald.com/news/local/hanford/article106593777.html|title=Demolition may start soon on Hanford’s most hazardous building|work=tri-cityherald|access-date=2017-08-10|language=en}} 12. ^{{Cite web|url=http://www.hanford.gov/page.cfm/PFP|title=Plutonium Finishing Plant - Hanford Site|website=www.hanford.gov|access-date=2017-08-10}} 13. ^{{Cite news|url=http://www.tri-cityherald.com/news/local/hanford/article111966012.html|title=After 20 years, Hanford plutonium plant starts to fall|work=tri-cityherald|access-date=2017-08-10|language=en}} 14. ^{{Cite news|url=http://www.tri-cityherald.com/news/local/hanford/article124647349.html|title=Demolition of Hanford’s historic McCluskey Room starts|work=tri-cityherald|access-date=2017-08-10|language=en}} 15. ^{{Cite news|url=http://www.tri-cityherald.com/news/local/hanford/article141747469.html|title=Room where Hanford’s Atomic Man injured now history|work=tri-cityherald|access-date=2017-08-10|language=en}} 16. ^{{Cite news|url=http://www.tri-cityherald.com/news/local/hanford/article161758603.html|title=200-foot Hanford stack falls with help from explosives|work=tri-cityherald|access-date=2017-08-10|language=en}} 17. ^{{Cite news|url=http://www.tri-cityherald.com/news/local/hanford/article163998772.html|title=End in sight for Hanford plutonium processing center — Z Plant starts to fall|work=tri-cityherald|access-date=2017-08-10|language=en}} 18. ^{{Cite news|url=https://www.seattletimes.com/seattle-news/environment/watchdogs-find-radioactive-contamination-in-cars-hanford-had-declared-clean/|title=Watchdogs find radioactive contamination in cars Hanford had declared clean|date=2018-02-21|work=The Seattle Times|access-date=2018-02-22|language=en-US}} 2 : Nuclear technology in the United States|Nuclear fuel infrastructure in the United States |
随便看 |
|
开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。