请输入您要查询的百科知识:

 

词条 Main Street Tunnel
释义

  1. Description

  2. History

  3. References

  4. External links

{{Infobox tunnel
|name= Main Street Tunnel
|image= Main Street Tunnel, Welland.jpg
|caption= Western approach to the Main Street Tunnel
|lanes= 4
|route=Niagara Road 27 and the unsigned designation of Highway 7146
|location=Welland Canal, Welland, Ontario
|length=
|width=
|height=
|below=
|traffic=
|opened = {{start date and age|May 20, 1972}}
|closed=
|toll=
|coordinates= {{coord|42.993222|-79.216704|type:landmark|display=inline,title}}
}}

The Main Street Tunnel, located in Welland, Ontario, Canada, is an underwater tunnel, carrying Niagara Road 27 and the unsigned designation of Highway 7146 under the Welland Canal. It is named as a part of East Main Street.

The structure was built as a part of the Welland By-Pass project. Its construction was relatively easy since, like the Townline Tunnel, it was constructed at the same time as the channel above it and a simple cut and cover. The tunnel was officially opened on May 20, 1972.

Description

The tunnel links Highway 406 on the west side of the canal, which travels north to St. Catharines to Highway 140 on the east side, which travels south to Port Colborne. Niagara Regional Road 27 also provides a connection from Welland eastward to Niagara Falls.

The tunnel provides four lanes for traffic, two in each direction, separated by a full-height concrete wall. There is also a sidewalk for pedestrian use in the westbound section.

History

The Main Street Tunnel, like the nearby Townline Tunnel to the south, was constructed in the early 1970s as part of the Welland Bypass of the Welland Canal. It was built using a cut and cover technique, whereby the tunnel was excavated, the concrete poured, and the structure buried, on top of which the canal channel was built. This avoided costly boring beneath an active waterway; the structure cost C$11 million. This price was split 50–50 between Transport Canada and the St. Lawrence Seaway Authority. The tunnel opened with a parade featuring the Welland Police pipe band and various officials on the morning of May 20, 1972.[1]

References

1. ^Tunnel Opening

External links

  • Newspaper clippings about the tunnel's construction
{{Crossings navbox
|structure = Crossings
|place = Welland Canal
|bridge = Main Street Tunnel
|bridge signs =
|upstream = Townline Tunnel (Highway 58A),
Highway 3/Main Street Lift Bridge (Port Colborne)
|upstream signs =
|downstream = Canboro Road (former Highway 20),
Thorold Tunnel (Highway 58)
|downstream signs =
}}{{Ontario 7000 Highways}}{{Niagara Regional Roads}}

6 : Buildings and structures in Welland|Transport in Welland|Welland Canal|Tunnels in Ontario|Tunnels completed in 1972|Road tunnels in Canada

随便看

 

开放百科全书收录14589846条英语、德语、日语等多语种百科知识,基本涵盖了大多数领域的百科知识,是一部内容自由、开放的电子版国际百科全书。

 

Copyright © 2023 OENC.NET All Rights Reserved
京ICP备2021023879号 更新时间:2024/9/30 6:35:57